August 2003 Monthly Operating Report for Kewaunee
ML032600928
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 09/08/2003
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-095
Download: ML032600928 (3)


Text

NMuc Committed to Nuclear Excelled ,,,_ Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-095 10 CFR 50.36 September 8, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 MONTHLY OPERATING REPORT The monthly operating report for the Kewaunee Nuclear Power Plant for August 2003 is enclosed in accordance with Technical Specification 6.9.a.3.

Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC MLA Enclosure cc: Administrator, Region IlIl, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC INPO Records Center Electric Division, PSCW N490 Highway 42

  • Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560 :5j52)Rf

OPERATING DATA REPORT i

DOCKET NO. 50-305 Notes:

UNIT NAME Kewaunee Unit continues to operate at 100% power.

DATE September 8, 2003 COMPLETED BY Mary Anderson TELEPHONE (920) 388-8453 REPORTING PERIOID August, 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 544
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 526 MONTH YEAR-TO-DATE CUMULATIE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4996.0 218490.7
4. NUMBER OF HOURS GENERATOR WAS ON LINE 744.0 4964.8 216258.1
5. UNIT RESERVE SHUTDOWN HOURS I 0.0 0.0 10.0
6. NET ELECTRICAL ENERGY (MWH) 398345 2580371 108222602

1r UNIT SHUTDOWNS DOCKET NO. 50-305 UNIT NAME Kewaunee DATE September 8,2003 COMPLETED BY Mary Anderson TELEPHONE (920) 388-8453 REPORTING PERIOD August, 2003 METHOD OF 2 CAUSE/CORRECTIVE ACTIONS NO. DATE Type DURATION REASON SHUTTING (Hours) DOWN 3

______ _____ REACTOR No shutdown or power reductions in August (I) (2) (3)

F: Forced Reason: Method:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & License Examination Continuation F - Administrative 5 - Load Reductions G - Operational Error (Explain) 9 - Other H - Other (Explain)

SUMMARY

The unit continues to operate at 100% steady state power.