April 2002 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML021420444
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/06/2002
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-02-042
Download: ML021420444 (3)


Text

Kewaunee Nuclear Power Plant Point Beach Nuclear Plant N490 Highway 42 6610 Nuclear Road Kewaunee, WI 54216-9511 Two Rivers, WI 54241 920.388.2560 920.755.2321 Committed to Nuclear Excellence Kewaunee / Point Beach Nuclear Operated by Nuclear Management Company, LLC NRC-02-042 May 6, 2002 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Ladies/Gentlemen:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report The monthly operating report for the Kewaunee Nuclear Power Plant for April 2002 is enclosed in accordance with Technical Specification 6.9.a.3.

Sincerely, Thomas Coutu Manager-Kewaunee Plant MLA Enclosure cc - US NRC - Region III NRC Senior Resident Inspector INPO Records Center PSCW - Sharon Henning 7%

OPERATING DATA REPORT DOCKET NO. 50-305 Notes: Unit continues to operate at 100%

UNIT NAME KEWAUNEE power DATE May 6, 2002 COMPLETED BY MARY ANDERSON TELEPHONE (920) 388-8453 REPORTING PERIOD APRIL, 2002

1. DESIGN ELECTRICAL RATING (MWE-NET) 535
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 511 MONTH YEAR-TO-DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2879.0 207844.9
4. NUMBER OF HOURS GENERATOR WAS ON LINE 719.0 2879.0 205657.5
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 10.0
6. NET ELECTRICAL ENERGY (MWH) 379730 1521438 102694934

UNIT SHUTDOWNS DOCKET NO. 50-305 UNIT NAME KEWAUNEE DATE May 1, 2002 COMPLETED BY MARY ANDERSON TELEPHONE (920) 388-8453 REPORTING PERIOD APRIL, 2002 METHOD OF NO. DATE Type' DURATION REASON' SHUTTING CAUSE/CORRECTIVE ACTIONS (Hours) DOWN REACTOR3 (1) (2) (3)

F: Forced Reason: Method:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & License Examination Continuation F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

"*No shutdowns or power reductions in the reporting period

"*Unit continues to operate at 100% steady state operation