ML20077S219

From kanterella
Revision as of 07:36, 25 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1994 for Limerick Generating Station Unit 1 & 2
ML20077S219
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/31/1994
From: Kelley S, Muntz J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9501230332
Download: ML20077S219 (11)


Text

~- , , .- . . , _ - .

. Unwrick Cenersting Ctitle.1 4 -

_ema.

v

- PECO ENERGY ;si?JTar**'

Sanatoga, PA 19464 4920 T.S.6.9.1.6 Janurary 12, 1994 Docket Nos. 50-352 50-353 License Nos. NPF-39 i NPF-85 i

-l U. S. Nuclear Regulatory Commission .

Attn: Document Control Desk l Washington, DC 20555

Subject:

Limerick Generating Station Monthly Operating Report l For Units 1 and 2  :

Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of December 1994 forwarded pursuant to  ;

Technical Specification 6.9.1.6.

i Very truly yours, [

S A

-/W -

ha es A. Muntz j Director - S1*.e Engineering

-sjk Enclosures cc: T. T. Martin, Administrator, Region I, USNRC (w/ enclosures)

N. S. Perry, USNRC Senior Resident Inspectcr LGS (w/ enclosures)

D. R. Helwig, Vice President, Limerick Generating Station i

10007J 9501230332 941231 t

/ i PDR. ADOCK 05000352 R_ _ .

, PDR 8

L -.

.=, Docket 203, 50-352 7 Attachment to Monthly Operating Report for Dece:.ber 1994 l Limerick Generating Station Unit 1 December l'through December 31, 1994 I. Narrative Summary of Operatina Exoeriences  !

Unit 1 began the month of December at a nominal 100% of rated. thermal power (RTP).

On December 13, 1994, at 0822 hours0.00951 days <br />0.228 hours <br />0.00136 weeks <br />3.12771e-4 months <br />, power was reduced to 95.1% RTP to remove the 6A feedwater heater from service to' '

replace the level sight glass. Power was restored to 100%

RTP at 1008 hours0.0117 days <br />0.28 hours <br />0.00167 weeks <br />3.83544e-4 months <br />. On December 15, 1994, power was reduced to return the 6A feedwater heater to service. Power was i restored to 100% RTP at 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br />.

On December 18, 1994, at 0810 hours0.00938 days <br />0.225 hours <br />0.00134 weeks <br />3.08205e-4 months <br />, power was reduced to l 92% RTP for main turbine valve testing. Power was restored to 100% at 0956 hours0.0111 days <br />0.266 hours <br />0.00158 weeks <br />3.63758e-4 months <br />. j.

On December 20, 1994, at 0310 hours0.00359 days <br />0.0861 hours <br />5.125661e-4 weeks <br />1.17955e-4 months <br />, power was reduced to 97% RTP to remove the 6B feedwater heater from service to replace the level sight glass. Power was restored to 100%

RTP at 0442 hours0.00512 days <br />0.123 hours <br />7.308201e-4 weeks <br />1.68181e-4 months <br />. On December 23, 1994, power was reduced i to return the 6B feedwater heater to service. Power was  :

restored to 100% RTP at 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br />. I Unit 1 ended this operating period at 100% of RTP.

II. Challences to Main Steam Safety Relief Valves l

I There were no challenges tc tnc Main Steam Safety Relief Valves during the month of recember.

