Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEAR05000278/LER-1993-0061993-09-0303 September 1993 LER 93-006-00:on 930814,LPCI Sys Became Inoperable When Triple Low Water Level Signal Simulated on Unit 2.RWL Instrumentation LT-72B Valved Out of Svc & Equalized Allowing Indicated Water Level to increase.W/930903 Ltr 05000278/LER-1993-0051993-09-0303 September 1993 LER 93-005-00:on 930809,HPCI Sys Declared Inoperable Due to Defective Flow Controller.Flow Controller Removed,All Potentiometers & Boards Cleaned,Flow Controller Reinstalled & Necessary Testing & Tuning performed.W/930903 Ltr 05000278/LER-1993-0041993-08-30030 August 1993 LER 93-004-00:on 930730,simulated Low Steam Flow Signal to Recombiner Initiated Isolation Signal to Off Gas Recombiner, Causing Main Condenser Vacuum to Begin Decreasing.Special Procedure SP-1438 revised.W/930830 Ltr 05000277/LER-1990-0141990-07-19019 July 1990 LER 90-014-00:on 900620,RWCU Isolation Occurred During Pressurization of Sys Following Isolation Valve Maint.Caused by Design Weakness.Design of Instrumentation Reviewed & Procedural Controls enhanced.W/900719 Ltr 05000278/LER-1990-0071990-07-18018 July 1990 LER 90-007-00:on 900620,RWCU Isolated While Pressurizing Sys Following Isolation Valve Insp.Caused by Design Weakness. Design of Instrumentation Reviewed & Procedural Controls enhanced.W/900719 Ltr 05000277/LER-1990-0131990-06-27027 June 1990 LER 90-013-00:on 900530,failure to Perform Tech Spec Surveillance Tests Since 891130 Discovered.Caused by Incorrect Std Practice.Tests Revised to Clarify Testing Requirements of Tech Spec 4.14.C.1.c.W/900627 Ltr 05000277/LER-1989-006, Corrected LER 89-006-00:on 890209 & 25,determined That Tubing to Containment Isolation Valve Installed W/Inadequate Support & Containment Atmosphere Control & Dilution Sys Not Per Applicable Installation Criteria.Controls Estab1989-05-0909 May 1989 Corrected LER 89-006-00:on 890209 & 25,determined That Tubing to Containment Isolation Valve Installed W/Inadequate Support & Containment Atmosphere Control & Dilution Sys Not Per Applicable Installation Criteria.Controls Established 05000277/LER-1989-007, Corrected LER 89-007-00:on 890411,green Discoloration Discovered in Grease on Stabs of Control Fuses in Switchgear.Root Cause of Event Under Investigation.Stabs Lubricated W/Different Type of Approved Grease1989-05-0909 May 1989 Corrected LER 89-007-00:on 890411,green Discoloration Discovered in Grease on Stabs of Control Fuses in Switchgear.Root Cause of Event Under Investigation.Stabs Lubricated W/Different Type of Approved Grease 05000277/LER-1987-016, Corrected LER 87-016-00:on 870820,isolations Occurred When Four of Eight 4 Kv Emergency Transformers Momentarily de-energized.Caused by Inadequate Concern for Potential Electrical Hazard by Maint Craft Supervision1987-09-28028 September 1987 Corrected LER 87-016-00:on 870820,isolations Occurred When Four of Eight 4 Kv Emergency Transformers Momentarily de-energized.Caused by Inadequate Concern for Potential Electrical Hazard by Maint Craft Supervision 05000277/LER-1984-008, Revised LER 84-008-01:on 840427,standby Gas Treatment Sys Solenoid Valve SV-00009 Failed to Operate Properly, Preventing Fan a Inlet & Outlet Dampers from Opening.Cause of Solenoid Failure Under Investigation1984-07-24024 July 1984 Revised LER 84-008-01:on 840427,standby Gas Treatment Sys Solenoid Valve SV-00009 Failed to Operate Properly, Preventing