Monthly Operating Repts for Oct 1984
ML20100N767
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 10/31/1984
From: Harrison F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20100N762 List:
References
NUDOCS 8412130427
Download: ML20100N767 (12)


Text

'

e APPENDIX B .

AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT 1 DATE 11/05/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OCTOPER 1984 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 786 17 761 2 784 18 757 3 781 , 19 754 4 -

779 20 749

,5 739 21 748 , , ,

601* *:'2 *- 745 6* -

  • 7 681 23 742 8 770 24 737 9 781 25 737 10 776 26 736 11 774 27 733 i

12 774 28 732 i 13 772 29 44 I

14 771 30 -7 15 768 31 -6 l

i

l. 16 765 y

i e.

1 .\

L .

\

OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 11/05/84 c COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS ,

1. UNIT NAME: BRUNSWICK UNIT 1 i NOTES I
2. REPORTING PERIOD: OCTOBER 84 I l
3. LICENSED THERMAL POWER (MWT): 2436 I l
4. NAMEPLATE RATING (GROSS MWE): 867.0 l l
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 1 1
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I i
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): .
10. REASONS.FOR RESTRICTION IF ANY:

T . . .

THIS e YR TO CUMUL MONTH DATE ATIVE 8

11. H.0URS IN REPORTING PERIOD 745.00 7320.00 66841.00
12. NUMBER OF HOURS REACTOR CRITICAL 691.10 6509.40 42907.30
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 '

1647.10

14. HOURS GENERATOR ON LINE 677.90 6329.95 40418.40
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1570009.80 14597221.36 83024515.93 i 17. GROSS ELEC. ENERGY GEN. (MWH) 522770.00 4875401.00 27422452.00 l 18. NET ELEC. ENERGY GENERATED (MWH) 506212.00 4730543.00 26344383.00
19. UNIT SERVICE FACTOR 90.99 86.47 60.47 l
20. UNIT AVAILABILITY FACTOR' 90.99 86.47 60.47
21. UNIT CAP. FACTOR (USING MDC NET) 86.01 01.80 49.89 l 22. UNIT CAP. FACTOR (USING DER NET) 82.76 78.71 48.01
23. UNIT FORCED OUTAGE RATE .00 9.08 21.21
24. SHUTDOWNS SCHED. OVER NEXT 4 MONTHS (TYPE, DATE, AND DURATION OF EACH):

IOCAL IEAK RATE TESTING 10/29/84 SIX LEEKS l

AND SNUBBER OUDGE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION --------

- 1.16 - 9

^

x, . ;

ti ,

APPENDIX ,

DOCKET NO.: 050-325 i

UNIT: Brunswick 1 DATE: November 1984 COMPLETED BY: Frances Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT 1 Brunswick Unit 1 operated at a 90.99% availability factor for the month of October with an 86.01% capacity factor. There was one powe~r reduction. The unit separated f;om the grid on Oc *9er 29, 1984, for the locql leak rate *

. testing and , snubber putage., Dhtails are in Appendix D, the Unit Shutdcyn Power Reduction Log.

There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick Unit i fuel pool.

There was one SRV failure / challenges report for September.

6

+ . - , - , . . , . . , , - , - - , ,,, - , - . -

, - , -, , . - . - - - --. ,-.-r , += .v- , . ,--,

,. v- r, .

747 ., ,

S/RV FAILURE /CNATT.ENGES REPORT DATE: 9/10/84

. TIME OF OCCURENCE: 0909 DETAILS OF S/RV's FAILURE: SRV-F013G auto lifted at 1105 psig setpoint.

SRVs F013A and E were opened manually at the RTGB. No sonic indications were received. Tailpipe temperatures indicated all three SRVs had opened and reseated. .

~

S P

b

C -

a;s - . .

a W

- , O b @ E e- 4 i D

.a 3 h Z er b # .

o ,t. e u -s 4 U M te 3 SI C

  • n = P c a a U e d 4 C @ ._5 M E. A e c- $ s U O j.g-e p a - O b @ # M ir s". > SY W c d b
  • g e

w u.

=

O be gd--a e 2 -

dW HW 25 z a  ;=ma s Us ag.& .

z<o<g H

u5* .-.az

_c wZ g -m c. -

W W g NU- 5 e

E DE~ #

WZ J J M# U " inEW2 i W

g3 bh V E

g A

WCWWo l ,

v ,

O M

e4 O

be u

C e O

O C eO t#3

. C=

Z .

