Advises That Final Deficiency Rept DER 83-32 Re Steam Generator Process Piping Socket Welds Violating Tech Spec Requirements,Will Be Delayed Until 831207,to Permit Extensive Investigation & Evaluation
ML20081H415
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/26/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, 10CFR-50.55W, ANPP-28094-BSK, DER-83-32, NUDOCS 8311070427
Download: ML20081H415 (2)


Text

. .

o,

, t - i;fc ,.

Y ~ , .:b Arizona Public Service Company 'U P O BOX M,6

  • PHOENIX. AR12ONA 85030 AyO,[

October 26, 1983 ANPP-28094-BSK/RQT h

U. S. Nuclear Regulatory Commission g 9

/

Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director, Division of Resident, Reactor Projects and Engineering Programs

Subject:

Time Extension for Report - DER 83-32 A 50.55(e) Potentially Reportable Condition Relating To Socket Welds In Unit 1 Steam Generator Process Piping Are In Violation Of Requirements.

File: 83-019-026; D.4.33.2

Reference:

(A) Telephone Conversation between T. Young and R. Tucker on May 25,1983 (B) ANPP-24171, dated June 24,1983 (Interim Report)

(C) ANPP-27522, dated August 5,1983 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference ( A), an Interim Report was transmitted by Reference (B), and a time extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by October 26, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by December 7,1983, at which time a complete report will be submitted.

There is no new infomation or change to the Interim Report at this time.

Very truly y urs, r ctu dnat b t

E. E. Van Brunt , Jr.

8311070427 831026 APS Mce hesident ,

PDR ADOCK 05000528 Nuclear Projects Management S pop ANPP Project Director EEVBJr/RQT:ru cc: See Attached Page 2 O h,)]

e -

o Mr. T. W. Bishop DER 83-32 Page 2 cc: Richard DeYoung, Director Of fice of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. R. Bynum D. D. Green /P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations I 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 l

l