Fan a Inlet & Outlet Dampers from Opening.Cause of Solenoid Failure Under Investigation 05000278/LER-1984-001, Revised LER 84-001-02:on 840106,turbine Exhaust Rupture Diaphragm Alarm Annunicated Following Startup of HPCI Turbine.Caused by Rupture of Inner Rupture Disc.Inner Rupture Disc Replaced1984-06-0101 June 1984 Revised LER 84-001-02:on 840106,turbine Exhaust Rupture Diaphragm Alarm Annunicated Following Startup of HPCI Turbine.Caused by Rupture of Inner Rupture Disc.Inner Rupture Disc Replaced 05000277/LER-1984-003, Revised LER 84-003-01:on 840131,heatup Rate Exceeded Tech Spec Limits.Caused by Personnel Error.Operator Disciplined. Memo Issued to All Licensed Operators Re Tech Spec Rate1984-05-0303 May 1984 Revised LER 84-003-01:on 840131,heatup Rate Exceeded Tech Spec Limits.Caused by Personnel Error.Operator Disciplined. Memo Issued to All Licensed Operators Re Tech Spec Rate 05000278/LER-1983-018, Updated LER 83-018/03X-1:on 831117,control Rods 34-35 & 34-7 34-27 Exceeded Allowable Scram Insertion Time of 7 S.Caused by Failure of Scram Solenoid Valve in Both Hydraulic Control Units.Solenoids Replaced1984-02-10010 February 1984 Updated LER 83-018/03X-1:on 831117,control Rods 34-35 & 34-7 34-27 Exceeded Allowable Scram Insertion Time of 7 S.Caused by Failure of Scram Solenoid Valve in Both Hydraulic Control Units.Solenoids replaced.W/840210 Ltr 05000278/LER-1983-008, Followup LER 83-008/01X-1:on 830214,during Refueling Outage, Surveillance Testing Indicated Combined Leakage for Listed Valves Exceeded Limits or Failed to Meet Requirements.Caused by Seat Surface Degradation1983-09-13013 September 1983 Followup LER 83-008/01X-1:on 830214,during Refueling Outage, Surveillance Testing Indicated Combined Leakage for Listed Valves Exceeded Limits or Failed to Meet Requirements.Caused by Seat Surface Degradation 05000278/LER-1982-022, Revised LER 82-022/01X-1:on 821025-1102,RHR HX 3D Leaked Slightly Radioactive Water Into Intake Structure.Caused by Expansion Bellows Leak Between Inner Floating Head & Drain. HX Repaired1983-01-11011 January 1983 Revised LER 82-022/01X-1:on 821025-1102,RHR HX 3D Leaked Slightly Radioactive Water Into Intake Structure.Caused by Expansion Bellows Leak Between Inner Floating Head & Drain. HX Repaired 05000277/LER-1982-030, Telecopy Message of LER 82-030/01P:on 820917,contaminated Water Released from Recombiner Bldg Into Storm Drain Sys. Caused by Spurious Actuation of Fire Protection Sprinkler Sys in B Filter Train of Exhaust Ventilation Sys1982-09-21021 September 1982 Telecopy Message of LER 82-030/01P:on 820917,contaminated Water Released from Recombiner Bldg Into Storm Drain Sys. Caused by Spurious Actuation of Fire Protection Sprinkler Sys in B Filter Train of Exhaust Ventilation Sys 05000278/LER-1982-0111982-07-13013 July 1982 LER 82-011/03L-0:on 820620,fuse on Positive Leg to Transmitter Circuit Board Blew Causing Downscale Failure of Drywell 0-70 Psig Pressure Recorder.Caused by Intentional Ground Installed on Positive of Transmitter.Fuse Replaced 05000278/LER-1982-0101982-07-13013 July 1982 LER 82-010/03L-0:on 820618,downscale Failure of Drywell 0-70 Psig Pressure Recorder Occurred.Caused by Blown 0.3 Ampere Fuse Installed on Positive Side of Power Supply to Transmitter Circuit Board.Fuse Replaced 05000277/LER-1982-0161982-07-13013 July 1982 LER 82-016/01P:on 820709,equalizing Valve on Main Steam Line a High Flow Transmitter (Dpis 