|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217N3311999-10-25025 October 1999 Informs That Attached Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation on 990929,of Operating License Amends 180 & 172,re Transition to Westinghouse-supplied Fuel ML20217L7171999-10-22022 October 1999 Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request ML20217K3431999-10-12012 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990921-23 ML20217K2521999-10-12012 October 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23 ML20217G5041999-09-30030 September 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16 ML20216J2171999-09-30030 September 1999 Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request ML20217A8391999-09-21021 September 1999 Concurs on Section E3.1 of Insp Repts 50-413/99-05 & 50-414/99-05 Re Review of Rev 7 of Catawba Ufsar.Notes Minor Typo Made in Input.Ref to Year Should Be 1998 & Not 1997 ML20217A8121999-09-21021 September 1999 Concurs with Insp Repts 50-413/99-05 & 50-414/99-05 for Catawba ML20211K3881999-09-0202 September 1999 Forwards Document Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amend 179 & 171 Re Reactor Trip System & Engineered Safety Feature Sys Setpoints on 990824 ML20210L6601999-08-0505 August 1999 Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call ML20195J0711999-06-14014 June 1999 Submits Issues to Be Discussed in Upcoming Conference Call Re Licensee Response to GL 98-04 ML20207G3711999-06-0909 June 1999 Forwards Questions That Were Transmitted to G Gilbert of DPC for Preparation for Upcoming Review on Site Re Rev 7 of Updated Final Safety Analysis Rept ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations ML20206H1861999-05-0606 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Amends 177 for Unit 1 & 169 for Unit 2, Concerning CR & Auxiliary Bldg Ventilation Actuation Instrumentation on 990423 ML20206H1671999-05-0505 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp, Which Signifies Implementation of Operating License Amends 178 & 170 Re Reactor Bldg Integrity Surveillance & Containment Leak Rate Testing on 990423 ML20206E8951999-05-0303 May 1999 Informs That Attached Questions Transmitted by Fax on 990503 to G Gilbert of Duke Energy Corp to Prepare Gilbert & Others for Upcoming Onsite Review of Changes Made Per 10CFR50.59 During 1998 ML20205N8921999-04-12012 April 1999 Forwards Implementation of Amend 176 & 168 to Operating Licenses for Units 1 & 2 Re Fuel Handling Ventilation Exhaust Sys on 990326 ML20205J0981999-04-0505 April 1999 Forwards Questions Transmitted on 990405 to G Gilbert of Duke Energy Corp to Prepare for Upcoming Telephone Calls ML20203F3621999-02-11011 February 1999 Forwards Exam Repts 50-413/97-300 & 50-414/97-300,with as Given Written Exam for Test Administered at Facility During Period 971201-05 & 15-19 ML20202H9011999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 174 & 166 Re Containment Pressure Control Sys on 990116 ML20202H9041999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 175 & 167 Re Diesel Engine Lube Oil Surveillance on 990116 ML20202C4181999-01-28028 January 1999 Informs That Time Provided by NRC within Which Commission May Act to Review Decision of Presiding Officer (LBP-98-30) Has Expired.Commission May Decline Any Review.With Certificate of Svc.Served on 990129 ML20199J1071999-01-21021 January 1999 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation Operating License Amends 173 & 165 Re Improved TSs on 990116 ML20199J1201999-01-21021 January 1999 Informs That Encl Questions Were Transmitted by Fax on 990121 to a Jones-Young of Duke Energy Corp,In Order to Prepare for Upcoming Telephone Call.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position ML20195H0421998-11-17017 November 1998 Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154N2601998-10-19019 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 172 & 163 on 981007 ML20154N2661998-10-16016 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 171 & 164 on 981007 ML20154N3221998-10-15015 October 1998 Forwards Document Signifying Implementation of Amends 170 & 162 to Licenses NPF-35 & NPF-52,respectively on 981001 ML20154A9431998-09-29029 September 1998 Forwards Lists of Plant Licensing Actions & Activities Which Were Transmitted by Fax on 980929 to M Kitlan,G Gilbert & L Keller.