05000277/LER-1990-013

From kanterella
Jump to navigation Jump to search
LER 90-013-00:on 900530,failure to Perform Tech Spec Surveillance Tests Since 891130 Discovered.Caused by Incorrect Std Practice.Tests Revised to Clarify Testing Requirements of Tech Spec 4.14.C.1.c.W/900627 Ltr
ML20055C983
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/27/1990
From: Fulvio A, Miller D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CCN-90-14130, LER-90-013, LER-90-13, NUDOCS 9007030037
Download: ML20055C983 (4)


LER-2090-013,
Event date:
Report date:
2772090013R00 - NRC Website

text

>

CCN-90-14130 PitiLADEI.PHIA ELECTRIC COME%NY EhD PEACH IKTITOM AlUMIC POWl:R STATION R. D.1, Ikix 208

% Q gdf Delta, itnmylvanta 17314 poum mornm-tm nmta os ustusca (717) 4 % -7014 D. B. Miller, Jr.

Vica President June 27, 1990 Docket No. 50-277 Document Control Desk U. S. Nuclear Regulatory Commission I Washington, DC 20555 I

SUBJECT:

Licensee Event Report 'D Peach Bottom Atomic Power Station - Unit 2 This LER concerns a failure to perform a Tech Spec Surveillance due to a procedural deficiency. ,

Reference:

Docket No. 50-277 Report Number: 2-90-013 Revision Humber: 00 Event Date: 11/30/89 Discovery Date: 05/30/90 Report Date: 06/27/90 Facility:- Peach Bottom Atomic Power Station RD 1. Box 208, Delta, PA 17314 This LER is being submitted pursuant to the requirements of .17 CFR 50.73(a)(2)(1)(B).

Sincerely, o

A. ,

cc: J. J. Lyash, USNRC Senior Resident inspector T. T. Martin, USNRC, Region I 9007030037 900627 PDR ADOCK 05000277 s PDC

)vf

/g

/

.{

NnC Pese 334 U.S NUCLi AA itiULaTDA COMMi$8 TON

", t.PPROYtD OMD NO 3160 5104 LICENSEE EVENT REPORT (LER) ' ' a ' $ ' 8'

  • DOC 4 t f NUM5t h (21 ' A OI ' 3' F ACitlT V hAut til Peach Bottom Atomic Power Station - Unit 2 015 l 01010121717 1 loFl o l3 TITLt les railure To Perform A Technical Specification Surveillance Due To A Procedural Deficiency t yt N T Da f t 161 t t M NUM8t h 16) htPORT DATI 17s Of ME R F ACILif ft $ INVOLVED (45 pmt Y NvMetmig!

MONTH DAY vt Asi v t Asi 64g' '(6 4 *p,j y999, pay , g ag; eac,y,wAawns 015l010101 1 I

- ~

1 l1 3l 0 8 9 9l0 0l1 l3 ol0 ol6 2l7 9l 0 0 1 5l0l0l0l { l

,,,,,,,, iHis aIPonT . so.MirTio Pva uaNT To ini atovintMiWT o io C. n 6 <Cs.a . . , . . , . ,,u...,, nu MODE m N so .orini ro sost.i no tsi.iisio.i T tiisi n 70 406 te Hilut 60 3eienst 60 73ieH3nvi 73 7 tist hcl 01010 to esi ntne oo ssienti so tstenrunn ofHtgs, gagepryr

..e,n n.o, x .. n .n ,o, o n,,n,n. nAi mA, 20 406tef(1llevi 60 73iell2itui to T3!sH2H.suh8 >

20 406 ten 1Het to 7 St.ittihui to 73+eif2Hs)

LICENSEt CONT ACT 904 THIS Lt R Ufl NAME Yt LLPHONE NUM9tR A8'l & CODE A. A. Fulvio, Regulatory F.ngineer 7l1l7 45 1 16 i- 171 oil 14 COMPLif t ONI LINE ton ( ACH COMPONENT f AltUpt DISCmitID IN THIS l'IPORT 113i C.AV6f 9T&Ttv COMPONENT

"' 'C j ' '0 TA t 0 CAUll S Y Si t V COMPOM NT ""Mf D "I,'g y",',a 7g 6Lt I  ! ! 1 l ! l I I I t i 1 1 l l l l l l l l 1 ! I l l l SUPPLEMENT As REPOpf IRPECitD M4' MONin Dat v t A 84 bvDM S$ TON vt S 149 vos teme ere iM9fCTIO Sv0V*S$rON DA TD NQ l l l

. . I e a & CT u .-, ,o e m ,,.<., . . ,,,, . -,,,,, , ,,, . , ,,,,,,,, . . , H . ,

On 5/30/90, during a test revision of the drywell fire detection instrumentation circuits surveillance test (ST), it was identified that the tests were not written to allow testing in accordance with Technical Specification (Tech Spec) 4.14.C.1.c and had not been performed in the required periodicity. ST 15.4B-2 and ST 15.5B-2 are required to be performed every 6 months. A review of the last performances indicated that the Unit 2 tests went out of surveillance on 11/30/89.

The root cause was an incorrect standard practice of only performing the test when shutdown. Consequently, the surveillance test was not completed within its specified interval.

A review indicated that the Unit 2 and Unit 3 tests were in surveillance at the time l of discovery. There were no actual safety consequences as a result of this event.