116B) Found Open.Cause Under Investigation.Valving of Instrument Performance Verified 05000277/LER-1982-0131982-07-0808 July 1982 LER 82-013/03L-0:on 820608,while Filling Diesel Generator Carbon Dioxide Fire Suppression Sys Storage Tank,Tank Pressure Dropped Below Tech Spec Limit.Caused by Venting Tank Vapor Space to Atmosphere Instead of Delivery Truck 05000277/LER-1982-0151982-07-0606 July 1982 LER 82-015/1P:on 820703,main Steam Line Flow Transmitter D & 1 of 4 Main Steam Line High Flow Transmitters Found W/Open Equalizing Valves.Cause Under Investigation.Valving of Instruments Verified 05000278/LER-1982-0091982-06-28028 June 1982 LER 82-009/03L-0:on 820530,operator Lost Valve Indication Position on HPCI Sys.Caused by Blown Fuse in Instrument Panel Due to Shortened Solenoid Coil in Turbine Exhaust Drain Valve.Fuse Replaced & Valves Stroked 05000278/LER-1982-0071982-06-21021 June 1982 LER 82-007/03L-0:on 820519,during Operability Testing,Hpci Steam Inlet valve,MO-14,blew Fuses When Stroked & Turbine Stop valve,HO-5513,failed to Close in Response to Remote Trip Signal.Steam Inlet Valve Repacked & Switch Replaced 05000278/LER-1982-0051982-06-14014 June 1982 LER 82-005/03L-0:on 820514,during Normal Operation,Reactor Operator Heard Relay in Primary Containment Isolation Sys Energize.Caused by Defective Component in Rosemount Model 510DU Slave Trip Unit.Instrument Replaced 05000277/LER-1982-0121982-06-11011 June 1982 LER 82-012/03L-0:on 820517,pressure Drop Across Combined HEPA Filters & Charcoal Absorber Banks in Control Room Emergency Ventilation Sys Exceeded Tech Spec Limits.Caused by Pin on Connecting Linkage of Damper OBV-30 Falling Out 05000277/LER-1982-010, Sanitized Version of LER 82-010/01X-0:on 820413,Eberline Instrument Corp Reported 9.175 Rem Exposure to TLD Badge. Caused by Deliberate Tampering W/Badge Found Near Radiation Source.Individual Denied Access to Site1982-05-13013 May 1982 Sanitized Version of LER 82-010/01X-0:on 820413,Eberline Instrument Corp Reported 9.175 Rem Exposure to TLD Badge. Caused by Deliberate Tampering W/Badge Found Near Radiation Source.Individual Denied Access to Site 05000277/LER-1982-008, Revised LER 82-008/01X-1:on 820328,auxiliary Boiler Operated on Diesel Fuel 2 Instead of Fuel Oil 6,decreasing Diesel Fuel Inventory Below Tech Spec Limit of 104,000 Gallons. Caused by Failure to Monitor Fuel Tank Inventory1982-04-15015 April 1982 Revised LER 82-008/01X-1:on 820328,auxiliary Boiler Operated on Diesel Fuel 2 Instead of Fuel Oil 6,decreasing Diesel Fuel Inventory Below Tech Spec Limit of 104,000 Gallons. Caused by Failure to Monitor Fuel Tank Inventory 05000277/LER-1982-0061982-04-12012 April 1982 LER 82-006/03L-0:on 820313,during Surveillance Testing of Fire Protection Sys,Diesel Fire Pump Tripped Off on Overspeed Condition.Caused by Defective Overspeed Control Switch.Defective Switch Replaced ML20064J1791978-12-20020 December 1978 /03L-0 on 781127:D Reactor Bldg Area Exhaust Radiat Monitor Indicated Downscale & Was Determined to Be Inoperable.Caused by Defective Zener Diode in Amplifier of GE sensor-converter Unit,Model 194X927011 ML20062E8681978-12-0606 December 1978 /03L-0 on 781117:output Demand Signal from RCIC Flow Controller (Inst HCS213-115) Read Down Scale.Caused by Open Circuit in Controller Demand Current Loop ML20062E8741978-12-0404 December 1978 /03L-0 on 781102:during Third Refueling Outage, Failed to Remove Neutron Flux Samples