E Ow -o O

.=

$ g8 P"] , Ej "j c - sc

" susuodwo3 t)l y. .C E u W b - *JI g wt U N

4 S . "5 3a ]c 3 CO6u mA 5 E va p'P -

fx iri "< y 1 ?

.:. e; .::. m o m .3 ..muns .

g 8"'t

  • g Z

< 5 m u 84 Z I M 3g <

z H E

y.  %

Z

.5 W D $

=

Q g 2 a =

W =

D E z

m E

D . lot.il**M timoQ j

$tillllitl$ @ j $ a h y3 lo Poyl*H {

$__ $2 W

""'r'M m eC ok

..2 " , , :!

'  : a l'$ $ 'c c E _C 6* g ';i .?. W ~

EN naOh . .O 3 m 7

{%ff1Dlll o .6

  • llHill* fflQ o

-$ w E. m.3. *- c. ,C .c a7 a5.2z"C "W

O cE <d IGu.c sWqd.<O ::

l '$lil un ee A o .

m

- o

  • e4 ,

%T T3 (C Y,

t. @E R Ce p o . . . .

Y -

Co

.*[.

DOCKET NO. 050-0325' f)y-UNIT SHUTDOWNS AND POWER REDUCTIONS

  • UNIT NAME Brunswick i DATE November 14AA COMPLETED BY Frances Harrt==_ '

REPORT MONIH Nenhor lor 4 TELEPHONE (919) as7_es9i

' ~5 . E

. -, [;E  ; j E5 Licensee [*, g*a. Cause & Corresteve N... I)aic c- { 2E& Event sy N0 a.1 Action to 4 j@ s j 8, g Report e fV Prevent Recurrence d

84-083 841029 S In B 2 N/A Local Leak Rate Testing and Snubiner  !

Pro ' Outage gress ,

i f

i 4

-4 a

t 2 3 4 F: Forced Reason: Method: Exhibit G Instructions ,

S: Scheduled A-Equipment Failure (Exidain) I-Manual for Preparasite of Data B-Maintenance of Test . 2-Manual Scram.

  • Entry Sheets for Licensee C-Refueling 3 Ausoniatic Scram. Event Repor (LER) File (NUREG-D-Regulatory Rest iction 0161) -

E-Operator Trsining & License Exaninalion 4-Con t,I nua t i,ons F-Adnunisitative 5-Load Reductions s Goperaisonal Errus (Explain) d-Other Eshibii I - Same Source l'3/77) llother (Esplain) .

. m APPENDIX B .

AVERAGE DAILY POWER LEVEL

, , DOCNET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 11/05/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OCTOBER 1984 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (NWE-NET) (MWE-NET) 1 -13 17 -14 2 -13 18 -14 3 -13 -

19 -14 4 -12 20 -14 5 -12 . 21 *

-15 6 - -13' ' ' -

22 -14 .

7 ~-14 23 -14 8 -14 24 -14 9 -14 25 -14 10 -13 26 50 11 -12 27 -14 12 -13 28 -13 13 -14 29 42 14 -14 30 -14 15 -14 31 17 16 -12 1.16 - 0

q- ,

- , r l

l OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 11/07/84 COMPLETED BY FRANCES HARRISC TELEPHONE (919)457-9521 OPERATING STATUS i

1. UNIT NAME: BRUNSWICK UNIT 2 i NOTES _ l
2. REPORTING PERIOD: OCTOBER 84 I i
3. LICENSED THERMAL POWER (MWT): 2436 l l
4. NAMEPLATE RATING (GROSS MWE): 867.0 1 14
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l ll
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l l!
7. MAX DEPENDABLE CAPACITY (NET MWE)- 790.0 -------------------------------;
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, l GIVE REASONS: l 9.. POWER LEVEL Td WHICH RESTRICTED.IF ANY (NET MWE): . ... l
10. REASONS FOR RESTRICTION IF ANY.

l THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 745.00 7320.00 '

78845.08

12. NUMBER OF HOURS REACTOR CRITICAL 284.24 1888.57 46615.98
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .0i
14. HOURS GENERATOR ON LINE 26.56 1593.55 43379.0:
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .Os

! 16. GROSS THERMAL ENERGY GEN. (MWH) 12388.52 3367508.86 81944229.81 l 17. GROSS ELEC. ENERGY GEN. (MWH) 3533.00 1113963.00 27223661.0:

18. NET ELEC. ENERGY GENERATED (MWH) -6490.00 1034843.00 26062661.0f l 19. UNIT SERVICE FACTOR 3.57 21.77 55.0 i
20. UNIT AVAILABILITY FACTOR 3.57 21.77 55.0' l 21. UNIT CAP. FACTOR (USING MDC NET) -1.10 17.90 41.8:
22. UNIT CAP. FACTOR (USING DER NET) -1.06 17.22 40.2!
23. UNIT FORCED OUTAGE RATE .00 2.18 15.5
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

l

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY --------

INITIAL ELECTRICITY -------- --------

, . y+ l ,

APPEtOIX D003r W.: 050-324 LNIT: Brunswick 2 IRIE: Noverber 1984 CDFIEIED BY: Frances Harrison OPERATIGIS SU M RY 1

BulBWICK INIT 2 .

