Forwards Application for Amend to License NPF-3 to Reflect Changes to TS 3/4.9.4 & Bases Re Refueling operations- Containment Penetrations
ML20084T999
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/07/1995
From: Stetz J
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20084U002 List:
References
2288, NUDOCS 9506130059
Download: ML20084T999 (2)


Text

{{#Wiki_filter:7

 .-{.

I CastFEg 30014admon Avenue John P. Sestr kesdo, OH 43652-0001 ' Vice President - Nuclear 419-24& 2300 Davis-Besse Docket Number 50-346 License Number NPF-3 Serial Number 2288 June 7. 1995 United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555 Subj ec t : License Amendment Application to Revise Technical Specifica-tions and Associated Bases for Refueling Operations - Containment Penetrations Ladies and Gentlemen Enclosed is an application for an amendment to the Davis-Besse Nuclear Power Station (DBNPS), Unit Number 1 Operating License NPF-3, Appendix A, Technical Specifications, to reflect the changes attached. The proposed changes involve Technical Specification (TS) 3/4.9.4, Refuel-ing Operations - Containment Penetrations, and associated Bases 3/4.9.4, Containment Penetrations. The proposed change vould revise TS Limiting Condition for Operation (LCO) 3.9.4.b to allow both doors of the containment personnel airlock to be open during core alterations or movement of irradiated fuel with-in the containment, provided that certain specified conditions are met. The proposed change vould also clarify TS LCO 3.9.4.c, and would make administrative changes to Action statement 3.9.4.a and Surveillance Requirement (SR) 4.9.4. Associated changes to the Bases are also proposed.

          '&fh P

i Operating Componies-Deveiond Dectne tiluminatinD - 3 Toledo Edson a l' [

 '     ~

Dockst Nu;ber 50-346

   .,'   ticen:o Nu;ber NPF-3 Serial Number 2288 Page 2

! In order to support planning for the Tenth Refueling Outage (10RF0), which is currently scheduled to commence on April 8, 1996, Toledo Edison requests that this amendment be issued by the NRC by December 5, 1995. Should you have any questions or require additional information, please contact Mr. Villiam T. O'Connor, Manager - Regulatory Affairs, at (419) 249-2366. Very truly yours, HKL/laj A~ ' cc: L. L. Cundrum, DB-1 NRC/NRR Project Manager J. B. Martin, Regional Administrator, NRC Region III S. Stasek, DB-1 NRC Senior Resident Inspector J. R. Williams, Chief of Staff, Ohio Emergency Management Agency, State of Ohio (NRC Liaison) , Utility Radiological Safety Board t f l

                                                                                      )