from Reactor Vessel. Caused by Administrative Oversight.Eval of Sample Removal Prog Is in Progress ML20064F1111978-11-20020 November 1978 /01T-0 on 781106:while at Pwr Feedwater Control Sys Failure Resulted in Reactor Low Level Transient & Scram HPCI Initiated But Delivered Unstable Flow & Soon Tripped on Overspeed.Cause Was HPCI Governor Being Out of Calibr ML20062D6351978-11-20020 November 1978 /03L-0 on 781021:during Startup,Excessive Oper of HPCI Gland Seal Condensate Pump Was Noted.Check Valve 2-23-131 Was Leaking Which Let Condensate Return to Gland Seal Condenser.Valves Were Blocked to Facilitate Repair ML20062C9961978-11-0808 November 1978 /03L-0 on 781019:during start-up,inboard Main Steam Line Drain Isolation Valve MO-2-74 Would Not Close in Response to Hand Switch in Control Room,Due to Defective Limitorque SMB-000 Torque Switch on the Valve ML20062C5471978-11-0101 November 1978 /01T-0 on 781019:unit 3 Containment Oxygen Concentration Had Increased to 0.1% Above 4 Percent Limit of Tech Spec 3.7.A.5.Caused by Open Air back-up Valves in Inoperable Instru Nitrogen Compressor ML20062C5381978-10-24024 October 1978 /01T-0 on 781010:2 4KV Emergency Bus Sequential Loading Relays Found Outside Tech Spec Limits.Caused by Error in Determining Setpoint & Calibr Span of Relays.Relays Recalib & Testing Procedures Revised ML20062A3801978-10-0404 October 1978 /03L-0 on 780904:backflow of Radioactive Liquid from Radwaste Demineralizers to Svc Air Sys Discovered on 780904 & 780921.Caused by Leaking Process Valves & Associated Check Vlaves Due to Dirt Deposits ML20147B2321978-09-29029 September 1978 /03l-0 on 780830:E-3 Diesel Start Time to Reach Rated Voltage & Frequency Did Not Meet Surveillance Test Requirement,Probably Caused by Leaking Check Valve in the Hydraulic Sys Assoc W/The Air Booster Relay ML20064B7541978-09-26026 September 1978 /03L-0 on 780901:failure of Auxiliary Oil Pump to Start Due to a Ground in Motor.Motor,Baldor Type 1040D, 7 1/2 H.P.,25OV.D.C. Was Replaced & HPCI Sys Tested Satisfactorily W/In 36 Hours.Ads Timers Not W/In Tech Specs ML20064B7521978-09-26026 September 1978 /03L-0 on 780904:during Surveillance Test Unit 3 Dmain Steam Radiat Monitor Failed to Cause a Half Scram Due to Defective Transistor.Transitor Was Replaced & Monitor Returned to Svc in 6 Hours ML20064B7501978-09-26026 September 1978 /03L-0 on 780901:while Testing ADS Subsys,Timers on Both Loops Were Found Outside the 115-125 Second Limit of Tech Specs Due to Setpoint Drift of Time Delay Relays. Timers Were Calibrated,Retested & Returned to Svc 05000000/LER-1977-005, Updated LER 77-005/1T:on 770114,failure of High Pressure Svc Water/Emergency Svc Water & Emergency Cooling Water Pumps to Meet FSAR Seismic Requirements Noted.Caused by Change in Calculation Techniques1977-01-28028 January 1977 Updated LER 77-005/1T:on 770114,failure of High Pressure Svc Water/Emergency Svc Water & Emergency Cooling Water Pumps to Meet FSAR Seismic Requirements Noted.Caused by Change in Calculation Techniques ML20086F3031976-10-0101 October 1976 LER 76/065/03L:on 760921,isolation Valve AO-5235 Failed to Respond to Manual Close Signal.Caused by Stuck Plunger. Plunger Freed & Valve Operated Properly 05000277/LER-1976-015, Telecopy LER 76-015/01P:allowable Gross Activity Gaseous Release Rate Exceeded Tech Spec.Caused by Xenon Gases Released During Filter Demineralizer Backwash.No Immediate Corrective Action