I i

1 l

l

. _,e __ - --,

y

AVERf.CE DAILY UNIT POWIR LEVEL ,

DOCKET NO. 50 - 352 +

UNIT LIMERICK UNIT 1

  • DATE JANURARY 12,1994 COMPANY PECO ENERGY COMPANY STEVEN J. KELLEY REPORT 5 ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3763 MONTH DECEMBER 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (wwE-NET) (wwE-NET) 1 1057 17 1060 2 1055 18 1060 3 1056 19 1060 4 1052 20 1056 5 1046 21 1061 6 1047 22 1057 7 1065 23 1057 8 1044 24 1056 9 1060 25 1060 10 1064 26 1064 11 1054 27 1064 12 1060 28 1060 13 1063 29 1060 14 1037 30
  • 1069 15 1061 31 1064 16 1060

._ _ __ - - _ -. -. - , , ~

- - - w OPERATING DATA REPORT ,

,. DOCKET NO. 50 - 352 -

+- _ ._

DATE JANURARY 12.1994 *

, COMPLETED BY PECO ENERGY COdPANY i STEVEN J. KELLEY

! REPORTS ENGINEER

-SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3763

  • OPERATING STATUS
1. UNIT NAME: LIMERICK UNIT 1 NOTES: THERE WAS NO LOAD DROP l
2. REPORTING PERIOD: DECEMBER. 1994 GREATER THAN 20% THIS *
3. LICENSED THERMAL DOWER (MWT): 3293 MONTH.

, = - - - --

4 NAMEPLATE RATING (GROSS MwE): 1138  ;

......... .. . +

5. DESIGN ELECTRICAL RATING (NET MwE): 1055
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 109
7. MAXIMUM DEPENDABLE CAPACITY (NET MwE): 1055

! 8. IF CHANGES OCCUR IN CAPACITY RATING 3 (ITEMS NUMBER 3 THRouOd 7) SINCE LAST REPORT. GIVE REASONS: .

9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS. IF ANY:
  • NIS
MONTH VR-TO-DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 744 8.760 78.144
12. NUMSER OF HOURS REACTOR WAS CRITICAL 744.0 7.909.2 64.108.3  ;
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0. 0 ' O.O l 14 HOURS GENERATOR ON-LINE 744.b 7.840 7 h3.025.5
15. UNIT RESERVE SHUTDOWN HOURS O.0 O b.O
16. GROSS THERMAL ENERGY GENERATED (MWM) 2.447.604 24.865.779 194.316.538
17. GROSS ELECTRICAL ENERGY GENERATED (MwH) 813.920 8.142.240 63.184.280
18. NET ELECTRICAL ENERGY GENERATED (FWH) 787.009 7.858.016 60.644.006

............ .- -= ---

PAGE 1 OF 2

--,,r-.--vw----e .- ~w- , m w- w - - . - e- < gre.- r --,w. m v mi - m-%

,e-,e co i - -ww, , - e,, + w , , - . - -4 , .- ,,,e e -

,_a.

OPERATING DATA REPORT (CONTINUED) DOCKET NO. 50 - 352 ..

DATE JANURARY 12.1994

  • THIS MONTH SR-TO-DATE CUMULATIVE .
19. UNIT SERVICE FACTOR 100.0 89.5 80.7 2D. UNIT AVAILABILITY FACTOR 100.0 89.5 80.7
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.3 85.0 73.6
22. UNIT CAPACITY FACTOR (USING DER NET) 100.3 85.0 73.6
23. UNIT FORCED OUTAGE RATE O.0 0.9 4.3 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

SCHEDULED OUTAGE FOR 1/95 IS POSTPONED DUE TO RECIC PUMP SEAL RESEATING.

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY MID APRIL 85 4/13/85 COMMERCIAL OPERATION IST QTR 86 2/01/86 PAGE 2 OF 2

. - - - .m.

. 7 -= 6

-..s

~

< UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352

.D'_______

UNIT NAME LIMERICK. UNIT 1 DATE JANURARY 12.1994 . ,

3~

REPORT MONTH DECEMBER. 1994 COMPLETED BY PECO ENERGY COMPANY STEVEN J. KELLEY .

