ML20101N937

From kanterella
Revision as of 15:20, 28 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 8 to Technical Requirements Manual (Trm),Per 920204 Ltr Stating That Rev 8 Dual Unit TRM & That Unit 2 Requirements Becomes Effective Upon Issuance of Unit OL
ML20101N937
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/30/1992
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101N940 List:
References
TXX-92306, NUDOCS 9207100208
Download: ML20101N937 (14)


Text

.-. . -_- - . . .

i l

l M

""""= Log # TXX 92306

1.  : File # 10010 C

~~

C~~

916 (TRH)

Ref. # 10CFR50.36 1UELECTRIC June 30, 1992 l wim.m J. c.hnL Jr.

3 aw.e nn hasthe  :

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

C0HANCHE PEAK STEAH ELECTRIC STATION (CPSES)

DOCKET NOS, 50 445 AND 50 446 TRANSHITTAL Of TECHNICAL REQUIREMENTS HANUAL (TRii),

REVISION 8 REF: 1) TV Electric letter logged TXX-92050 f rom Mr. William J. Cahill to the NRC, dated February 4, 1992 Gentlemen:

TV Electric herewith submits Revision 8 (enclosed) of the CPSES Technical Requirements Manual.

Enclosed are the following documents:

Technical Requirements Manual - 1 signed (and sworn) original Revision 8 and 10 copies Attachment (2) contains a page by-page description of the changes. As has been the 10 Electric practice in the past several TRH revisions, all changes described in the attachment have been evaluated for relative sianificance (i.e. , the group number 1, 2, 3 or 4 following each change justification as discussed in TV Electric letter TXX-88467 dated June 1, 1988). In addition, all changes applicable to CPSES Unit I have been reviewed under the TV Electric 10CFR50.59 process and found not to include any 'unreviewed safety questions."

TRH Revision 8 is being issued on June 30, 1992, and will be executed at 12:01 a.m. on July 30, 1992. After execution, compliance to the TRH through Revision 8 is required, Revision 8 may be entered into controlled copies of the TRH prior to execution as long as compliance to Revision 7 is maintained.

.100047 ,')

Lfp I S 9207100200 920630 p PDR ADOCK 05000445 i P PDR 4ao N.ouvi sireet LB.si D nas, Texas 75201 - \.t

TXX 92306 Page 2 of 2 ,

As discussed in reference 1 above. Revision 8 is a dual unit TRM which states that the Unit 2 requirements will become effective upon the issuance of the Unit 2 operating license. The TRM contains specific numbers which .

are yet to be confirmed for Unit 2. Those numbers still requiring design t confirmation, of applicability for Unit 2, have been enclosed within brackets for identification purposes. All numbers with brackets will be confirmed and the brackets removed prior to Unit 2 fuel load. ,

Several TRM changes which are currently being considered are listed in attachment (3). If you should have any questions, please contact Mr. Carl B. Corbin at (214) 812 8859.

Sincerely, AA -

William J.

aMA ahill. Jr.

CBC/vid 1 Attachments Enclosure c- Mr. R. D. Martin. Region IV Resident Inspectors, CPSES (3)

Mr. T. A. Bergman. NRR Mr. B. E. Holian NRR (25)

_... y. -4,v

- - . - . _ . - .- to 'XX 92306 Page 1 of 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION (1 the Hatter of )

)

Texas Utilities Electric Company ) Docket Nos. 50-445 and 50-446

)

(Comanche Peak Steam Electric )

Station, Units 1 and 2) )

AFFIDAVIT William J. Cahill, Jr. being duly sworn, hereby deposes and says that he is Group Vice President, Nuclear of TV Electric, the lead Applicant herein: that he is duly authorized to sign and file with the Nuclear Regulatory Conunission this transmittal of Revision 8 of the Technical Requirements Manual for the captioned facility: that he is familiar with the content thereof: and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.

4 +^ i tt > A.

William J. (4 hill, Jr. ['

Group Vice President. Nuclear STATE OF TEXAS )

)

COUNTY OF DALLAS )

Subscribed and sworn to before me, on this 29th day of June. , 1992, Lb [ .

Notary 'ublic

CPSES TRH REVISION 8 DETA! LED DESCRIPTION Page 1 TXX 92306 ATTACHMENT 2

{fgE 1p p{,8 (al geended) Graun Description i 3 See Page No(s):through page 4 31 Changes footer from "C0HANCHE PEAK UNIT 1" to

" COMANCHE PEAK - UNITS 1 AND 2" for all TRH pages.

