GO2-02-062, March 2002 Monthly Operating Report for Columbia Generating Station

From kanterella
Revision as of 04:07, 27 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
March 2002 Monthly Operating Report for Columbia Generating Station
ML021130226
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/09/2002
From: Oxenford W
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-02-062
Download: ML021130226 (3)


Text

ENERGY NORTHWEST PO. Box 968 m Richland, Washington 99352-0968 April 9, 2002 G02-02-062 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

COLUMBIA GENERATING STATION OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT MARCH 2002 Transmitted herewith is the Monthly Operating Report for the month of March 2002 as required by Technical Specification 5.6.4.

Respectfully, W.S. Oxenford (Mail Drop 92A)

Plant General Manager Attachment cc: E.W. Merschoff - NRC RIV J.S. Cushing - NRR NRC Sr. Resident Inspector - 988C T.C. Poindexter - Winston & Strawn INPO ANI Library Utility Data Institute D.L. Williams - BPA ! 1399

OPERATING STATUS REPORT for Columbia Generating Station Date: April 1, 2002

1. Docket: 50-397
2. Reporting Period: March 2002
3. Utility

Contact:

Patricia Campbell (509) 377-4664

4. Design Electrical Rating (Net MWe): 1153
5. Maximum Dependable Capacity - summer (Net MWe): 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 744.0 1,944.8 113,095.5
7. Hours Generator On-Line 744.0 1,928.5 109,771.5
8. Unit Reserve Shutdown Hours 0.0 0.0 3,274.7
9. Net Electrical Energy (MWH) 831,207 2,145,908 108,417,393
10. Challenges to safety/relief valves: None

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: Columbia Generating Station DATE: April 1, 2002 COMPLETED BY: P. Campbell TELEPHONE: (509) 377-4664 REPORT PERIOD: March, 2002 Type Method of Cause / Corrective Actions F: Forced Duration Shutting No. Date S: Scheduled (Hours) Reason (1) Down(2) Comments N/A

SUMMARY

The plant began and ended the month at full power operation.

(1) REASON (2) METHOD A - Equipment Failure E - Operator Training & 1- Manual B - Maintenance or Test License Examination 2- Manual Trip/Scram C - Refueling F - Administration 3 - Auto Trip/Scram D - Regulatory Restriction G - Operational Error 4- Continuation H - Other 5- Other (Explain)