ML20077P012

From kanterella
Revision as of 11:06, 25 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Rept for Jun 1991 for Fort Calhoun Station,Unit 1
ML20077P012
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/30/1991
From: Edwards M
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20077N998 List:
References
NUDOCS 9108150197
Download: ML20077P012 (1)


Text

_

_~ .

+

_v .

e 9 .

OPERATING DATA REPORT DOCKET NO. .$0-?R5 DATE B/R/91 _

COhlPLETED BY ML Edwards TELEPHONE Ian?i A16-2451 OPERATING STATUS

1. Unit Name: Fort Calhoun Station Not'5 Revision 1
2. Reportmit Penod: June 1991 Changes marked with "/".
3. Licensed Thermal Power IMWti: 1500
4. Nameplate Rating (Gross 31Wel: gn?
5. Design Electrical Rating (Net $1 Wen 478
e. Staximum Dependable Capacity (Gross MWel: 502 Masimum Dependable Capacity (Net MWei; 478 S. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Give Reasons:

N/A 9 Power Lesel To which Restncted.lf Any(Net MWei: N/A

10. Reasons For Restrictions. If Any: N/A This Month Yr..to.Date Cumulative
11. Houts t1 Reporting Penod 720.0 4,343.0 155,713.0
12. Number Of Houn Reactor Was Critical 720.0 4,163.0 120,951.7
13. Reactor Resene Shutdown Hours 0.0 0.0 1,309.5

- It Hours Generator On.Line 720.0 4,152.2 119,582.I

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated tMWH) 912,096.5 4,874,757.6 156,158,-246.9 17 Gross Electrical Energy Generated i_MWH1 294._926:0, 1,604,632.0 51,354,758.2
18. Net Electried Energy Generated plWH) 279,012.6 1,514,441.6 48,999,217.9 19; Unit Service Factor 100.0 95.6 76.8
00. Unit Availabihty Facto, 100.0 95.6 76.8
21. Unit Capacity Factor (Using MDC Nett 81.1 73.0 68.2 /
22. Unit Capacity Factor tusing DER Neti 81.1 73.0 66.6 /
23. Unit Forced Outage Rate 0.0 4.4 3.5 /
24. Shutdowns Scheduled Over Next 6 Sloaths tType. Date, and Duration of Eachn None
25. If Shur Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units in Test Status Prior to Commercial Operationn Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY N/A COMMERCIAL OPERATION 9108150197 910814 -

PDR ADOCK 05000285 R PDR ,

. ._ ._ _ _ _ _ _