Update:

This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.

TRH Change Request Number: TR92014.01 Related SER Section: 16 SER/SSER Impact: No 0 02 3 Adds note regarding Unit 2 applicability (Issuance of Dual Unit TRM) to Section 0. Unit 2 requirements are not effective until issuar.ce of Unit 2 operating license. Information requiring validation for Unit 2 is enclosed in brackets.

Update:

This change is needed to support a dual Unit Technical Requirements Hanual applicabic to both Units 1 and 2.

All numbers with brackets will be validated prior to Unit 2 fuel load and the brackets removed.

TRH Change Request Number TR92014.02 Related SER Section: 16 SER/SSER Impact: No 0 11 3 Adds from Technical Specifications the definition of the CORE OPERATlHG LlHITS REPORT (COLR).

Update:

This change provides consistency between the definitions in the Technical Specifications and the Technical Requirements Manual.

TRH Change Request Number: TR 92-005 Related SER Section: 16 SER/SSER Impact: No 0-16 2 (Byron precedence) Adds the dual unit Limiting Condition for Operation (LCO 3.0.5) to provide applicability definition for the Limiting Conditions for Operation. (See related change TR 92008.3 on page 0 21)

Update:

This change is needed to support a dual Unit Technical Requirements Hanual applicable to both Units 1 and 2.

TRH Change Request Number: TR 92008.1 Related SER Sectien: 16.0 SER/SSER Impact: No

CPSES VRH REVISION 8 TXX 92306 DETAILED DESCRIPTION Page 2 ATTACHMENT 2 PAGE 2 Of 8 TRM Page (11 Attadtd) Group DrittiMiaD 0 19 3 See Page No(s):through page 0 22 Adds from Technical Specifications the BASES for Specification 3.0.1 through 3.0.4.

Update:

This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.

TRM Chance Request Number: TR 92008.2 Related SER Section: 16.0 SER/SSER tmpact: No 0 22 2 (Byron precedence)-Adds the associated _ BASES 3.0.5 to support the support the applicability detinition for the Limiting Conditions for Operation (see related change TR-92008.1 on page 0 15). The BASES includes a discussion of valve identification for duti units.

Update:

This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.

TRH Change Request amber: TR 92008.3 Related SER Section: 16.0 SER/SSER Impact: No 0 23 3 See Page No(s):through page 0-26 Adds from Technical Specifications the BASES for Specifications 4.0.1 through A.0.5.

Update:

This change is needed to support' a dual Unit Technical-Requirements Manual' applicable to both Units 1 and 2.

TRM Change Request Number: TR 92008.4 Related SER Section: 16.0 SER/SSER-Impact: No 1 02 3 Adds note to APPLICABILITY statement indicating Unit 2-requirements are effective upon issuance of the Unit 2 oper& ting license.

Update:

This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.

TRM Change Request Number:-TR92014.03 Related SER Section: If SER/SSER Impact: No 1-06 3 Adds note t'o APPLICABILITY _ statement indicating Unit 2

[ _ _ _ _ _ _ _ _ _ _ _ - - - _ - - - - - - - -

.v CPSES'TRM REVISION 8 TXX-92306 DETAILED DESCRIPTION- Paga 3 ATTACHHiH1 2 PAGE 3 0F 8 TRM Page

( Alt AN10 Aid) Aflug Q11CIlp. tion requirements are effective upon issuance of the Unit 2 operating license.

Updatet This change is needed to support a dual Unit Technical Requirements-Manual applicable to both Units 1 and 2.

TRM Change Request Number: TR92014.04-Related SER Section: 16 SER/SSER Impact: No 1-09 2 See Page No(s):through page 1-13 (Table 1.2.1)

Adds brackets for plant specific numbers which require design confirmation for applicability for unit 2.

Update:

These plant spet ,' - Jonbert wi'l be confirmed and the brackets removed ,9 Lor to unit 2 fuel load. These changes are needed to support the dual unit Technical Requirements Manual applicable to units 1 and 2.-

TRM Change Request Number: TR 92 013 Related SER Section: 7.2 SER/SSER' Impact: No 1-15 3 Adds note to ADDLICABILITY statement indicating Unit 2

\_ requirements are effective upon issuance of the Unit 2

) operating license.

