January 2003 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML030440499
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 02/06/2003
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-009
Download: ML030440499 (3)


Text

NMc Committed to Nuclear Excellence Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-009 10 CFR 50.36 February 6, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 MONTHLY OPERATING REPORT The monthly operating report for the Kewaunee Nuclear Power Plant for January 2003 is enclosed in accordance with Technical Specification 6.9.a.3.

Thomas Coutu Site Vice-President, Kewaunee Plant MLA cc US NRC, Region III US NRC, Senior Resident Inspector INPO Records Center PSCW - Sharon Henning Attachment N490 Highway 42

  • Kewaunee, Wisconsin 54216-9510 Telephone 920.388.2560

OPERATING DATA REPORT DOCKET NO. 50-305 Notes: Unit continues to operate at 100%

UNIT NAME Kewaunee power.

DATE February 4, 2003 COMPLETED BY Mary Anderson TELEPHONE (920) 388-8453 REPORTING PERIOD January, 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 535
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 511 MONTH YEAR-TO-DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 214238.7
4. NUMBER OF HOURS GENERATOR WAS ON LINE 744.0 744.0 212037.3
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 10.0
6. NET ELECTRICAL ENERGY (MWH) 395017 395017 106037248

UNIT SHUTDOWNS DOCKET NO. 50-305 UNIT NAME Kewaunee DATE February 4, 2003 COMPLETED BY Mary Anderson TELEPHONE (920) 388-8453 REPORTING PERIOD January, 2003 METHOD OF NO. DATE Type' DURATION REASON 2 SHUTTING CAUSE/CORRECTIVE ACTIONS (Hours) DOWN REACTOR 3 No shutdowns or power reductions in January (1) (2) (3)

F: Forced Reason: Method:

S: Scheduled A- Equipment Failure (Explain) 1- Manual B- Maintenance or Test 2- Manual Trip/Scram C- Refueling 3- Automatic Trip/Scram D- Regulatory Restriction 4- Other (Explain)

E - Operator Training & License Examination Continuation F - Administrative 5 - Load Reductions G - Operational Error (Explain) 9 - Other H - Other (Explain)

SUMMARY

The unit continues to operate at 100% steady state power