Possible1976-03-0505 March 1976 Telecopy LER 76-015/01P:allowable Gross Activity Gaseous Release Rate Exceeded Tech Spec.Caused by Xenon Gases Released During Filter Demineralizer Backwash.No Immediate Corrective Action Possible 05000277/LER-1976-012, Telecopy LER 76-012/01P:on 760225,allowable Gross Activity Gaseous Release Rate Exceeded Tech Spec.Caused by Xenon Gases Released During Filter Demineralizer Backwash.No Immediate Corrective Action Possible1976-02-25025 February 1976 Telecopy LER 76-012/01P:on 760225,allowable Gross Activity Gaseous Release Rate Exceeded Tech Spec.Caused by Xenon Gases Released During Filter Demineralizer Backwash.No Immediate Corrective Action Possible 05000277/LER-1976-011, Telecopy LER 76-011/01P:on 760219,allowable Gross Activity Gaseous Release Rate Exceeded Tech Spec.Caused by Xenon Gases Released During Filter Demineralizer Backwash.No Immediate Corrective Action Possible1976-02-19019 February 1976 Telecopy LER 76-011/01P:on 760219,allowable Gross Activity Gaseous Release Rate Exceeded Tech Spec.Caused by Xenon Gases Released During Filter Demineralizer Backwash.No Immediate Corrective Action Possible 1993-09-03
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 ML20217G3541999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML20212D1281999-09-17017 September 1999 Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 ML20212A5871999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With ML20211D5501999-08-23023 August 1999 Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively ML20212H6311999-08-19019 August 1999 Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13 ML20210N7641999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with ML20209H1121999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with ML20195H8841999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with ML20206N1661999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with ML20206A2921999-04-20020 April 1999 Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20205K7411999-04-0707 April 1999 Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively ML20205P5851999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With ML20207G9971999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With ML20199E3471998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With ML20205K0381998-12-31031 December 1998 PECO Energy 1998 Annual Rept. with ML20206P1651998-12-31031 December 1998 Fire Protection for Operating Nuclear Power Plants, Section Iii.F, Automatic Fire Detection ML20206D3651998-12-31031 December 1998 1998 PBAPS Annual 10CFR50.59 & Commitment Rev Rept. with ML20206D3591998-12-31031 December 1998 1998 PBAPS Annual 10CFR72.48 Rept. with ML20196G7021998-12-0202 December 1998 SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles ML20196E8261998-11-30030 November 1998 Response to NRC RAI Re Reactor Pressure Vessel Structural Integrity at Peach Bottom Units 2 & 3 ML20198B8591998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with ML20206R2571998-11-17017 November 1998 PBAPS Graded Exercise Scenario Manual (Sections 1.0 - 5.0) Emergency Preparedness 981117 Scenario P84 ML20198C6751998-11-0505 November 1998 Rev 3 to COLR for PBAPS Unit 3,Reload 11,Cycle 12 ML20195E5341998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with ML20155C6071998-10-26026 October 1998 Safety Evaluation Supporting Amend 226 to License DPR-44 ML20155C1681998-10-22022 October 