Category:Letter type:GNRO
MONTHYEARGNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GNRO-2021/00037, 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 12021-11-30030 November 2021 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 1 GNRO-2021/00017, Notification of Readiness for Supplemental Inspection2021-06-22022 June 2021 Notification of Readiness for Supplemental Inspection GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency2021-06-0101 June 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency GNRO-2021/00015, Annual Radioactive Effluent Release Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.22062021-04-13013 April 2021 Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 GNRO-2020/00045, 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis2020-12-16016 December 2020 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2020/00034, Notification of Spent Fuel Cask Use2020-10-0808 October 2020 Notification of Spent Fuel Cask Use GNRO-2020/00033, Response to NRC Integrated Inspection Report 05000416/20200022020-09-10010 September 2020 Response to NRC Integrated Inspection Report 05000416/2020002 GNRO-2020/00029, Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 20202020-08-18018 August 2020 Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 2020 GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes GNRO-2020/00027, Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-07-16016 July 2020 Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00023, Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-06-26026 June 2020 Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2020/00020, Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-05-0505 May 2020 Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00018, Annual Radiological Effluent Release Report2020-04-30030 April 2020 Annual Radiological Effluent Release Report GNRO-2020/00016, Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.22062020-04-16016 April 2020 Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.2206 GNRO-2020/00015, Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test2020-04-0707 April 2020 Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 20192020-02-20020 February 2020 Spent Fuel Storage Radioactive Effluent Release Report for 2019 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2019/00052, Report of Changes and Errors to 10 CFR 50.46 Analysis2019-12-13013 December 2019 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2019/00051, Notification of Readiness of 92723 Inspection2019-12-11011 December 2019 Notification of Readiness of 92723 Inspection GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00037, Notification of Spent Fuel Cask Use2019-09-20020 September 2019 Notification of Spent Fuel Cask Use GNRO-2019/00036, Correction to Gnro 2019-00017 Emergency Plan Revision 782019-08-0808 August 2019 Correction to Gnro 2019-00017 Emergency Plan Revision 78 GNRO-2019/00027, Notification of Readiness of 95001 Supplemental Inspections2019-07-0303 July 2019 Notification of Readiness of 95001 Supplemental Inspections GNRO-2019/00031, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report2019-06-25025 June 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2019/00026, Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval2019-05-0606 May 2019 Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval GNRO-2019/00024, Annual Radioactive Effluent Release Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report GNRO-2019/00020, Annual Radiological Operating Report (AREOR)2019-04-30030 April 2019 Annual Radiological Operating Report (AREOR) GNRO-2019/00022, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.22062019-04-22022 April 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 GNRO-2019/00017, Emergency Plan, Revision 782019-03-14014 March 2019 Emergency Plan, Revision 78 GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval2019-03-13013 March 2019 Snubber Testing Program for Fourth Inspection Interval GNRO-2019/00012, Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2019-03-0606 March 2019 Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 20182019-02-21021 February 2019 Spent Fuel Storage Radioactive Effluent Release Report for 2018 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00057, Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan2018-12-0404 December 2018 Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan GNRO-2018/00055, Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ...2018-11-30030 November 2018 Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ... GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval2018-11-30030 November 2018 Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval GNRO-2018/00052, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information2018-10-24024 October 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00046, Submittal of 2018 Report of Changes and Errors to 10CFR50.462018-10-16016 October 2018 Submittal of 2018 Report of Changes and Errors to 10CFR50.46 GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report2018-10-16016 October 2018 Submittal of 2018 Inservice Inspection Summary Report GNRO-2018/00048, Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-10010 October 2018 Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 12018-09-18018 September 2018 Core Operating Limits Report Cycle 22, Revision 1 GNRO-2018/00043, Revised Offsite Dose Calculation Manual2018-09-18018 September 2018 Revised Offsite Dose Calculation Manual GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes GNRO-2018/00040, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 20182018-08-20020 August 2018 Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 2018 2023-06-06
