05000277/LER-1998-001, Forwards LER 98-001-00,re Failure to Perform SR for RCS Temp Limits When Starting First Recirculation Pump

From kanterella
(Redirected from 05000277/LER-1998-001)
Jump to navigation Jump to search
Forwards LER 98-001-00,re Failure to Perform SR for RCS Temp Limits When Starting First Recirculation Pump
ML20217E853
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 04/22/1998
From: Warner M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217E857 List:
References
NUDOCS 9804270445
Download: ML20217E853 (1)


LER-2098-001, Forwards LER 98-001-00,re Failure to Perform SR for RCS Temp Limits When Starting First Recirculation Pump
Event date:
Report date:
2772098001R00 - NRC Website

text

M rk E.Wzrn:r Plant Manager

_A

_ Peach Bottom Atomic Powsr Station

~

.PECO NUCLEAR esco emerov comneev 1848 Lay Road A Unit of PECO Energy 7314-9032 gita P April 22,1998 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Docket No. 50-277 and 278

SUBJECT:

Licensee Event Report, Peach Bottom Atomic Power Station Unit 2 and Unit 3.

This LER reports the failure to perform the surveillance requirements for reactor coolant system temperature limits when starting the first recirculation pump and is being submitted pursuant to the requirements of 10 CFR 50.73(a)(2)(i)(B).

Reference:

Docket No. 50-277 and 50-278 Report Number: 2-98-001 Revision Number: 00 Event Date: 01/18/96 Discovery Date: 03/23/98 Report Date: 04/22/98 Facility: Peach Bottom Atomic Power Station 1848 Lay Road, Delta, PA 17314 l

Sincerely, j

)?ua d Ma n DBB:dbb i

l enclosure cc: N. J. Sproul, Public Service Electric & Gas R. R. Janati, Commonwealth of Pennsylvania INPO Records Center H. J. Miller, US NRC, Administrator, Region l R. l. McLean, State of Maryland A. C. McMurtray, US NRC, Senior Resident inspector A. F. Kirby lil, DelMarVa Power xi CCN 98-14028 1 w9 e 9804270445 980422 4b^

PDR ADOCK 05000277 -

S PDR