~- , , .- . . , _ - .
. Unwrick Cenersting Ctitle.1 4 -
_ema.
v
- PECO ENERGY ;si?JTar**'
Sanatoga, PA 19464 4920 T.S.6.9.1.6 Janurary 12, 1994 Docket Nos. 50-352 50-353 License Nos. NPF-39 i NPF-85 i
-l U. S. Nuclear Regulatory Commission .
Attn: Document Control Desk l Washington, DC 20555
Subject:
Limerick Generating Station Monthly Operating Report l For Units 1 and 2 :
Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of December 1994 forwarded pursuant to ;
Technical Specification 6.9.1.6.
i Very truly yours, [
S A
-/W -
ha es A. Muntz j Director - S1*.e Engineering
-sjk Enclosures cc: T. T. Martin, Administrator, Region I, USNRC (w/ enclosures)
N. S. Perry, USNRC Senior Resident Inspectcr LGS (w/ enclosures)
D. R. Helwig, Vice President, Limerick Generating Station i
10007J 9501230332 941231 t
/ i PDR. ADOCK 05000352 R_ _ .
, PDR 8
L -.
.=, Docket 203, 50-352 7 Attachment to Monthly Operating Report for Dece:.ber 1994 l Limerick Generating Station Unit 1 December l'through December 31, 1994 I. Narrative Summary of Operatina Exoeriences !
Unit 1 began the month of December at a nominal 100% of rated. thermal power (RTP).
On December 13, 1994, at 0822 hours0.00951 days <br />0.228 hours <br />0.00136 weeks <br />3.12771e-4 months <br />, power was reduced to 95.1% RTP to remove the 6A feedwater heater from service to' '
replace the level sight glass. Power was restored to 100%
RTP at 1008 hours0.0117 days <br />0.28 hours <br />0.00167 weeks <br />3.83544e-4 months <br />. On December 15, 1994, power was reduced to return the 6A feedwater heater to service. Power was i restored to 100% RTP at 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br />.
On December 18, 1994, at 0810 hours0.00938 days <br />0.225 hours <br />0.00134 weeks <br />3.08205e-4 months <br />, power was reduced to l 92% RTP for main turbine valve testing. Power was restored to 100% at 0956 hours0.0111 days <br />0.266 hours <br />0.00158 weeks <br />3.63758e-4 months <br />. j.
On December 20, 1994, at 0310 hours0.00359 days <br />0.0861 hours <br />5.125661e-4 weeks <br />1.17955e-4 months <br />, power was reduced to 97% RTP to remove the 6B feedwater heater from service to replace the level sight glass. Power was restored to 100%
RTP at 0442 hours0.00512 days <br />0.123 hours <br />7.308201e-4 weeks <br />1.68181e-4 months <br />. On December 23, 1994, power was reduced i to return the 6B feedwater heater to service. Power was :
restored to 100% RTP at 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br />. I Unit 1 ended this operating period at 100% of RTP.
II. Challences to Main Steam Safety Relief Valves l
I There were no challenges tc tnc Main Steam Safety Relief Valves during the month of recember.
I i
1 l
l
. _,e __ - --,
y
AVERf.CE DAILY UNIT POWIR LEVEL ,
DOCKET NO. 50 - 352 +
UNIT LIMERICK UNIT 1
- DATE JANURARY 12,1994 COMPANY PECO ENERGY COMPANY STEVEN J. KELLEY REPORT 5 ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3763 MONTH DECEMBER 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (wwE-NET) (wwE-NET) 1 1057 17 1060 2 1055 18 1060 3 1056 19 1060 4 1052 20 1056 5 1046 21 1061 6 1047 22 1057 7 1065 23 1057 8 1044 24 1056 9 1060 25 1060 10 1064 26 1064 11 1054 27 1064 12 1060 28 1060 13 1063 29 1060 14 1037 30
- 1069 15 1061 31 1064 16 1060
._ _ __ - - _ -. -. - , , ~
- - - w OPERATING DATA REPORT ,
,. DOCKET NO. 50 - 352 -
+- _ ._
DATE JANURARY 12.1994 *
, COMPLETED BY PECO ENERGY COdPANY i STEVEN J. KELLEY
! REPORTS ENGINEER
-SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) 718-3763
- OPERATING STATUS
- 1. UNIT NAME: LIMERICK UNIT 1 NOTES: THERE WAS NO LOAD DROP l
- 2. REPORTING PERIOD: DECEMBER. 1994 GREATER THAN 20% THIS *
- 3. LICENSED THERMAL DOWER (MWT): 3293 MONTH.
, = - - - --
4 NAMEPLATE RATING (GROSS MwE): 1138 ;
......... .. . +
- 5. DESIGN ELECTRICAL RATING (NET MwE): 1055
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 109
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MwE): 1055
! 8. IF CHANGES OCCUR IN CAPACITY RATING 3 (ITEMS NUMBER 3 THRouOd 7) SINCE LAST REPORT. GIVE REASONS: .