1 1

, The tests have been revised to clarify the testing requirements of Tech Spec 4.14.C.1.c and other smoke and heat detector tests have been reviewed and revised as required.

There were two previous similar events identified. A task force has been established I

to perform a root cause analysis on the generic issue of missed STs and assess the corrective actions taken as a result of previous events.

)

{ ,?

I y,c,,, . ~

maic . . us.

" u a =ucatta ea:uatoav couwess o=

LICENSEE EVENT CEPORT (LEI) TEXT CSNTINUATION amoveo ove wo +om exmars ersio

  1. ACiksty haast tis pocet.1 =ueetth m stm Nuutta (Si Pact tal

-P;ach Bottom Atomic Power Station "'" TM 7MeU Unit 2 0 l5 l0 l0 l0 l 2 l 7l7 9l 0 -

o ll l 3 -

o lo o l2 oF ol3 vtK1 f# nure assee e modest use asheapnar N4C #enn 3EA11(176 Requirements for the Report:

This report is required per 10 CFR 50.73(a)(2)(1)(B) due to surveillances not being performed when required by Technical Specifications (Tech Specs).

Unit Conditions at Time of Event:

Unit 2 was in the Refuel Mode at 0% of rated thermal reactor (Ells:RPV) power.

There were no systems, structures, or components that were inoperable that contributed to this event. '

Description of Event:

While performing a procedure revision on 5/30/90, 0730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br />, it was discovered that l two surveillances were not being performed in a periodicity as required by Tech Spec 4.14.C.1.c. The surveillance tests (STs) not performed were ST 15.4.B-2 " functional Test of Unit 2 Drywell Central / South Area Smoke Detectors", and ST 15.5B-2

" functional Test of Unit 2 Drywell South Area Smoke Detectors". Tech Spec 4.14.C.1.c requires that the supervised circuit between the local panel and the control room of the required fire detection instrumentation (Ells:lC) listed in Tech Spec Table 3.14.C.1 shall be demonstrated operable at least once per 6 months. These instruments are required to be operable when the equipment in that area is required to be operable. The same surveillances also satisfy Tech Spec 4.14.C.1.a by functionally testing the smoke detectors (EIIS:DET). Tech Spec 4.14.C.2 allows functional testing of the smoke detectors to be delayed until they are accessible. 1 Although the detectors were inaccessible, the supervised circuit was accessible and that portion of the procedure could have been performed.

The event was discovered during the initial draft of the STs to support the ST Rewrite Project. The stated frequency did not clearly represent the requirements of Tech Spec 4.14.C.1.c.

Cause of the Event:

The root cause was an incorrect standard practice of only performing the tests when I the drywell was accessible (i.e., shutdown). Heretofore, it was believed that the surveillances were only required to be performed when the instrumentation itself was accessible (Tech Spec 4.14.C.2). The test frequency did not clearly define that the test satisfied Tech Spec 4.14.C.1.c as well as 4.14.C.I.a. One procedure was used to test both the instrumentation and the supervised circuit. Whenever the instrumentation was not accessible, all parts of the test were delayed until access was available. Consequently, the surveillance tests were not completed within their l specified interval.

i Anal.ysis of the Event:

l No actual safety consequences occurred as a result of this event.

The event was discovered on 5/30/90. The Unit 2 tests went out of surveillance on 11/30/89. A review of the last performances of the surveillances was conducted. The

,,,,o...... . u . ~ m .. m .e -

%3) '

anc9;em seen U.S. tuCLlu 7.tIULt.f Dmy COMMittI04

, LICENSEE EVENT REPORT (LER) TEXT CENTINUATION onovto ous wo. mwp e EXPaRE$; $ '31/2

  1. ACilliV IsAMt (H DOCA 41 NUMOLR 426 Lim NUMetM 161 Pact tal P;ach Bottom Atomic Power Station viaa .

" g,tg,* 6 Ovy,p Unit 2 0 l5 l0 l0 l0 l2 l7 [7 9l0 -

ol1l3 - ojo ol3 oF o l3 71XT M swo space a newweg use esmoW NAC % .W64 W (17)

Unit 2 tests were completed satisfactorily on 3/10/90, four months later than required. The last performances of the Unit 3 surveilisnces were in the proper periodicity. At the time of discovery the Unit 2 ano the Unit 3 tests were found to t be in surveillance.

This event is considered to be of minimal saf ety significance. both units were in surveillance at the time of discovery. The detectors which this circuit supervises are inside the primary containment (EIIS:BD). During power operation the area is inerted and would not support combustion.

Corrective Actions:

i The tests have been revised to clarify the testing requirements of Tech $pec 4.14.C.1.c.

Other smoke and heat detector tests havt been reviewed for similar problems and ,

revised as needed.

A task force has been established to perform a root cause analysis on the gene-ic issue of missed STs. l Previous Similar Events: )

l Two previous similar LERs were identified. LER 3-89-11 and LER 2-90-09. Both .

indicated a programmatic deficiency in that it was an incorrect standard practice in the performance of the surveillances. Due to the number of missed sur- 'ilance tests in the last two years a task force has been established to perform a root cause )

analysis. Corrective actions taken in LER 3-89-11 and 2-90-09 did not prevent this event because they consisted of a review of surveillances associated with meeting an operational milestone. '

l l

eoxu sean ev.s. cros l'n-SN-58' 0ao7'