ML20101C687

From kanterella
Revision as of 03:02, 29 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards License Amend Application,Revising TS 3/4.5.2 to Allow Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408
ML20101C687
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/06/1996
From: Stetz J
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101C689 List:
References
2367, NUDOCS 9603190143
Download: ML20101C687 (2)


Text

..

  • l CMWysmost ENEftGY 300 W w ue John P. Slett Toledo, OH 43652-0001 Vice President . Nucesor 419-249-2300 Mm Docket Number 50-346 License Number NPF-3 Serial Number 2367 March 6, 1996 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 1

Subject:

License Amendment Application to Revise Technical Specification 3/4.5.2, Emergency Core Cooling Systems, ECCS Subsystems -

T avg a 280 F 1 Ladies and Gentlemen:

Enclosed is an application for an amendment to the Davis-Besse Nuclear Power Station (DBNPS), Unit 1 Operating license Number NPF-3, Appendix A, Technical Specifications (TS). The proposed change involves TS 3/4.5.2, Emergency Core. Cooling Systems, ECCS Subsystems - T a 280 0F, which requiresthattheECCSpipingbeverifiedfullofw$Edrbyventingthe ECCS pump casings and discharge piping high points at least once per 18 months in accordance with Surveillance Requirement 4.5.2.b. The proposed change would allow a deferment of Surveillance Requirement 4.5.2.b for the ECCS flowpath containing HPI pump 1-2 until the Tenth Refueling Outage, which is scheduled to begin April 8, 1996. The current TS Action Statement 3.5.2.a requires that, due to the inoperability of ECCS subsystem Train 2, the plant be placed in Hot Shutdown (Mode 4) within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of the expiration of the 72-hour allowed outage time on March 7, 1996, at 1354 hours0.0157 days <br />0.376 hours <br />0.00224 weeks <br />5.15197e-4 months <br />.

ECCS subsystem Train 2 is considered inoperable due to the discovery on l March 4, 1996 that Surveillance Requirement 4.5.2.b cannot be met for a section of High Pressure Injection Pump 1-2 discharge piping downstream of normally closed motor operated discharge valve HP2A.

Toledo Edison requests that the enclosed license amendment application be approved and issued as an emergency license amendment in the manner l allowed by 10 CFR 50.91(a).

I I 9603190143 960306 PDR ADOCK 05000346 {

p PDR i

Operonng Compones.

Clweland Electnc illuminchng

. {l Toledo Edison g i

. Docket Number 50-346 i

. Liccnsa Number WPF-3 Serial Number 2367 l

  • Page 2' i

Toledo Edison has performed the attached environmental assessment and I determined that the proposed amendment, if approved, will have no '

significant impact on the environment or i1 reversible environmental consequences.  ;

' i Should you have any questions or require additional information, please  !

contact Mr. James L. Freels, Manager - Regulatory Affairs, at (419) 321-8466 l t

Very truly yours, ~

f l/ shh

-/ /

D / aj - /

Enclosure Attachments cc: W. L. Axelson, Director, NRC Region III, Division of Reactor  ;

Projects L. L. Gundrum, DB-1 NRC/NRR Project Manager Dr. Gail H. Marcus, NRC Project Director '

H. J. Miller, Regional Administrator, NRC Region III S. Stasek, DB-1 NRC Senior Resident Inspector J. R. Williams, Chief of Staff, Ohio Emergency Management Agency, '

State of Ohio (NRC Liaison)

Utility Radiological Safety Board l

l l

,