1998 Safety Evaluation Accepting Proposed Alternative Plan for Exam of Reactor Pressure Vessel Shell Longitudinal Welds ML20155H7721998-10-12012 October 1998 Rev 1 to COLR for Peach Bottom Atomic Power Station Unit 2, Reload 12,Cycle 13 ML20154J2401998-10-0505 October 1998 Safety Evaluation Supporting Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively ML20154H4771998-10-0505 October 1998 Safety Evaluation Supporting Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively ML20154G6821998-10-0101 October 1998 SER Related to Request for Relief 01A-VRR-1 Re Inservice Testing of Automatic Depressurization Sys Safety Relief Valves at Peach Bottom Atomic Power Station,Units 2 & 3 ML20154G6631998-10-0101 October 1998 Safety Evaluation Supporting Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively ML20154H5541998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Pbaps,Units 2 & 3. with ML20153B9651998-09-14014 September 1998 Safety Evaluation Supporting Amend 9 to License DPR-12 ML20151Y2901998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbaps,Units 2 & 3. with ML20238F2661998-08-24024 August 1998 Safety Evaluation Supporting Amend 222 to License DPR-44 ML20237B9531998-08-10010 August 1998 Specification for ISI Program Third Interval,Not Including Class Mc,Primary Containment for Bpaps Units 2 & 3 ML20237A7761998-08-10010 August 1998 SER Accepting Licensee Response to NRC Bulleting 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode ML20237A5351998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pbaps,Units 2 & 3 ML20236R8281998-07-15015 July 1998 Safety Evaluation Approving Proposed Alternative (one-time Temporary non-Code Repair) Pursuant to 10CFR50.55a(a)(3) (II) ML20236M3471998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbaps,Units 2 & 3 ML20249C4791998-06-0202 June 1998 Rev 6 to COLR for PBAPS Unit 2 Reload 11,Cycle 12 ML20248F4781998-06-0101 June 1998 Corrected Page 1 to SE Supporting Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively.Original Page 1 of SE Had Three Typos ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML20248M3001998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pbaps,Units 2 & 3 ML20247N5351998-05-11011 May 1998 SER Accepting Third 10-year Interval Inservice Program for Pump & Valves for Plant,Units 2 & 3 ML20249C4751998-05-0707 May 1998 Rev 5 to COLR for PBAPS Unit 2 Reload 11,Cycle 12 ML20247G0721998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Pbaps,Units 2 & 3 1999-09-30
[Table view] |
LER-2076-011, Telecopy LER 76-011/01P:on 760219,allowable Gross Activity Gaseous Release Rate Exceeded Tech Spec.Caused by Xenon Gases Released During Filter Demineralizer Backwash.No Immediate Corrective Action Possible |
Event date: |
|
---|
Report date: |
|
---|
2772076011R00 - NRC Website |
|
text
- -
G Qjevw
, m =.:
s . : . .: ;*.
es . . . . . - . 6.
.g.= . . .p =: . e. ;
a .e .
.1
) ...g . s...
r :..s .
I
.... . n....o. .. .sa.. a. ..%.e. . .. .. l t
......gs . . . . t. .v .. .e . s.... g g l
r
. 2.- 1 1
1
. e T r '. i r *r*
4
. .y, . ? '- l
v"-
V. . . r% e.3 .~ ' . -." ' .ts e. .* .*ys
. . . . -8.. o.....- . .
- ..*..s*.. s ... . ..r3 e.- . g .
.s..
.. . . . g.. . . .c. . #.,., . . . . .a....
Q.. , .:
. .,...,i
. ... .::. .. .... . . , , .e..,..
..... . =. . ...'l.... . -
... ...- .--.ae ,..t / -
e* .* . = s .,. f. ,y (g,
4 4 . .%' .. . a. ,.. p ,
.L. 4. ;. # :. ,,: *- *
. . .. .. ..3g r .,. .. . 3.