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subj to Change ML20153H0951998-09-28028 September 1998 Forwards Fax from Util,Verifying Implementation of Operating License Amend 168 for Unit 1 & Amend 160 for Unit 2 on 980922 ML20151Y0521998-09-16016 September 1998 Forwards Notarized Affidavit of D Payne,Supporting Denial of SRO License for Rl Herring.Staff Noted That Payne Signature Had Not Been Notarized ML20239A0801998-09-0303 September 1998 Forwards App D 221 Facility Operating License TS Amend Implementation Sheet Faxed from Duke Energy Corp.Document Signifies Implementation of Operating License Amend 169 for Unit 1 & 161 for Unit 2 on 980902 ML20237D6271998-08-24024 August 1998 Informs That Attached Questions Transmitted by Fax on 980824 by M Kitlan of Duke Energy Corp to Prepare for Upcoming Conference Call.Memo & Attached Do Not Cover Formal Request for Info or Represent NRC Staff Position ML20236U7421998-07-28028 July 1998 Forwards Questions Transmitted by Fax to M Purser of Duke Energy Corp to Prepare for Upcoming Conference Call on Licensee Response to GL 96-06 ML20236R9541998-07-23023 July 1998 Forwards Hearing File & Table of Contents Re R Herring,Per Presiding Officer Order of 980630 & 10CFR2.1231(b). W/Certificate of Svc ML20236R7771998-07-20020 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 166 & 158 on 980715 ML20236R7861998-07-16016 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 167 & 159 on 980715 ML20236R0381998-07-16016 July 1998 Forwards List of Catawba Licensing Actions & Activities Transmitted by 980716 Fax to M Kitlan & L Keller of Duke Energy Corp.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subject to Change W/O Notice ML20249C6451998-06-25025 June 1998 Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248F1061998-06-0202 June 1998 Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248A2731998-05-26026 May 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amends 165 & 157 for Unit 2 on 980526 ML20248A9601998-05-26026 May 1998 Forwards 980427 Facsimile Transmitted from Duke Energy Corp Which Signifies Implementation of Amends 164 (for Unit 1) & 156 (for Unit 2) on 980526 ML20247M8451998-05-19019 May 1998 Forwards Document Listing 10CFR50.59 Evaluations,Selected to Review Onsite & Questions on Rept Summarizing Plant Changes Made Under 10CFR50.59 in 1997.Memo & Attachments Does Not Convey Formal Request for Info or Represent Staff Position ML20217Q6151998-05-0707 May 1998 Notification of 980518 & 19 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217M1831998-05-0101 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss Plans for Changes to TS Re Following Ice Condenser Issues:Ice Weight Redistribution,Reduction & Block Ice Utilization ML20217M7231998-04-0101 April 1998 Forwards Fol/Ts Amend Implementation Sheet for Amends 163 & 155 for NPF-35 & NPF-52,respectively,on 980401.Amends Revise TS 6.9.1.9 to Ref Updated or Recently Approved Topical Repts Which Document Methodologies to Calculate Cycle Limits ML20203A4441998-02-0303 February 1998 Forwards Document Faxed to M Kitlan Re Issues for an Upcoming Telephone Conference ML20198M8931998-01-12012 January 1998 Notification of 980127 Meeting W/Util in Rockville,Md to Discuss Technical Issues Covered by DEC TR in Support of Future Transition from Framatome to Westinghouse Fuel ML20198K4931998-01-0808 January 1998 Forwards two-page Document That Contains All Actions That NRR Currently Handling 1999-09-30
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217N3311999-10-25025 October 1999 Informs That Attached Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation on 990929,of Operating License Amends 180 & 172,re Transition to Westinghouse-supplied Fuel ML20217L7171999-10-22022 October 1999 Informs That Encl Questions Were Transmitted by Email to PT Vu of Duke Energy Corp,In Preparation for Upcoming Telcon Re 990624 Amend Request ML20217K2521999-10-12012 October 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-302 & 50-414/99-302 (Including Completed & Graded Tests) for Tests Administered on 990921-23 ML20217K3431999-10-12012 October 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990921-23 ML20216J2171999-09-30030 September 1999 Informs That Encl Questions