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23033A0492023-02-0101 February 2023 Emergency Action Level (EAL) Technical Bases Document Revision 3 ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 ML20091M3632020-03-31031 March 2020 Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. ML19072A2812019-03-13013 March 2019 Supplement 1 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00029, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-06-0707 June 2018 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00008, (GGNS) - License Amendment Request: Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 62018-04-27027 April 2018 (GGNS) - License Amendment Request: Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-04-12012 April 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-10010 April 2018 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. GNRO-2017/00061, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis2017-11-0303 November 2017 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis ML17268A2132017-09-21021 September 2017 ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2017-00005, and Isfsl - License Amendment Request for Administrative Change to Licensee Name2017-03-29029 March 2017 and Isfsl - License Amendment Request for Administrative Change to Licensee Name GNRO-2016/00062, License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass2016-12-29029 December 2016 License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass GNRO-2016/00051, Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System..2016-10-26026 October 2016 Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System.. GNRO-2016/00034, License Renewal Documents to Support Review of Application for Renewal2016-10-10010 October 2016 License Renewal Documents to Support Review of Application for Renewal GNRO-2015/00087, Supplemental Letter to Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing to Provide Relief Request in Format Requested By..2015-12-0202 December 2015 Supplemental Letter to Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing to Provide Relief Request in Format Requested By.. GNRO-2015/00037, Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing2015-09-15015 September 2015 Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing GNRO-2015/00029, License Amendment Request - Cyber Security Plan Implementation2015-06-29029 June 2015 License Amendment Request - Cyber Security Plan Implementation GNRO-2015/00038, Response to Request for Additional Information Regarding Fluence License Amendment Request, Request for Commitment2015-06-11011 June 2015 Response to Request for Additional Information Regarding Fluence License Amendment Request, Request for Commitment GNRO-2015/00026, Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals2015-05-27027 May 2015 Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals GNRO-2014/00078, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month2014-12-15015 December 2014 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints2014-08-0101 August 2014 License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints GNRO-2013/00090, License Amendment Request - Cyber Security Plan Implementation Schedule2013-12-19019 December 2013 License Amendment Request - Cyber Security Plan Implementation Schedule GNRO-2013/00067, LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel..2013-11-0808 November 2013 LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel.. CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments GNRO-2012/00132, License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low.2012-11-0909 November 2012 License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low. GNRO-2012/00125, Final Feedwater Temperature Reduction License Amendment Request2012-10-26026 October 2012 Final Feedwater Temperature Reduction License Amendment Request GNRO-2012/00096, License Amendment Request for Implementing a 24-Month Fuel Cycle, Grand Gulf Nuclear Station, Unit 12012-10-0202 October 2012 License Amendment Request for Implementing a 24-Month Fuel Cycle, Grand Gulf Nuclear Station, Unit 1 GNRO-2012/00102, Request to Revise the Standby Service Water Passive Failure Methodology2012-09-14014 September 2012 Request to Revise the Standby Service Water Passive Failure Methodology ML12157A1792012-05-23023 May 2012 Attachment 6 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment I Labeled GGNS NPDES Permit Renewal Application (2007) GNRO-2012/00001, License Amendment Request - Standby Liquid Control System2012-01-23023 January 2012 License Amendment Request - Standby Liquid Control System ML11308A4852011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment C - Clean Water Act Documentation, Part 4 of 4 GNRO-2011/00064, License Amendment Request to Revise Technical Specification 2.1.1.22011-10-28028 October 2011 License Amendment Request to Revise Technical Specification 2.1.1.2 ML11308A0952011-10-28028 October 2011 License Renewal Application Technical Information - Appendix a - Updated Final Safety Analysis Report Supplement ML11308A0982011-10-28028 October 2011 License Renewal Application Technical Information - Appendix C - Response to BWRVIP Applicant Action Items ML11308A2442011-10-28028 October 2011 Applicant'S Environmental Report, Operating License Renewal Stage, Attachment a - Threatened and Endangered Species Correspondence, Part 2 of 3 2023-07-27
[Table view] Category:Technical Specification
MONTHYEARML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23033A0492023-02-0101 February 2023 Emergency Action Level (EAL) Technical Bases Document Revision 3 ML22223A0512022-08-11011 August 2022 Report of Technical Specification Bases Changes CNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21266A1612021-09-23023 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated ML21105A0522021-04-15015 April 2021 EAL Technical Bases Document Revision 1 ML21062A1982021-03-0303 March 2021 Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 ML20262H2252020-09-18018 September 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Using the Consolidated Line Item Improvement GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes ML20134H9592020-05-12012 May 2020 Technical Specification Bases 3.10 ML20134H8802020-05-12012 May 2020 Technical Specification Bases 3.1 ML20134H8672020-05-12012 May 2020 Technical Specification Bases 2.0 ML20134H9562020-05-12012 May 2020 Technical Specification Bases 3.9 ML20134H9532020-05-12012 May 2020 Technical Specification Bases 3.8 ML20134H9502020-05-12012 May 2020 Technical Specification Bases 3.7 ML20134H8772020-05-12012 May 2020 Technical Specification Bases 3.0 ML20134H8872020-05-12012 May 2020 Technical Specification Bases 3.2 ML20134H9372020-05-12012 May 2020 Technical Specification Bases 3.6 ML20134H8892020-05-12012 May 2020 Technical Specification Bases 3.3 ML20134H9312020-05-12012 May 2020 Technical Specification Bases 3.4 ML20134H9352020-05-12012 May 2020 Technical Specification Bases 3.5 CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-04-12012 April 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-10010 