Text
.
c.
90 days following completien of tha startup tests.
b.
90 days following resumption or commencement of commercial i
. power operation.
[
c.
9 months following intial criticality.
8.
Annual Results red Data Report 1.
A results and data.'eport covering the period of the previous t
calendar year shall be submitted prior to March 1 of each year.
2.
This report shall include:
a.
Complete results of steam generator tube inservice inspection completed during the calendar year as required by specifil cation 15.4.2.c.2.
f i,
b.
A tabulation on an annual basis of the number of station, i
utility, and other personnel receiving exposures greater i
than 100 mrem / year and their associated man-rem exposure l
I according to work and job functions.
The dose assignments
[
to various duty functions may be estimates based on pocket dosimeter, TLD or film badge measurements.
Small exposures s
totalling less than 20 percent of the individual total k
dose need not be accounted for.
In the aggregate, at least 80Y. of the total whole body dose received from l
external sources shall be assigned to upocific major I
work functions.
s c.
A descriptica of facility changes, tests or experiments f
I as required pursusant to 10 CFR 50.59(b).
l d.
A tabulation of all challenges to the pressurizer power j
operated relief valves or pressurize:.' safety valves.
t r
15.6.9-2 F212220427 821215 l
PDR ADOCK 05000266 P
PDR Unit 1 Amendment No. 31 i
Unit 2 Amendment No. 35 December 23, 1977 l
l
.O
'