Proposed Tech Spec Change Request 86 Addressing Requirements of NUREG-0737,Item II.K.3.3, Reporting Safety & Relief Valve Failures & Challenges, in Response to Generic Ltr 82-16
ML20070G770
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/15/1982
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20070G760 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.03, TASK-TM GL-82-16, TAC-49748, TAC-49749, NUDOCS 8212220427
Download: ML20070G770 (1)


Text

. - . . , , - _ . . _ _ _ _ . . . _ _ _ - . - - _ _ _ _ _ - - _ - _

. . c. 90 days following completien of tha startup tests.

b. 90 days following resumption or commencement of commercial i

. power operation. [

c. 9 months following intial criticality. '
8. Annual Results red Data Report  !
1. A results and data .'eport covering the period of the previous .

t calendar year shall be submitted prior to March 1 of each year.

2. This report shall include:
a. Complete results of steam generator tube inservice  ;

inspection completed during the calendar year as required  !

by specifil cation 15.4.2.c.2. f

, i,

b. A tabulation on an annual basis of the number of station, i utility, and other personnel receiving exposures greater i

than 100 mrem / year and their associated man-rem exposure l I

according to work and job functions. The dose assignments [

to various duty functions may be estimates based on pocket  ;

dosimeter, TLD or film s badge measurements. Small exposures totalling less than 20 percent of the individual total  !

dose need not be accounted for. In the aggregate, at k least 80Y. of the total whole body dose received from l external sources shall be assigned to upocific major I

work functions. s

c. A descriptica of facility changes, tests or experiments f as required pursusant to 10 CFR 50.59(b). I l
d. A tabulation of all challenges to the pressurizer power j operated relief valves or pressurize:.' safety valves.

t r

15.6.9-2  !

F212220427 821215 l PDR ADOCK 05000266 P PDR Unit 1 Amendment No. 31 i Unit 2 Amendment No. 35 December 23, 1977 l