ML20077Q734

From kanterella
Revision as of 09:50, 25 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Page 3/4 5-3,allowing One Time Extension of Allowable Outage Time for Each RHR Pump from 72 H to 120 H Through 950430
ML20077Q734
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/10/1995
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20077Q711 List:
References
NUDOCS 9501190328
Download: ML20077Q734 (4)


Text