Interim Deficiency Rept DER 83-55 Re Missing Thermal Liner in Safety Injection Sys Line.Initially Reported on 830801. Due to Extensive Evaluation Required,Next Rept Will Not Be Submitted Until 840126
ML20082E360
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 11/09/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-28211-BSD, ANPP-28211-BSK, DER-83-55, NUDOCS 8311280158
Download: ML20082E360 (2)


Text

_

Arizona Public Service Company P.O. 00X 216%

  • PHOENIX ARIZONA 85036 November 9,.1983 ANPP-28211-BSK/KCP U. S. Nuclear Regulatory Connaission Region V Creekside Oaks Office Park 1450 Maria' Lane - Suite 210.

Walnut Creek, CA 94596-5368-Attention: Mr. T. W. Bishop, Director, Division of Resident, Reactor Projects and Engineering Programs .

Subject:

-Time Extension for Report - DER 83-55 A 50.55(e) Potentially Reportable Condition Relating To Massing Thermal Liner in Safety Injection System Line. i File: 83-019-026; D.4.33.2

Reference:

( A) Telephone Conversation between P. Narbut and R. Tucker on August 1,-1983 (B) ANPP-27604, dated August 22, 1983 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by

~

November 9, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by January 26, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly ours -

8311280158 831109 E. E. Van Brunt, Jr.

PDR ADOCK 05000528 APS Vice President, S PDR Nuclear Project. Management ANPP Project Director EEVBJr/KCP:ru cc: . See Page 2 g g aan 03AG338

( '

  • ff-?7

.: , *~

s

- Mr. T. W. Bishop DER 83-55

-Page 2-1cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G; Woods, Jr.

G. C. Andognini

, J. A. Roedel D. B. Fasnacht -

A. C. Rogers B. S. Kaplan

~W. E. Ide J. Vorees J. R. Bynum D. D. Green /P. P. Klute A. C. Gehr W.~J. Stubblefield W. G. Bingham R. L.'Patterson R. W. Welcher R. M. Grant D. .R. Hawkinson L. E. Vorderbrueggen G; A. Fiorelli S. R. Frost J. Self

, , D. Canady i

Records Center Institute of Nuclear Power Operations f

l_

1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia. 30339

~

l

~

1 i