Text
_--
4
=
Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 August 14, 1991 40?./636-2000 LIC-91-202R U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, DC 20555
Reference:
Docket No. 50-285 Gentlemen:
SUBJECT:
July Monthly Operating Report (MOR)
Please find enclosed the July 1991 Monthly Operating Report for the Fort Calhoun Station Unit No. I as required by Technical Specification Section 5.9.1.
Revisions to the " Operating Data Report" section of the May 1991 and June 1991 Monthly Operating Reports are also enclosed.
An j.rtcrease in the Maximum Dependable Capacity and Design Electrical Rating that occurred during Cycle 6 were not accounted for in the Unit Capacity Factor Cumulative Calculations for May ano June 1991.
If you should have any questions, please contact me.
Sincerely,
,fV. 5 5 6 W. G. Gates Division Manager
,f, Nuclear Operations WGG/sel oc gg Enclosures
$'d c:
LeBoeuf, Lamb, Leiby & MacRae r9 R. D. Martin, NRC Regional Administrator, Region IV Nd R. P. Mullikin, NRC Senior Resident Inspector 5
D. K. Sentell, Combustion Engineering gg R. J. Simon, Westinghouse ou Office of Management & Program Analysis (2)
INP0 Records Center
}
)}
American Nuclear Insurers i,._U t J