REPORTS ENGINEER SITE ENGINEERING  ;

LIMERICK GENERATING STATION n>

TELEPHONE (610) 718-3763

-=- ________ - - ____________________- - - -- - ____________________= --- - - _______

. l l l NETHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE 3

l livkE DURATION l REASON SHUTTING DOwM EVENT CODE CODE ACTION TO '

NO,1

___=-

DATE- l (1) (HOURS)I (2) REACTOR (3) REDORT * (4) (5) PREVENT RECURRENCE I

! 43 941213 S 000.0 B 4 N/A CH HTEXCH REACTOR POWER'WAS REDUCED TO 95.1% DUE TO FEEDwATER HEATER MAINTENANCE.

4 44 941218 5i 000.0 B 4 N/A CC VALVEX REACTOR POWER WAS REDUCED TO 92% FOR MAIN TURBINE VALVE TESTING.

l - 1 i

i 1

I (1) (2) (3) (4)

F - FORCED REASON '

METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL : FOR PHEPARATION OF DATA 8 - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NOREG-0161)

! E - OPERATOR TRAINING + LICENSE EXAMINATION j F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN) l H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE 1

t

~

1 i

-- --__e- -,-w e "-ne r- m sue + tm w = -w- .--<w-e-w m- *,e --w.-.-.-=.4*--e > . , - - ww e a -e. w . re -- -- . . . . -% ,+,.-e. w .-

. I

  • L ~ ~ Docket No. 50-353 I 1

Attachment to Monthly  ;

Operating Report for j December 1994 -

' Limerick Generating Station Unit 2 December 1 through December 31, 1994 -

I. Narrative Summarv of Ooeratina Experiences Unit 2 began the month of December at 75.2% of Rated Thermal Power (RTP) in end-of-cycle coastdown. Power reduction occurred .throughout this operating period due to end-of-cycle coastdown.

On December 4, 1994, at 2211 hours0.0256 days <br />0.614 hours <br />0.00366 weeks <br />8.412855e-4 months <br />, power was reduced to 64%

RTP to perform hydraulic control unit (HCU) maintenance. On ,

December 7, 1994, HCU maintenance was completed and power ,

was restored to 72.3% RTP by 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />. ,

On December 29, 1994, at 1549 hours0.0179 days <br />0.43 hours <br />0.00256 weeks <br />5.893945e-4 months <br />, ,aower was reduced from  !

64.2% RTP slightly to place the B Reactor Feedpump in ,

service and remove the C Reactor Feedpump from service.

Power was restored to 64.2% RTP at 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br />. >

Unit 2 ended this operating period at 63.7% of RTP in end-of-cycle coastdown. -

l

-t II. Challences to Main Stgam Safety Relief' Valves There were no challenges to-the Main Steam Safety Relief Valves during the month of December.

l 1

i l

l I

1 r.. rr- ---

6 AVEQaGE DAILV UNIT POWER LEVEL '.

DOCNET NO. 50 - 353 UNIT LIMERICM UNIT 2 '

DATE JANURARY 12,1994 COkPANY PECO ENERGY COMPANY STEVEN J. KELLEY REPORTS ENGINEER SITE ENGINEERING LINERICM GENERATING STATION TELEPHONE (610) 718-3763 MONTH DECEMBER 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (wwE-NET) (MwE-NET) 1 752 17 677 2 747 18 677 3 741 19 674 4 725 20 666 5 620 21 665 6 624 22 658 7 651 23 655 l 8 702 24 651 9 720 25 646 10 713 26 646 11 700 27 642 12 702 28 638 13 702 29 618 14 695 30 638 l

15 685 31 626 16 685

m _ _ . . . . .

OPERATING DATA REPORT g '

DOCKET NO. 50 - 353 DATE JANURAR A 12.1994 -

COMPLETED BY PECO ENERGY COMPANY

.-- --__ -.. s STEVEN J. KELLEY REPORTS ENGINEER ,.

$1TE ENGINEERING LIMERICK GENERATING STATICN TELEPHONE (610) 718-3763 .!

OPERATING STATUS a _ -__ ___-_-_---.--_--_ . ..