Update:

This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2, TRM Change Request Number: TR92014.05 Related SER-Section: 16 .

SER/SSER Impact: No 1-17 2 Adds " Units 1 and 2" to COMPENSATORY' MEASURES.

See related change TR 92-008 (LCO 3.0.5a, TRM page 0-16)

Update: .

This change are needed to support a dual Unit T*,;hnical Requirements Manual applicable to both Units 1 and 2.

TRM Change Request Number: TR-92009.1-Related SER'Section: 3.7.4 SER/SSER !mpact: No 1-17 3 Adds note to APPLICABILITY statement indicating Unit 2 requirements are effective upon issuance of the Unit-2 operating-license.

Update:

This change is needed to support a dual Unit Technical

CPSES TRM REVISION 8 TXX+92306 DETAILED DESCRIP?!ON Page 4 j ATTACHHENT 2  !

PAGE 4 0F 8 l TRM Page 1 (n Antadsd) Et9Mn Dentirttion Requirements Manual applicable to both Units 1 and 2. q TRM Change Request Number:-TR92014.06 Related SER Section: 16 SER/SSER Impact: No 1-18 2 Adds note to Table 1.4.1 stating that Unit 1 and Unit 2 control room alarms are connected to shared seismic -

instruments which are located in Unit I and common structures.

Update:

This change is needed to support a dual Unit Technical Requirements Manual applicable.to both Units 1 and-2.

TRM Change Request Number: TR-92009.2 Related SER Section: 3.7.4 SER/SSER Impact: No 1-18 2 Update sensor locations in Table.l.4.1 to indicate the Unit 1 structure or the common structure.

Update:

These changes are needed to. support a dual Unit Technical Requirements Manual applicable to both Units i 1 and-2.

TRM Change Request Numbers _TR-92009.3 Related SER Section: 3.7.4 SER/SSER Impact: No 1-19 2 See.LOCR-TR 92009.2 (TRM page 1-18),

Update:

See LDCR-TR-92009.2 (TRM.page 1-18).

TRM Change Request Number: TR-92009.4 Related SER Section: 3.7.4 SER/SSER Impact: No 1-19 2 See LDCR-TR-92009.3 (TRM page:1-18).-

Update:

See LOCR-TR-92009.3 (TRH page 1-18,.

TRM Change Request Numberi TR-92009.5 Related SER Section: 3.7.4 SER/SSER Impact: No

'l-20 2 See LOCR-TR-92009.2 (TRM page 1-18).

Update:

.See LDCR-TR-92009.2 (TRM page 1-18).

TRM hange Request Number:-TR-92009.6 Related SER Section: 3.7.4

n . .

V LCPSES TRM REVISIO'N 8-

'TXX 92306..- DETF LED DESCRIPTION ~ Page'.5

' ATTACHMENT-: 2 :

PAGE 5 0F 8-TRM- .Page

-(11 aggDded) Group Dticription SER/SSER Impact: No ,

1 20 2 See.LDCR TR 92009.3)(TRM pageL1 18).

Update:

See~LDCR-TR-92009.3 (TRM page 1 18).

TRM. Change Request Number:-TR 92009.7 Related SER1Section:.3.7.4 SER/SSER Impacts No 1-22 3 Adds note-to-APPLICABILITY statement indicating-Unit =2 requirements _are' effective upon. issuance _of-the Unit 12 operating l license; Update:-

This' change isLneeded to support a dual Unit Technical Requirements Manual applict.ble-to both Units 1 and 2.

  • TM Change Request Number: TR92014.07 ated.SER_Sectiont 16-

' " /SSER Impact: No1 2-02 1s note to APPLICABILITY statement-indicating Unit' 2 1

' .quirements are effective upon issuance of_the Unit 2 operating license.; '

Update:

This change is;needed.+o support.aldual Unit Technical

-Requirements-Manual applicable to both Units:1 and.2.

TRM Change Request-Number: TR92014 ~.08 Related SER Section: 16-SER/SSER Impact: No-

'2 04 -2 See Page No(s):through page:2-13.(Table!2.1.1) . .

Updates.the valve identification numbers':(tag numbers) to: include unit designator'as first character.(e.g.-

1CS-8455 -is: unit l'.- 2CS-845511 s" Units 2). - Tag ' numbers without!the unit designator are applicable to both -

4 units.-

Update:

'Theseichanges are needed2to.supportiaidualiUnit-Technical Requirements' Manual-_ applicable-to;both-Units-

'1 and 2.