Were Transmitted by Email on 990930 to M Purser of Duke Energy Corp for Preparation of Upcoming Telcon.Questions Pertain to 990624 Amend Request ML20217G5041999-09-30030 September 1999 Forwards NRC Operator Licensing Exam Repts 50-413/99-301 & 50-414/99-301 (Including Completed & Graded Tests) for Tests Administered on 990524-27,0603,07-10 & 16 ML20217A8121999-09-21021 September 1999 Concurs with Insp Repts 50-413/99-05 & 50-414/99-05 for Catawba ML20217A8391999-09-21021 September 1999 Concurs on Section E3.1 of Insp Repts 50-413/99-05 & 50-414/99-05 Re Review of Rev 7 of Catawba Ufsar.Notes Minor Typo Made in Input.Ref to Year Should Be 1998 & Not 1997 ML20211K3881999-09-0202 September 1999 Forwards Document Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amend 179 & 171 Re Reactor Trip System & Engineered Safety Feature Sys Setpoints on 990824 ML20210L6601999-08-0505 August 1999 Forwards single-page Document Given to G Belisle of Region II by T Clements of Nuclear Control Institute Re Mixed Oxide Fuel ML20196K6231999-07-0101 July 1999 Forwards Draft Safety Evaluation on TR DPC-NE-2009, Duke Power Co Westinghouse Fuel Transition Rept. Rept Was Transmitted to Warren in Order to Prepare for Conference Call ML20195J0711999-06-14014 June 1999 Submits Issues to Be Discussed in Upcoming Conference Call Re Licensee Response to GL 98-04 ML20207G3711999-06-0909 June 1999 Forwards Questions That Were Transmitted to G Gilbert of DPC for Preparation for Upcoming Review on Site Re Rev 7 of Updated Final Safety Analysis Rept ML20206U4231999-05-18018 May 1999 Notification of 990602 Meeting with Duke Energy Corp,Vepco & Others in Rockville,Md to Discuss Technical,Regulatory & Licensing Issues Related to Proposed Future Use of Mixed Oxide Fuel at Catawba,Mcguire & North Anna Nuclear Stations ML20206H1861999-05-0606 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Amends 177 for Unit 1 & 169 for Unit 2, Concerning CR & Auxiliary Bldg Ventilation Actuation Instrumentation on 990423 ML20206H1671999-05-0505 May 1999 Forwards Document,Transmitted by Fax from Duke Energy Corp, Which Signifies Implementation of Operating License Amends 178 & 170 Re Reactor Bldg Integrity Surveillance & Containment Leak Rate Testing on 990423 ML20206E8951999-05-0303 May 1999 Informs That Attached Questions Transmitted by Fax on 990503 to G Gilbert of Duke Energy Corp to Prepare Gilbert & Others for Upcoming Onsite Review of Changes Made Per 10CFR50.59 During 1998 ML20205N8921999-04-12012 April 1999 Forwards Implementation of Amend 176 & 168 to Operating Licenses for Units 1 & 2 Re Fuel Handling Ventilation Exhaust Sys on 990326 ML20205J0981999-04-0505 April 1999 Forwards Questions Transmitted on 990405 to G Gilbert of Duke Energy Corp to Prepare for Upcoming Telephone Calls ML20203F3621999-02-11011 February 1999 Forwards Exam Repts 50-413/97-300 & 50-414/97-300,with as Given Written Exam for Test Administered at Facility During Period 971201-05 & 15-19 ML20202H9041999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 175 & 167 Re Diesel Engine Lube Oil Surveillance on 990116 ML20202H9011999-02-0303 February 1999 Forwards Document Sent by Duke Energy Corp,Which Signifies Implementation of Operating License Amends 174 & 166 Re Containment Pressure Control Sys on 990116 ML20202C4181999-01-28028 January 1999 Informs That Time Provided by NRC within Which Commission May Act to Review Decision of Presiding Officer (LBP-98-30) Has Expired.Commission May Decline Any Review.With Certificate of Svc.Served on 990129 ML20199J1201999-01-21021 January 1999 Informs That Encl Questions Were Transmitted by Fax on 990121 to a Jones-Young of Duke Energy Corp,In Order to Prepare for Upcoming Telephone Call.Memo & Encl Do Not Convey Formal Request for Info or Represent NRC Position ML20199J1071999-01-21021 January 1999 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation Operating License Amends 173 & 165 Re Improved TSs on 990116 ML20195H0421998-11-17017 November 1998 Informs That Encl Questions Were Transmitted by e-mail to Warren of Duke Energy Corp in Preparation for Upcoming Telephone Call.Memo & Enclosure Do Not Convey Formal Request for Info or Represent NRC Staff Position ML20154N2601998-10-19019 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 172 & 163 on 981007 ML20154N2661998-10-16016 October 1998 Informs That Encl Document,Transmitted by Fax from Duke Energy Corp,Signifies Implementation of Operating License Amends 171 & 164 on 981007 ML20154N3221998-10-15015 October 1998 Forwards Document Signifying Implementation of Amends 170 & 162 to Licenses NPF-35 & NPF-52,respectively on 981001 ML20154A9431998-09-29029 September 1998 Forwards Lists of Plant Licensing Actions & Activities Which Were Transmitted by Fax on 980929 to M Kitlan,G Gilbert & L Keller.