-1 UNIY NAME: LIMERICK UNIT 2 NOTES: THERE WAS ONE LOAD DROP

- =-_ . - - - - - - - -

2. REPORTING PERIOD: DECEMBER, 1994 GREATER THAM 20% THIS
3. LICENSED THERMAL POWER (MwT): 3293 MONTH DUE END OF CYCLE +

4 NAMEPLATE RATING (GROSS MwE): 1138 COASTDOWN.

5. DESIGN ELECTRICAL RATING (NET MWE): 1055
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): 1092
7. MAXIMUM DEPENDABLE CAPACITY (NET MwE): 1055

-- _- ..----_. ---- -- - r

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROHGH 7) SINCE LAST REPORT. GIVE REASONS: .

~I

9. POWER LEVEL TO WHICH RESTRICTED.-IP ANY (NET MwE):

i

10. REASONS FOR RESTRICTIDMS. IF ANY:

THIS MONTH VR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 8.760 43.656
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8.720.4 39.363.0 'l
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

__..=- __.....-----

14 HOURS GENERATOR ON-LINE 744.0 8.658.2 38.604.9 5

15. UNIT RESERVE SHUTDOWN-HOURS 0.0 0.0 0.0 +

i

, 16. GROSS THERMAL ENERGY GENERATED (WWH) 1.672.906 .26.924.502 122.229.583 '

17. GROSS ELECTRICAL ENERGY GENERATED (MwH) 527.934 8.891.054 40.383.580
18. NET ELECTRICAL ENERGY GENERATED (MwH) 502.562 8.571.508 38.902.200 PAGE 1 OF 2 i

4 L

h e -

' .+ , . - - - . ew-. vwe + w ++ .s ~... + . - e , e v s ~ -- --u =

i s

CDERATING DATA REPORT (CONTINUED) DOCKET NO. 50 - 353 .3 DATE JANURARY 12,*994 *

.._ ....---- =__.._. __..__

THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 98.8 88.4
20. UNIT AVAILABILITY FACTOR 100.0 98.8 88.4 21, UNIT CAPACITY FACTOR (USING MDC NET) 64.0 92.7 84.5
22. UNIT CAPACITY FACTOR (USING DER NET) 64.0 92.7 84.5
23. UNIT FORCED OUTAGE RATE O.0 1.2 3.5 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

SCHEDULED REFUEL OUTAGE ON 1/28/95

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89 09/01/89 COMMERCIAL OPERATION 02/01/90 01/08/90 PAGE 2 OF 2

&V UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 353 .

6-

_e .

UNIT NAME LIMERICK UNIT 2 L,

.i DATE JANURARY 12.1994

  • REPORT MONTH DECEMSER. 1994 COMPLETED BY PECO ENERGY COMPANY STEVEN J. KELLEY e REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) T18-3763

=_...... ___... _.._. ._ .__. .___-- _. __ _ -. _ _ . _ . . . . . . . . _ _ . - - - _ ._ _ -_..__

METHOD OF LICENSEE SYSTEM ! COMPONENT l CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO MO. DATE (1) (HOURS) (2) REACTOR (3) REPORT * (4) (5) PREVENT RECURRENCE l I i 28 941204 S. 000.0 B 4 N/A RB CRDRVE REACTOR POWER WAS REDUCED TO 64% FOR H.C.U. MAINTENANCE.

29 941229 F 000.0 H 4 N/A CH PUMPXX REACTOR WAS REDUCED SLIGHTLY WHEN FEEDWATER PUMPS WERE SWAPPED.

30 941231 S 000.0 C 4 N/A CH HTEXCH REACTOR POWER WAS REDUCED TO 63.T% FOR REFUELING OUTAGE COASTDOWN.

(1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - CTHER (EXPLAIN) FILE (NUREG-0161) ,

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (S) -

'[

G - OPERATIONAL ERROR (EXPLAIN) $

H- OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE i

L b

h es-m=m-ww

,m%-,.4 e, a _ prea 4 'M