December 2001 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML020350402
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 01/10/2002
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-02-006
Download: ML020350402 (5)


Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, Wl 54216-9511 Two Rivers, Wl 54241 920.388.2560 920.755.2321 Committed to Nuclear Excellen>W Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-006 January 10, 2002 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

DOCKET 50-305 OPERATING LICENSE DPR-43 KEWAUNEE NUCLEAR POWER PLANT MONTHLY OPERATING REPORT The narrative "Summary of Operating Experience" and completed forms covering plant and component availability for the Kewaunee Nuclear Power Plant for December 2001 are enclosed in accordance with Technical Specification 6.9.a.3.

Sincerely, KZL4J Thomas Coutu Thomas Coutu Manager-Kewaunee Plant MLA Enc.

cc - US NRC - Region III NRC Senior Resident Inspector INPO Records Center PSCW - Sharon Henning

KEWAUNEE NUCLEAR POWER PLANT - DOCKET 50-305

SUMMARY

OF OPERATING EXPERIENCE December 2001 Unit continued to be shut down for 2001 Refueling/Maintenance/SGR Outage until December 4. G- 1 was closed at 1935, full power (100%) was reached on December 19 at 1625. The unit continues to operate at 100%, steady state power.

Maintenance Group Activities for the Month Instrument and Control Group Activities for the Month I&C completed the following work orders for December:

"* Repaired several core exit thermocouple detector/indication problems

"* Repaired fitting leak on primary system transmitter

"* Installed DCR 3338 for pressure switches on SW header for pressure controls utilizing SW-4A and SW-4B

"* Replaced and repaired a temperature signal converter module in Foxboro protection rack

"* Supported Reactor Physics testing utilizing spare detector and N-43 detector

"* Repaired a leaking Swagelok fitting near RC-704 on Reactor head

"* Supported replacement of welded Swagelok fitting on S/G level transmitter condensing pot due to damaged fitting

"* Supported plant startup which included venting of transmitters on primary and secondary side

"* Corrected the sensing line misalignment on steam flow transmitter

"* Replaced the circuit board in N-43 drawer due to sticking test pushbutton

"* Replaced a pressure gauge on service water pump

"* Repaired module mounting screw holes in Foxboro racks

"* Recalibrated the Foxboro module for temperature setpoint 2, TC405L

"* Replaced solenoid coil on "A" main feedwater regulating valve and "A" main feedwater bypass valve due to EQ Electrical Maintenance Performed preventative maintenance and surveillance procedures on the following equipment:

"* Buses 1 & 2 UV/UF Relays

"* SP42-320A & B Auto Sequencer Relays

"* Reactor Trip Breakers

"* Buses 5 & 6 UV Relays

"* Station Batteries

"* Substation Batteries

"* Substation Inspection Work Orders:

"* Inverter BRA- 111 Repair

"* Inverters BRA- 112, BRB- 11 & 112 Frequency Adjustments

"* Demobilize SGR Facilities

"* Demobilize Ecolochem Trailers & Equipment Mechanical Maintenance

"* Installed insulation on the Pressurizer Surge Line and B Reactor Coolant Pump left during the outage

"* Installed a new actuator and valve on SW-301B, Emergency Diesel Generator B Service Water Return Isolation

"* Commenced trouble shooting 1B2 Traveling Water Screen

"* Performed PM's on the Charging Pump Dampeners

"* Replaced the mechanical seal on 1B Spent Fuel Pump

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO- 50-305 UNIT- KEWAUNEE COMPLETED BY- M. L. ANDERSON TELEPHONE- 920-388-8453 REPORT MONTH DECEMBER, 2001 AVERAGE DAILY DAY POWER LEVEL (MWE-NET) 1 0 2 0 3 24 4 18 5 131 6 132 7 213 8 385 9 388 10 438 11 484 12 483 13 483 14 504 15 508 16 508 17 525 18 529 19 525 20 529 21 533 22 525 23 533 24 525 25 533 26 529 27 529 28 529 29 529 30 529 31 533

DOCKET NO: 50-305 UNIT NAME: Kewaunee DATE: January 10, 2002 COMP BY: Mary L. Anderson TELEPHONE: 920-388-8453 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH - DECEMBER 2001 LER NO. DATE TYPE DURATION REASON METHOD NO. SYS COMPONENT COMMENTS Cycle XXIV-XXV Refueling Outage continued through 12/04. G-l was closed at 1935, full 4 12-01-01 S 80.2 C 4 N/A ZZ ZZZZZZ power was achieved on 12/19 at 1625. The unit continues to operate at 100% power, steady state operation.

1 4- 1 4 1- 1 1 I I 4- 1 4 + I I I

___ ______ 1_____ ________ _______ ________ +/- ____ a ____ a ___________ ____________________________

TYPE REASON METHOD SYSTEM & COMPONENT CODES F: FORCED A-Equipment Failure (explain) 1-Manual From NUREG-0161 S: SCHEDULED B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuations E-Operator Training & License Examination 5-Load Reductions F-Administrative 9-Other G-Operational Error (explain)

H-Other (explain)

OPERATING DATA REPORT DOCKET NO- 50-305 COMPLETED BY- M. L. ANDERSON TELEPHONE- 920-388-8453 OPERATING STATUS 1 UNIT NAME KEWAUNEE 2 REPORTING PERIOD DECEMBER, 2001 NOTES

  • G-1 was closed on 12/04 @ 1935
  • 3 LICENSED THERMAL POWER (MWT) 1650 4 NAMEPLATE RATING (GROSS MWE) 560 Full power was reached on 12/19 @ 1625
  • 5 DESIGN ELECTRICAL RATING (NET MWE) 535 Unit continues to operate at 100% power 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) 537 7 MAXIMUM DEPENDABLE CAPACITY (NET MWE) 511 8 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS None 9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) 10 REASONS FOR RESTRICTIONS, IF ANY THIS MONTH YR-TO-DATE CUMULATIVE 11 HOURS IN REPORTING PERIOD 744 8760 241466 12 NUMBER OF HOURS REACTOR WAS CRITICAL 723.8 7080.7 204965.9 13 REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 2330.5 14 HOURS GENERATOR ON-LINE 663.8 7010.8 202778.5 15 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 10.0 16 GROSS THERMAL ENERGY GENERATED (MWH) 950489 10974485 320664483 17 GROSS ELECTRICAL ENERGY GENERATED (MWH) 319300 3641400 106328900 18 NET ELECTRICAL ENERGY GENERATED (MWH) 303281 3461717 101173497 19 UNIT SERVICE FACTOR 89.2 80.0 84.0 20 UNIT AVAILABILITY FACTOR 89.2 80.0 84.0 21 UNIT CAPACITY FACTOR (USING MDC NET) 79.8 77.3 81.8 22 UNIT CAPACITY FACTOR (USING DER NET) 76.2 73.9 78.3 23 UNIT FORCED OUTAGE RATE 0.0 0.5 1.7 24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS N/A 25 IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP - N/A