J Brunswick thit 2 was synchronized to the grid on October 26,1984, after the refueling / maintenance outage. 'Ihe unit ' separated fran the grid on October 26, October 29. and October 31, 1984, for repairs of No. 9 i

bearing. Details are in Appendix D of the unit's Shutdoun Power:

  • Reduetion Ing.

. . 'Ihere are 608 BEL and 144 PMt spent fuel bundlet in.the Bru'nswick Uhit 2 fuel pool .

O

?

4 e

k e

a G

S S

, .-1

=

a DOCKETNO. OM324 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Brunswidt II s

i DATE i Ots r*=>- 1984 COMPT.ETED BY Frances Harrison REFORT MONTH TELEPHONE (919)457-9521 .

I ":- -

[7

'h *, *, Cause & Correceive l -, hY Licensec i  % paic g 5i 3 2s& Event p3 Action to j

f :_ :s yv f, g Report * ,e b g Prevent Recurrence

6 ~

i B4-022 841026 S 53.37 B 1 NA Rx shuhkur1 to hot st2] for repairs f,

on 49 bearing.

I l

j . .

i -

i

{

l .

l l- 2 3 . 4

}

'e F: Forced -

Reasdn: Method: Exhibit G Instructions S: Scheduied A Equipment Failure (Explain) l-Manual for Preparatism of Data l Entry Sheets for Licensee B Maintenance of Test - 2 Manual Scram. - ~

C Refueling 3 Automatic Scram. Event Reporn (LER) File (NUREG-

{ 0161)

D Regulatory Restriction 4

! E-Operator Training & Ucense Examination Is-Continuations i F Administrative 5-Load Reductions s G-Operational Error (Explaini 6-Other Exhibit I - Same Sou e l'8/77! II-Other (Explaini

i'

.1 i 050-0324 -

DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNITNAME Brunswicit II DATE Novettier 1984 COMPLETED Sy F1& w Harr enn REPORT MONTH October 1984 TELEPHONE (919)457-952:.

t

~.

=_ <. 5 u. 5 _

3"**

i y j' i g[=f La.ccresce 5 *,, g ., Cause & Curreceive j

y" - DJ ,

= 2 4 2 3 oc Evens 3T MO Action to iN 0 prevens Recurrence

$3 E ji5g ,

Report e 6

i 84-026 841031 S In B 1 NA Separated generator frmi grid for Progr e #9 h!aring probles.

e a

1 2 3 . 4 F: Forced Reasim: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test

  • 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulasory Resiriction 0161)

E-Operator Training & License Examination 1s-Cont,inua t ions F. Administrative 5-toad Reductions 3 G-Operational Error (Explain) 6-Other Exhibii I . Same Source (9/77) Il-Other (Esplain)

DOCKET NO. 050-0324 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswicic II  !

DATE Nove eer 1984 COMPLETED BY h Harrh REPORT MONTHOctnher 1984 TELEPHONE (919's457-9521 9 ,

_ E c

-, j2

=

j :E 5 Licensee jw, g% Cause & Correceive ,

Daic c- ;E j Event sT Q Aciion in

%.. 4 C 2$ 5 t f,i s= Report e 5.0 u$U Prevent Recurrence .

2  !!

  • 6 .

j l

84-024 841029 S 52 B 1 NA Tripped main turbine / generator in preparation for checking on hi vibratic n raaMrwJs on 99 haaring.

l .

l 1

l 1

- .g 1

l 3 4 1 2 F: Forced Reason; Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1. Manual for Preparation of Data D Maintenar.cc of Test 2-Manual Scram. Enisy Shecis for Licensee C. Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulator) Restriction 0161)

E-Operator Training & License Examination 1s-Continuations F Administrative , 5-Load Reductions s G-Operational Er ror IExplain) 6.-O t he r Estubii I Same Source r8/77) ll-Other (E splain g

.____ _________ _