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
- NIS
- MONTH VR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 8.760 78.144
- 12. NUMSER OF HOURS REACTOR WAS CRITICAL 744.0 7.909.2 64.108.3 ;
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0. 0 ' O.O l 14 HOURS GENERATOR ON-LINE 744.b 7.840 7 h3.025.5
- 15. UNIT RESERVE SHUTDOWN HOURS O.0 O b.O
- 16. GROSS THERMAL ENERGY GENERATED (MWM) 2.447.604 24.865.779 194.316.538
- 17. GROSS ELECTRICAL ENERGY GENERATED (MwH) 813.920 8.142.240 63.184.280
- 18. NET ELECTRICAL ENERGY GENERATED (FWH) 787.009 7.858.016 60.644.006
............ .- -= ---
PAGE 1 OF 2
--,,r-.--vw----e .- ~w- , m w- w - - . - e- < gre.- r --,w. m v mi - m-%
,e-,e co i - -ww, , - e,, + w , , - . - -4 , .- ,,,e e -
,_a.
OPERATING DATA REPORT (CONTINUED) DOCKET NO. 50 - 352 ..
DATE JANURARY 12.1994
- THIS MONTH SR-TO-DATE CUMULATIVE .
- 19. UNIT SERVICE FACTOR 100.0 89.5 80.7 2D. UNIT AVAILABILITY FACTOR 100.0 89.5 80.7
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 100.3 85.0 73.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 100.3 85.0 73.6
- 23. UNIT FORCED OUTAGE RATE O.0 0.9 4.3 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
SCHEDULED OUTAGE FOR 1/95 IS POSTPONED DUE TO RECIC PUMP SEAL RESEATING.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY MID APRIL 85 4/13/85 COMMERCIAL OPERATION IST QTR 86 2/01/86 PAGE 2 OF 2
. - - - .m.
. 7 -= 6
-..s
~
< UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 352
.D'_______
UNIT NAME LIMERICK. UNIT 1 DATE JANURARY 12.1994 . ,
3~
REPORT MONTH DECEMBER. 1994 COMPLETED BY PECO ENERGY COMPANY STEVEN J. KELLEY .
REPORTS ENGINEER SITE ENGINEERING ;
LIMERICK GENERATING STATION n>
TELEPHONE (610) 718-3763
-=- ________ - - ____________________- - - -- - ____________________= --- - - _______
. l l l NETHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE 3
l livkE DURATION l REASON SHUTTING DOwM EVENT CODE CODE ACTION TO '
NO,1
___=-
DATE- l (1) (HOURS)I (2) REACTOR (3) REDORT * (4) (5) PREVENT RECURRENCE I
! 43 941213 S 000.0 B 4 N/A CH HTEXCH REACTOR POWER'WAS REDUCED TO 95.1% DUE TO FEEDwATER HEATER MAINTENANCE.
4 44 941218 5i 000.0 B 4 N/A CC VALVEX REACTOR POWER WAS REDUCED TO 92% FOR MAIN TURBINE VALVE TESTING.
l - 1 i
i 1
I (1) (2) (3) (4)
F - FORCED REASON '
METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL : FOR PHEPARATION OF DATA 8 - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NOREG-0161)
! E - OPERATOR TRAINING + LICENSE EXAMINATION j F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN) l H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE 1
t
~
1 i
-- --__e- -,-w e "-ne r- m sue + tm w = -w- .--<w-e-w m- *,e --w.-.-.-=.4*--e > . , - - ww e a -e. w . re -- -- . . . . -% ,+,.-e. w .-
. I
- L ~ ~ Docket No. 50-353 I 1
Attachment to Monthly ;
Operating Report for j December 1994 -
' Limerick Generating Station Unit 2 December 1 through December 31, 1994 -
I. Narrative Summarv of Ooeratina Experiences Unit 2 began the month of December at 75.2% of Rated Thermal Power (RTP) in end-of-cycle coastdown. Power reduction occurred .throughout this operating period due to end-of-cycle coastdown.
On December 4, 1994, at 2211 hours0.0256 days <br />0.614 hours <br />0.00366 weeks <br />8.412855e-4 months <br />, power was reduced to 64%
RTP to perform hydraulic control unit (HCU) maintenance. On ,
December 7, 1994, HCU maintenance was completed and power ,
was restored to 72.3% RTP by 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br />. ,
On December 29, 1994, at 1549 hours0.0179 days <br />0.43 hours <br />0.00256 weeks <br />5.893945e-4 months <br />, ,aower was reduced from !
64.2% RTP slightly to place the B Reactor Feedpump in ,
service and remove the C Reactor Feedpump from service.