LTRM Change Request Number: tTR-92010.1, Related:SEP. Section: 6.2-

SER/SSERl Impact:iNo 12

~

-2 Adds 1 brackets for= plant: specific. numbers which require

-designLeonfirmation for_'applicabi_litylfor-unit 2.

Update

I'

)

.= _ - _._- = L i a  :- L L -- - ---- L ' '

CPSES TRM REVISION 8' TXX 92306 DETAILED DESCRIPTION- Page 6 ATTACHMENT 2-PAGE 6 0F 8 T RM - Page (Al amended) frp.gg Description These plant specific numbers will be confirmed and the brackets removed prior to unit 2 fuel load. These changes are needed to support the dual unit Technical 4

Requirements Manual applicable to units 1 and 2.

TRH Change Request Number: TR 92010.2 Related SER Section: 6.2 SER/SSER Impact:.No 2 13 2 See Page No(s):through page 2-14 Updates Table 2.1.1 by adding the Unit 2 Airlock Hydraulic System Valves.

Update:

These changes are needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.

. TRH Change Request Number: TR 92010.3 i

Related SER Saction: 6.2

SER/SSER Impact
No 2-14 2 -See Page No(s):through.page-2-25 Updates the valve idantification numbers (tag numbers) to include unit designator as first character (e.g.

a 1C5 8455 is unit 1. 205 8455 is Unit 2), _ Tag numbers without the unit designator are applicable to both units.

, Update:

These changes are needed to support 'a dual Unit-Technical Requirements Manual applicable to both Units 1 1-and 2, 4

_ TRM Change Request Number: TR 92010.4

, Related SER Section: 6.2 SER/SSER Impact: No 2 25 2 Adds brackets for plant specific numbers which' require design confirmation for applicability for unit 2.

1 Update:

These plant specific numbers will be' confirmed and-the-brackets. removed ~ prior to unit 2 fuel load.: These changes are needed-to support-the dual-unit Technical Requirements Manual applicable to units-1 and 2.

TRM Change Request Number: TR-92010.5 Related~ SER Section: 6.2 SER/SSER Impact: No i

3-02 3 Adds note to APPLICABILITY statement, indicating Unit.2 requirements are effective upon-issuance of_the Unit 2 operating license ~.

,. . . . . _ . . . . . - . . . . , . . _ . . , ,. . . . . . . . - . ,- , ~ . . . ,, , , . .

CPSES TRH REV!SION 8 TXX 92306 DETAILED DESCRIPTION Page 7 ATTACHHEHT 2 PAGE 7 0F 8 TRH Page (Al RRRBdid) Droup Description Update:

This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.

TRH Change Request Number: TR92014.09 Related SER Section: 16 SER/SSER Impact: No 3-10 3 Adds note to APPLICABILITY statement indicating Unit 2 requirements are effective upon issuance of the Unit 2 operating license.

Update:

This change is needed to support a dual Unit. Technical Requirements Manual applicable to both Units 1 and 2.

TRH Change Request Number: TR92014.10 Related SER Section: 16

. SER/SSER Impact: No 3 12 4 Changes the instrument identification numbers (tag numbers) to include unit designator as first char 1cter, e.g.1-TI-2152-1 is Unit 1, 2-TI-2152-1 is Unit 2.

Tag numbers without the unit designator are applicable to both units.

Clarification:

These changes are needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.

TRH Change Request Number: TR-92011.1 Related SER Section: 10.3.3 SER/SSER Impact: No 3-12 3 Adds note to APPLICABILITY statement indicating Unit 2 requirements are effective upon issuance of the Unit 2 operating license.

Update:

This change is needed to support a dual Unit Technical Requirements Manual applicable to both Units 1 and 2.

TRH Change Request Number: TR92014.11 Related SER Section: 16 SER/SSER Impact: No 3-13 4 Changes the valve identification numbers (tag numbers) to include unit designator as first character, e.g. 1HV-2134 is Unit 1, 2HV-2134 is Unit 2.

Tag numbers without the unit designator are appliceble to both units.