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subj to Change ML20153H0951998-09-28028 September 1998 Forwards Fax from Util,Verifying Implementation of Operating License Amend 168 for Unit 1 & Amend 160 for Unit 2 on 980922 ML20151Y0521998-09-16016 September 1998 Forwards Notarized Affidavit of D Payne,Supporting Denial of SRO License for Rl Herring.Staff Noted That Payne Signature Had Not Been Notarized ML20239A0801998-09-0303 September 1998 Forwards App D 221 Facility Operating License TS Amend Implementation Sheet Faxed from Duke Energy Corp.Document Signifies Implementation of Operating License Amend 169 for Unit 1 & 161 for Unit 2 on 980902 ML20237D6271998-08-24024 August 1998 Informs That Attached Questions Transmitted by Fax on 980824 by M Kitlan of Duke Energy Corp to Prepare for Upcoming Conference Call.Memo & Attached Do Not Cover Formal Request for Info or Represent NRC Staff Position ML20236U7421998-07-28028 July 1998 Forwards Questions Transmitted by Fax to M Purser of Duke Energy Corp to Prepare for Upcoming Conference Call on Licensee Response to GL 96-06 ML20236R9541998-07-23023 July 1998 Forwards Hearing File & Table of Contents Re R Herring,Per Presiding Officer Order of 980630 & 10CFR2.1231(b). W/Certificate of Svc ML20236R7771998-07-20020 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 166 & 158 on 980715 ML20236R0381998-07-16016 July 1998 Forwards List of Catawba Licensing Actions & Activities Transmitted by 980716 Fax to M Kitlan & L Keller of Duke Energy Corp.Lists Do Not Convey Formal Request for Info or Represent NRC Staff Position & Subject to Change W/O Notice ML20236R7861998-07-16016 July 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp Re Implementation of Operating License Amends 167 & 159 on 980715 ML20249C6451998-06-25025 June 1998 Notification of 980709-10 Meeting W/Duke Energy Corp in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248F1061998-06-0202 June 1998 Notification of 980617 & 18 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20248A9601998-05-26026 May 1998 Forwards 980427 Facsimile Transmitted from Duke Energy Corp Which Signifies Implementation of Amends 164 (for Unit 1) & 156 (for Unit 2) on 980526 ML20248A2731998-05-26026 May 1998 Forwards Document,Transmitted by Fax from Duke Energy Corp, Signifying Implementation of Operating License Amends 165 & 157 for Unit 2 on 980526 ML20247M8451998-05-19019 May 1998 Forwards Document Listing 10CFR50.59 Evaluations,Selected to Review Onsite & Questions on Rept Summarizing Plant Changes Made Under 10CFR50.59 in 1997.Memo & Attachments Does Not Convey Formal Request for Info or Represent Staff Position ML20217Q6151998-05-0707 May 1998 Notification of 980518 & 19 Meeting W/Util in Rockville,Md to Discuss Technical Issues Re Proposed Improved TSs for Catawba & McGuire Nuclear Stations ML20217M1831998-05-0101 May 1998 Notification of 980514 Meeting W/Util in Rockville,Md to Discuss Plans for Changes to TS Re Following Ice Condenser Issues:Ice Weight Redistribution,Reduction & Block Ice Utilization ML20217M7231998-04-0101 April 1998 Forwards Fol/Ts Amend Implementation Sheet for Amends 163 & 155 for NPF-35 & NPF-52,respectively,on 980401.Amends Revise TS 6.9.1.9 to Ref Updated or Recently Approved Topical Repts Which Document Methodologies to Calculate Cycle Limits ML20203A4441998-02-0303 February 1998 Forwards Document Faxed to M Kitlan Re Issues for an Upcoming Telephone Conference ML20198M8931998-01-12012 January 1998 Notification of 980127 Meeting W/Util in Rockville,Md to Discuss Technical Issues Covered by DEC TR in Support of Future Transition from Framatome to Westinghouse Fuel ML20198K4931998-01-0808 January 1998 Forwards two-page Document That Contains All Actions That NRR Currently Handling 1999-09-30
[Table view] |
Text
.