. , . . . g . ,. . i. g . m. .. .
.,.,..,s-.. . . - . .
.._. ..; .. e . t_ ._ g- _ . J .; .,. . - .. . ;.4.._ , t. ..; .....p. ; - ..
. . . e.4
. . - .t . .
.D. .
. .;* 4.4.a. . . . ... . *.
. . . s y ..s. p. ., ,a.
. .. ..e... . .ga.. . gS..
.g . . g . y. . .. ,,,.2
.t . 7.4. ,. 4 ..,.3
. 9e .; .
. . .. .=. g
.; g .,,.y . . . . . . g,...r.. ..
..e ,. C r e r. C e :
., 3 e r. e *.
.s um t e r . : 5, =c v ~
.r .. . . * ... c: \
t
. g > .. .. [ n. g i. -2p. y . 4. .e .t .,. . .g . .s... .t a. .ra. f a., . . .
... . ~. '. ~ -
l
- 2. e p. ,.,. ..
. .v. .
c .C. .._- ,.
%.. ..,.e :;
i e... .. .. ..,,E... .. .e, ..%ff. .. ;, ,
I
...ntc. . .
.&.. .. u c 3..,.,.,...
A%. a. e : e .:. . e x ....., e. .. .s .. .y
.,~
- u. .n. .a .. P. .t
. . -~- 3. g..a. . s.o. ..% .. ..r.,.. .. .2,. .* * , *.*-
rs . . .. .. E .% .' ,. . .i n. ., ,
s g g g n.w. 3 e. '. e. c,. .n o . q . a.. .r
. 7 g a .v. .a . .
. ., a. . o. ....:.. .- .
. . n,. . l
. D r 3.. .:+ 3.- .u .":' : v.. r , .)
, .s. .. .. .J v. - 4.
u..
r'.
J... 1 5. s5.,c#
p e g. . ... . . C , S .:. .v .. i ++. .
S.. .? .i. . , ae . O. ..E..
. ,e
- p. . p. 3 5 ,- . 1 **
. . . ikae. ..
. n. O.4f < #. . a. m. .u. .q a. w 4 .* .t e.,g e. .t a.c.t . E . t .m. *
- e . ,s . .e ... 4 g .= a. .
.o . g e ., .s. y . .un. .. <g
. ... .. . . n c. a ...
- e. .. ..,e.,
. ,-- .. .... ..-:-. .. j - . . v. .,
c.: a ... e. . . c. .a .. . g .a .n g. . . . . < . . , ,
,i s p. .e ..e a. d. ayvar*. . ' . v.s s a. .- . ' S t a. d. . s u .'..'.e. .' .v + .*. % *. * *
! have exceeded Tecnn'es; Specificati r.'i-its.
l Apparer.t Cause of Occurrence:
At n:rn on 2 .' * #,/ ~ 6 t h e 2A W*.'U
. .. . ..e 3 e fi her der'nerfsl.jter v '. s 6 . r... o.
. r .. . t .. . . .. x .. we s....>.
.o e. ., .e. } . g .e. .a g .'
v a t .h. . 4 a v. . r,e *.is.a .
. S *. e. *. .
y.- ~ u '. . ~c ~,s , .. y, - p s g. g 4 $ 3 ..
% y., .. .u. '. . .;. # .#
E D.. ..L.w - . --
O S a. . L .. . aE .. 9e .c ..
y .. . n a.n . .
- t. C . .... .*.4 --
. f e. e. - .x. . . . .
sa.4 . a y p % .e ..T. W' ' E . . *.*
. e .8 .,'..a. '
'. .# *. ' .3* .#
3 p y- .4 o. y3 . .e .e { e. .,1 .* a. a.... ,. *. \. 7. ,. c - . . ..' .# .*. e i '" ==- *. ." S. o. .' . . . *
.".5
.,. *..