Clarification:

These changes are needed to support a dual Unit

CPSES TRM REVIS10N'8

.TXX-92306 - LDETAILED DESCRIPTION Page 8 ATTACHMENT 2 PAGE 8-0F 8 TRM Page (n magnded) Sr_que Description

~

Technical Requirements Manual 1 applicable _to both Units 1-and 2.

TRM Change Request Numberi-TR-92011,2 Related SER.Section: 10.3.3 SER/SSER Impact: No 4-02 3 -Adds note to APPLICABILITY statement indicating-Unit-2

-requirements are effective upon' issuance of the: Unit-2 operating license.

Update:

This change is neededito support a dual Unit Technical' Requirements Manual applicable to both Units 1 and 2.-

TRM Change Request Number -TR92014,12 Related SER Section: 16 SER/SSER Impact: No i 4-05 2 See Page No(s):through-page 4-17 Updates Table 4.1.1 by separating Unit 1 devices into' Table 4.1,la.

Update:^ __

This change is needed to support a dual Unit Technical Requirements 1 Manual _ applicable-to_both Units _'l and 2, TRM Change Request Number: TR-92012,1 Related SSER Section: SSER22 8.4.1-SER/SSER Impact: No-4-18 2 See Page No(s):through page 4 30- _ _

Updates: Table 4.1.1 by separating Unit 2 devices into Table 4.1.1b, Update:: _ _

This-change-is needed to support a dual Unit Technical-Requirements Manual applicable 1to both Units 1 and 2;

-TRM Change Request Number: TR 92012.2 Related SSER Section: SSER22 8.4.1 SER/SSER Impact: No

__________._-._m__ ------.I- - - - - - - " - - - - - - - - " ' - - - - ^ - ' - - - ' " - ' ' ' ' " ' ' - ' ' - ~ ' ' -

TXX 92306 ATTACHMENT 3 PAGE 1 of 1 Several Technical Requirement Manual (TRM) changes are currently being.

considered for CPSES Units 1 and 2. Many of these changes are not directly attributable to the licensing.of Unit 2 and are not' included.in TRM Revision 8. It is however, desirable that CPSES Unit 2 be licensed incorporating many of these changes. =The TRM changer currently in the TV Electric internal review process are:

A. Revise Table 1.2.1 Technical Requirement 1.2 to reflect changes made

]

to the Technical Specifications regarding DG undervoltage testing.

B. Update Table 2.1.1 of Tcchnical Requirement 2.1 to add bonnet rel' valves to containment sump recirculation isolation valves.

C. Update Technical Requirement 3.3 to clarify which Nondestructive Examinations were used in the fracture analysis to demonstrate the fracture toughness of the feedwater isolation valve.

D. Update Table 4.1.1 of Technical Requirement 4.1 to revise the breaker type from *01L' to '00B".

E. Adds clarification to containment penetration conductor overcurrent protective devices list (Technical Requirement 4.1). The change is f

based upon ti . guidance provided in Generic Letter 91-08, F. Deletes relays from Table 4.1.la of Technical Requirement 4.1 which are not associated with containment penetration protection, d

CPSES/TRH COMANCHE PEAK STEAM ELECTRIC STATION TECHNICAL REQUIREMENTS MANUAL (TRM)-

INSTRUCTION SHEET The following instructional information and check list is being furnished to help insert Revision 8 into the Comanche Peak Steam Electric Station TRM. A description of'this revision is provided in Attachment 2 of TXX-92306, dated June 30, 1992.

Discard the old sheets and insert the new sheets, as listed below. Please refer to TXX-92306 for discussion of.when old sheets should be discarded and new sheets inserted. Keep these instruction sheets in the front of-the 1 Effective Page Listing to serve as a record of changes.

Remove Insert Technical Recuirements Manual Title Page . Title Page Table of Contents i i Administrative Controls Title Page Title Page 0-1 thru 0-17 0-1 thru 0-26 Section 1 1-1 thru l-21 1-1 thru l-22 SE tion 2 2-1 thru 2-26 2-1 thru 2-27 Section 3 3-1 thru 3-13 3-1 thru-3-13 4 (Page 1 of 2)

v

.. __ - . _ _ . . - - . _ - . -_ - a

[

Remove Insert O

-Section 4 4-1 thru 4-18 4-1 thru 4-31 List of Effective Paaes <

- EPL-1 EPL-1 thru EPL-3 EPL-1 thru EPL-3 O

(Pagel2 of 2)

.