9 June 15,1994 J.T. Harris A.P. Jackson S.D. Davenport T.W. Cheslak
Subject:
Catawba Nuclear Station Blast and Coat Drinking Water Line SCDHEC Construction Permit Approval File: CN-211.30 Attached please find the approved construction permit to install the drinking water line to serve the Blast and Coat Facility at Catawba.
Please note that any changes to the approved plans and specification may require additional approval from SCDHEC prior to implementation of the changes.
Additionally, this approval is for construction only and does not authorize this system to be placed into operation. Prior to operation of the system, an operational permit will have to be applied for and obtained before the system can be placed into service.
Should you have any questions feel free to give me a call at (704) 875-5965.
Sincerely,
,4 n k j(f John Estridge, Engineer Environmental Division, Water Protection jte/329 Attachments i
i cc: M.A. Lascara NRC Document Distribution List t
.3<. .,
9406220442 DR 940615 ADOCK 05000413 -
) g PDR
p.
South Carolina commissioner: Dougfas e Bryant HEC Depart,nent of Health and Envi onmental Controt Board: Fhchard E Jabbour. DOS Chairman Robert J Striphng. Jr., Vice Chairman Witham E. Applegate, Hi, John H Hurr6ss 2000 nun street. Coturntna. SC 29201 vromorma neann. Protecnno tne env,ronment BUREAU OF DRItiKItiG WATER PROTECTIOli "JUN 1151994 F0 FLE June 10, 1994 0 IlCKi1R: CnTE Q~ COP
6' -
Duke Power Co.
Attn: John Estridge .
13339 Hagers Ferry Rd. 9g Huntersville, lic 28078 ---
Dear Sirs:
Enclosed is your permit to start construction on the Blast &
Coat Facility-Catawba Nuclear St. water supply system. Unless construction is completed by the expiration date, it will be necessary to reapply since this permit will no longer be valid.
This permit is for construction onl_y, a permit to operate will have to be issued by the Department before the system can be placed into operation. If changes (line size or length, addition of treatment, addition of fire hydrants, etc.) are made during construction from the approved plans and specifications, prior approval must have been obtained from the permitting section. If minor changes (valve location, moving the fire hydrant a short distance, etc.) are made during construction from the approved plans and specifications, these changes must be shown on the as-built drawings and listed in the engineer's certification letter.
Your project is located in the Catawba EQC District. The person who will determine the need for a final inspection, make the inspection if deemed necessary, and issue the permit to operate if all the conditions of the permit are met is Mr. Al Williams, phone #7461. The following items must be submitted to the abcVe person at least three (3) days prior to any scheduling of a final inspection and/or issuance of a permit to operate.
- 1. A letter from the professional engineer of record (shown on your permit) certifying that the construction ,
has been completed and is in accordance with the I approved plans and specifications. The letter must contain the following items at a minimum. ]
1
- a. Permit number for which requesting final; I
- b. A statement that the project has been constructed in accordance with approved plans and specifications. If there are any minor changes, these changes and location of the changes must be stated.
. I c,
1 Page 2
- c. A statement stating that the certification is based on periodic inspections by the engineer or representative of the engineers office.