- b... . *a . .m.. a. t..-.*.*- .f.e .*.. .%3 e ..
. .t . g .* j.. wgy y g ..a w ..p. . .a , .... ,n
. . . . . . .T.. . ._g .
.. .g. .g .g a. . .a. . .ag4 5
.' r. tw.ba Y e 5 5 *. 1 V e ". *. ~. * *6 *.* e #.* .e i. . . ,
~ . ^ .. .*** . h. % *.* .k V E a .b.
" m. a e *. *.* #. *. . .* . % *. 4. .
.. b. .e. r . ,*r, vg3D . ..... a j y 4 .8 . g. ., g e. g *
. .2 ..q
. ..*e4 ..
... . .. h. . .. .....*.,.r.
3 .7 + ..* . e. .b. , f...
s . k. .. % v.
. 7. ti,. s . e... .e. i , r . V .4. . . 4.. k .* *. ,A.*.=
- . .'. e s s a. .d. '. r a - *a..Sa ,C a .. *. .
.e
. . . _ $ $ e e.
S 3 i
Analyais cf Cecurrence: ,
2
.. ~he s nr .t .
. . ,.s ..
., o
.e e .e. -. .n s .4 4 F. e. K e. a. w i
.T . . . . tt s.a. . . .s. t, ., . . . **
. ..s. e peak
... .(i n u~
. . - s s.t a,:nn.,. 9.r.c o u - release rste vse : a l c u '. a t e 1 t: te i se ..
. . . . e .. .n e . . s ,. e
..a t e o times the 'e:hniesi speai tt esti: n limit.
. . -- t.>..... -
E n.1 '.* r. i t 3 rocf vent relasse '~ h e = sin 3 : v >.
' r M e s r e = s i n'e d .n t? h s . g e 1
{
suring the perici *hst the 2 r M r *(e n *, reletie
8401090581 760219 . m.7 PDR ADOCK 05000277 .
S PDR
~
O o mr-.ma. ..__ _ __ _ . - -- __:_ _
pf 0 lII _.(C A YO f
- b
,. 2 -
' - i Repartsble Occurrence
~
Pro =n.t.
Notific.ation.
'2-76-11/IP
- . 1. c
~ In less than 10.=inutes the enleviated Unit 2 rdor v e r.: relcane rate vac leks.than 7echnicci Specifiention~-
limitc. 1he total length ~ of ti=0 that t ~g re Unit 2 ronr vent relesse este was higher than nar=e1 less than 63 =1ns.
Initial enslysis of the particulate 'f i l t e r s and Icdine ~
cartirfages indicated no signifiennt increase in particulate or iodine release rates. An iscropic analysis'was ran on a gas sanple obtained during the relcace (about thc 391dp int of the release,. It indicated only Xe 135 and Xe ' ' ' , in s 1.62 to 2 ratic.- It was estimated ,that the activity released
'd u e ta this spite vss about 20 cures .(basec on Gross Sadisti.
Roof Vent Monitor Reacings).
The release calestions for roof vent releases contain an MPO of 3.3.33 201/cetE 10 =in old off cas =ixture per T e c h t. i c s 1 Spe ci fi c ation. However, i r, this case the =ost liciting ?.? for the =ajor activity vcuid be 3N7 30irce.
If tne ::st li=iting MPC of activity measured is aces in the
! releace esiculation , e '
the Tecnni:El Specifiestien release li=it is -
.pbxceede:.
i based an tr.e above, the short ter= lenrtn ;f the release sno the fact that the =sjor messures activity. vere neble I
P. anes. %he effects frco t t. i s resence shouli be very cinical.
Corrective Action:
7 t.e release was shsr; term in nature; no i==ediate orrectise s.c t i o n was possible.
l Failure Data:
Very t ruly ycurs .
W. O. U1. rich, Saperintendent Fenen Ectta= Ato=ie Power 4:ation 1
l 1
l i
! e i
e i
n e *l
-v.*
s '.