ML041950442

From kanterella
Revision as of 16:12, 24 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

RAI, Training and Qualification Plan
ML041950442
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/09/2004
From: Brian Benney
NRC/NRR/DLPM
To: Nunn D
Southern California Edison Co
References
TAC MC2969, TAC MC2970
Download: ML041950442 (3)


Text

SAFEGUARDS INFORMATION July 9, 2004 Mr. Dwight E. Nunn Vice President Southern California Edison Company P. O. Box 128 San Clemente, CA 92674-0128 c/o Mr. John Todd

SUBJECT:

SAN ONOFRE NUCLEAR STATION, UNITS 2 AND 3 - REQUEST FOR ADDITIONAL INFORMATION RE: TRAINING AND QUALIFICATION PLAN (TAC NOS. MC2969 AND MC2970)

Dear Mr. Nunn:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for San Onofre Nuclear Station, Units 2 and 3.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined based on its review of your Training and Qualification Plan that a request for additional information (RAI) is necessary in order to complete its evaluation. Please respond to the enclosed RAI within 10 working days from the date of receipt. If circumstances result in the need to revise the target response date, please contact me at (301)415-1460.

Sincerely,

/RA/

Brian Benney, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362

Enclosure:

As stated cc w/o encl: See next page WARNING: Violation of Section 147 of the Atomic Energy Act, Safeguards Information is NOTICE: The Enclosure contains Safeguards subject to Civil and Criminal Penalties Information. Upon separation from the Enclosure, this letter is DECONTROLLED.

SAFEGUARDS INFORMATION

July 9, 2004 Mr. Dwight E. Nunn Vice President Southern California Edison Company P. O. Box 128 San Clemente, CA 92674-0128 c/o Mr. John Todd

SUBJECT:

SAN ONOFRE NUCLEAR STATION, UNITS 2 AND 3 - REQUEST FOR ADDITIONAL INFORMATION RE: TRAINING AND QUALIFICATION PLAN (TAC NOS. MC2969 AND MC2970)

Dear Mr. Nunn:

In response to the April 29, 2003, Orders revising the design basis threat, you submitted a revised physical security plan, safeguards contingency plan, and training and qualification plan, including an implementation schedule, for San Onofre Nuclear Station, Units 2 and 3.

The Nuclear Regulatory Commission staff is reviewing your submission and has determined based on its review of your Training and Qualification Plan that a request for additional information (RAI) is necessary in order to complete its evaluation. Please respond to the enclosed RAI within 10 working days from the date of receipt. If circumstances result in the need to revise the target response date, please contact me at (301)415-1460.

Sincerely,

/RA/

Brian Benney, Project Manager Security Plan Review Team Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362

Enclosure:

As stated cc w/o encl: See next page DISTRIBUTION:

SPRT R/F RidsNsirDns RidsNrrDlpm OGC ACRS B. Pham S. Dembek H. Berkow A. Howell, RIV ADAMS Accession Number: ML041950442 OFFICE SPRT/NRR/PM SPRT/NRR/LA SPRT/NSIR SPRT/NRR/SC NAME BBenney CHawes JPeralta JNakoski DATE 07/09/04 07/09/04 07/09/04 07/09/04 OFFICIAL RECORD COPY

San Onofre Nuclear Generating Station, Units 2 and 3 cc:

Mr. Raymond Waldo, Plant Manager Mr. Ed Bailey, Chief Nuclear Generation Radiologic Health Branch Southern California Edison Company State Department of Health Services San Onofre Nuclear Generating Station Post Office Box 997414 (MS7610)

P. O. Box 128 Sacramento, CA 95899-7414 San Clemente, CA 92674-0128 Resident Inspector/San Onofre NPS Mr. Douglas K. Porter c/o U.S. Nuclear Regulatory Commission Southern California Edison Company Post Office Box 4329 2244 Walnut Grove Avenue San Clemente, CA 92674 Rosemead, CA 91770 Mayor Mr. David Spath, Chief City of San Clemente Division of Drinking Water and 100 Avenida Presidio Environmental Management San Clemente, CA 92672 P. O. Box 942732 Sacramento, CA 94234-7320 Mr. Dwight E. Nunn, Vice President Southern California Edison Company Chairman, Board of Supervisors San Onofre Nuclear Generating Station County of San Diego P.O. Box 128 1600 Pacific Highway, Room 335 San Clemente, CA 92674-0128 San Diego, CA 92101 Mr. James D. Boyd, Commissioner Eileen M. Teichert, Esq. California Energy Commission Supervising Deputy City Attorney 1516 Ninth Street (MS 31)

City of Riverside Sacramento, CA 95814 3900 Main Street Riverside, CA 92522 Mr. Joseph J. Wambold, Vice President Southern California Edison Company Mr. Gary L. Nolff San Onofre Nuclear Generating Station Power Projects/Contracts Manager P.O. Box 128 Riverside Public Utilities San Clemente, CA 92764-0128 2911 Adams Street Riverside, CA 92504 Mr. Steve Hsu Department of Health Services Regional Administrator, Region IV Radiologic Health Branch U.S. Nuclear Regulatory Commission MS 7610, P.O. Box 997414 611 Ryan Plaza Drive, Suite 400 Sacramento, CA 95899 Arlington, TX 76011-8064 Mr. Harold B. Ray Mr. Michael Olson Executive Vice President San Diego Gas & Electric Company Southern California Edison Company P.O. Box 1831 San Onofre Nuclear Generating Station San Diego, CA 92112-4150 P.O. Box 128, Mail Stop: D-3-F San Clemente, CA 92674-0128