Power was restored to 64.2% RTP at 2110 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02855e-4 months <br />. >
Unit 2 ended this operating period at 63.7% of RTP in end-of-cycle coastdown. -
l
-t II. Challences to Main Stgam Safety Relief' Valves There were no challenges to-the Main Steam Safety Relief Valves during the month of December.
l 1
i l
l I
1 r.. rr- ---
6 AVEQaGE DAILV UNIT POWER LEVEL '.
DOCNET NO. 50 - 353 UNIT LIMERICM UNIT 2 '
DATE JANURARY 12,1994 COkPANY PECO ENERGY COMPANY STEVEN J. KELLEY REPORTS ENGINEER SITE ENGINEERING LINERICM GENERATING STATION TELEPHONE (610) 718-3763 MONTH DECEMBER 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (wwE-NET) (MwE-NET) 1 752 17 677 2 747 18 677 3 741 19 674 4 725 20 666 5 620 21 665 6 624 22 658 7 651 23 655 l 8 702 24 651 9 720 25 646 10 713 26 646 11 700 27 642 12 702 28 638 13 702 29 618 14 695 30 638 l
15 685 31 626 16 685
m _ _ . . . . .
OPERATING DATA REPORT g '
DOCKET NO. 50 - 353 DATE JANURAR A 12.1994 -
COMPLETED BY PECO ENERGY COMPANY
.-- --__ -.. s STEVEN J. KELLEY REPORTS ENGINEER ,.
$1TE ENGINEERING LIMERICK GENERATING STATICN TELEPHONE (610) 718-3763 .!
OPERATING STATUS a _ -__ ___-_-_---.--_--_ . ..
-1 UNIY NAME: LIMERICK UNIT 2 NOTES: THERE WAS ONE LOAD DROP
- =-_ . - - - - - - - -
- 2. REPORTING PERIOD: DECEMBER, 1994 GREATER THAM 20% THIS
- 3. LICENSED THERMAL POWER (MwT): 3293 MONTH DUE END OF CYCLE +
4 NAMEPLATE RATING (GROSS MwE): 1138 COASTDOWN.
- 5. DESIGN ELECTRICAL RATING (NET MWE): 1055
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MwE): 1092
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MwE): 1055
-- _- ..----_. ---- -- - r
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROHGH 7) SINCE LAST REPORT. GIVE REASONS: .
~I
- 9. POWER LEVEL TO WHICH RESTRICTED.-IP ANY (NET MwE):
i
- 10. REASONS FOR RESTRICTIDMS. IF ANY:
THIS MONTH VR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 8.760 43.656
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 8.720.4 39.363.0 'l
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
__..=- __.....-----
14 HOURS GENERATOR ON-LINE 744.0 8.658.2 38.604.9 5
- 15. UNIT RESERVE SHUTDOWN-HOURS 0.0 0.0 0.0 +
i
, 16. GROSS THERMAL ENERGY GENERATED (WWH) 1.672.906 .26.924.502 122.229.583 '
- 17. GROSS ELECTRICAL ENERGY GENERATED (MwH) 527.934 8.891.054 40.383.580
- 18. NET ELECTRICAL ENERGY GENERATED (MwH) 502.562 8.571.508 38.902.200 PAGE 1 OF 2 i
4 L
h e -
' .+ , . - - - . ew-. vwe + w ++ .s ~... + . - e , e v s ~ -- --u =
i s
CDERATING DATA REPORT (CONTINUED) DOCKET NO. 50 - 353 .3 DATE JANURARY 12,*994 *
.._ ....---- =__.._. __..__
THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 98.8 88.4
- 20. UNIT AVAILABILITY FACTOR 100.0 98.8 88.4 21, UNIT CAPACITY FACTOR (USING MDC NET) 64.0 92.7 84.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 64.0 92.7 84.5
- 23. UNIT FORCED OUTAGE RATE O.0 1.2 3.5 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):
SCHEDULED REFUEL OUTAGE ON 1/28/95
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89 09/01/89 COMMERCIAL OPERATION 02/01/90 01/08/90 PAGE 2 OF 2
&V UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 353 .
6-
_e .
UNIT NAME LIMERICK UNIT 2 L,
.i DATE JANURARY 12.1994
- REPORT MONTH DECEMSER. 1994 COMPLETED BY PECO ENERGY COMPANY STEVEN J. KELLEY e REPORTS ENGINEER SITE ENGINEERING LIMERICK GENERATING STATION TELEPHONE (610) T18-3763
=_...... ___... _.._. ._ .__. .___-- _. __ _ -. _ _ . _ . . . . . . . . _ _ . - - - _ ._ _ -_..__
METHOD OF LICENSEE SYSTEM ! COMPONENT l CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO MO. DATE (1) (HOURS) (2) REACTOR (3) REPORT * (4) (5) PREVENT RECURRENCE l I i 28 941204 S. 000.0 B 4 N/A RB CRDRVE REACTOR POWER WAS REDUCED TO 64% FOR H.C.U. MAINTENANCE.
29 941229 F 000.0 H 4 N/A CH PUMPXX REACTOR WAS REDUCED SLIGHTLY WHEN FEEDWATER PUMPS WERE SWAPPED.
30 941231 S 000.0 C 4 N/A CH HTEXCH REACTOR POWER WAS REDUCED TO 63.T% FOR REFUELING OUTAGE COASTDOWN.
(1) (2) (3) (4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - CTHER (EXPLAIN) FILE (NUREG-0161) ,
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (S) -
'[
G - OPERATIONAL ERROR (EXPLAIN) $
H- OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE i
L b
h es-m=m-ww