- 2. Copies of the bacteriological analysis with free chlorine residual recorded at the time of sample collection. The free chlorine residual must be in the range maintained by the water system. Distances on long distribution lines should not exceed 3,000 feet between sampling points.
- 3. Copies of the pressure / leakage test. This must include length of line, diameter of pipe tested, amount of water required to fill after test was performed and duration of the test.
- 4. Copies of the letter of acceptance from the utility which will operate and maintain the system.
- 5. Copies of record (as built) drawings if the project was not constructed exactly as permitted.
- 6. Copies of any information specified in a special condition of the construction permit.
- 7. Proof showing that any legal easement required for the 100 foot pollution free radius for wells have been obtained.
- 8. If the project involves chemical treatment of the water, a letter from the operator who will maintain the equipment stating his grade as well as who the back-up operator will be.
- 9. Copies of the Coastal Council's construction l
certification. (Coastal areas only)
- 10. Copies of the Water Resources Commission's approval if crossing navigable water bodies.
The following items must be submitted to the Water Supply Permitting Section, 2600 Bull Street, Columbia, SC, 29201, if the project includes a well:
I
- 1. If a test well was permitted only, the following additional information must be provided:
- a. Copies of the completed well record form.
- b. Copies of the geophysical / mechanical log.
l
I e
\ o* .
June 10, 1994 Page 3
- c. Copies of the pumping test.
- d. Copies of the required chemical analysis.
- 2. If a separate permit was not issued for the test well, then all the items listed in Item #1 above must be submitted with the addition of the performance curve of the well pump (s).
A permit to operate will be issued by the District EQC Office stating that the system is ready for operation once all the above requirements have been met. This letter must be in your possession before the system can be placed into operation.
This permit to operate is from DHEC only, all other permits from the City, County, or other agencies will be the owner's responsibility.
On July 1, 1993, the State Safe Drinking Water Act was amended to authorize the Department to collect an annual fee from each public water system. The monies collected are to be used for implementation of the federal Safe Drinking Water Act. The fee amount has been based on number of service connections, taps, or meters. This system will be billed annually by the Department for these fees.
I .i chere are any questions, please contact me at 734-5339.
Sincerely, 4dd -
Jack P. Pettit, P. E., Manager Water Supply Perritting Section i Water Supply Construction Division
/jmb I cvrltr.jpp l
cc: Mr. Tom Cheslak, P. E.
_ - - - ~_- - _ . .. . .. _ _ - -
- 1 i
,' South Carolina Commisskmer Douglas E.Bryani DHEC Depa'rtment of Heann and Enystonmental Control Board: Richard E. Jabbour. DDS. Chairrnan Robert J. Stripling, Jr, Mce Chairman William E. Applegate,111, John H. Durriss I "
g .,
2600 Duti Street, Columbia. SC 29201 Promoting Health. Protectung tne Envnronment BUREAU OF DRINKING WATER PROTECTION I CONSTRUCTION PERMIT Permission is Hereby Granted to: Duke Power Company Attn: John Estridge 13339 Hagers Ferry Road Huntersville, NC 28078 for the construction of a potable water source, treatment and/or distribution system in accordance with plans, specifications and design calculations dated January 1994, by Tom Cheslak, P.E.,
S.C. Registration No.: 11855.
PROJECT NAME: Blast & Coat Facility - Catawba Nuclear Station COUNTY: York PROJECT DESCRIPTION: Installation of approximately 40 LF of 8" water line,775 LF of 6" water line, two (2) fire hydrants and all necessary appartenances.
Water Provided By: York County System Number: 4610001 SPECIAL CONDITIONS:
Permit Number: 309614 Date: June 8,1994 EXPIRATION DATE: June 8,1996 This is a permit for construction only and does not constitute State Department of Health and Environmental Control approval, temporary or otherwise, to place this system in operation.
David C. Price, P.E., Director c -
PE Water Supply Permitting &
Technical Assistance Division JMJ 940765 cc: Tom Cheslak, P. E.
Al Williams, Dist. Dir.
K. Larry Baker, Dist. San Dir.
York County O mano on
. __ ,