April 2018 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals GNRO-2015/00002, Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/20142015-03-27027 March 2015 Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/2014 GNRO-2015/00020, Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density2015-03-27027 March 2015 Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density GNRO-2014/00058, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00057, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints2014-08-0101 August 2014 License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints GNRO-2014/00050, Correction of Technical Specification Typographical Error2014-07-31031 July 2014 Correction of Technical Specification Typographical Error ML13316B0242013-11-0808 November 2013 Application for Technical Specification Changes: Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specifications End States GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update2012-12-21021 December 2012 Technical Requirements Manual and Technical Specification Bases Update ML12277A0812012-10-0202 October 2012 Proposed Techincal Specification Changes ML11308A1032011-10-28028 October 2011 License Renewal Application - Appendix D - Technical Specification Changes GNRO-2011/00004, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0606 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. GNRO-2010/00042, Technical Specification Bases & Technical Requirements Manual Update2010-05-27027 May 2010 Technical Specification Bases & Technical Requirements Manual Update GNRO-2010/00009, Technical Specification Bases Update to the NRC for Period Dated January 20, 20092010-01-20020 January 2010 Technical Specification Bases Update to the NRC for Period Dated January 20, 2009 GNRO-2009/00062, License Amendment Request to Revise Minimum Critical Power Ratio Safety Limits2009-10-27027 October 2009 License Amendment Request to Revise Minimum Critical Power Ratio Safety Limits ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions2009-04-27027 April 2009 Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions GNRO-2009/00028, Technical Specification Bases Update to the NRC for Period Dated April 22, 20092009-04-22022 April 2009 Technical Specification Bases Update to the NRC for Period Dated April 22, 2009 GNRO-2009/00017, Technical Specification Bases Update to the NRC for Period Dated March 4, 20092009-03-0404 March 2009 Technical Specification Bases Update to the NRC for Period Dated March 4, 2009 GNRO-2009/00008, Technical Specification Bases Update to the NRC for Period Dated January 23, 20092009-01-23023 January 2009 Technical Specification Bases Update to the NRC for Period Dated January 23, 2009 GNRO-2008/00069, Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 20082008-10-22022 October 2008 Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 2008 GNRO-2008/00013, License Amendment Request, Technical Specification Surveillance Requirements for Diesel Generator Slow Start Testing2008-09-11011 September 2008 License Amendment Request, Technical Specification Surveillance Requirements for Diesel Generator Slow Start Testing GNRO-2008/00049, Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-4482008-09-0202 September 2008 Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-448 2023-07-27
[Table view] Category:Bases Change
MONTHYEARML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23033A0492023-02-0101 February 2023 Emergency Action Level (EAL) Technical Bases Document Revision 3 ML22223A0512022-08-11011 August 2022 Report of Technical Specification Bases Changes ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21105A0522021-04-15015 April 2021 EAL Technical Bases Document Revision 1 ML20262H2252020-09-18018 September 2020 Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program Using the Consolidated Line Item Improvement GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes ML20134H8892020-05-12012 May 2020 Technical Specification Bases 3.3 ML20134H9312020-05-12012 May 2020 Technical Specification Bases 3.4 ML20134H8872020-05-12012 May 2020 Technical Specification Bases 3.2 ML20134H8772020-05-12012 May 2020 Technical Specification Bases 3.0 ML20134H8672020-05-12012 May 2020 Technical Specification Bases 2.0 ML20134H9352020-05-12012 May 2020 Technical Specification Bases 3.5 ML20134H9372020-05-12012 May 2020 Technical Specification Bases 3.6 ML20134H9502020-05-12012 May 2020 Technical Specification Bases 3.7 ML20134H9532020-05-12012 May 2020 Technical Specification Bases 3.8 ML20134H9562020-05-12012 May 2020 Technical Specification Bases 3.9 ML20134H9592020-05-12012 May 2020 Technical Specification Bases 3.10 ML20134H8802020-05-12012 May 2020 Technical Specification Bases 3.1 CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)2018-04-12012 April 2018 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425) GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-10010 April 2018 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control. ML18085A5792018-03-26026 March 2018 Proposed Revision of Replacement of Turbine First Stage Pressure Signals with Power Range Neutron Monitoring System Signals GNRO-2015/00020, Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density2015-03-27027 March 2015 Revision to Letter GNRO-2014/00091 Dated January 6,2015 to Add Revision Number Eight (8) to Reference NEDC-33075P-A, GE Hitachi Boiling Water Reactor Detect and Suppress Solution - Confirmation Density GNRO-2014/00058, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00057, Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330)2014-08-29029 August 2014 Letter GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update (ML12361A330) GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints2014-08-0101 August 2014 License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints ML13316B0242013-11-0808 November 2013 Application for Technical Specification Changes: Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-423, Technical Specifications End States GNRO-2012/00146, Technical Requirements Manual and Technical Specification Bases Update2012-12-21021 December 2012 Technical Requirements Manual and Technical Specification Bases Update ML11308A1032011-10-28028 October 2011 License Renewal Application - Appendix D - Technical Specification Changes GNRO-2011/00004, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.2011-04-0606 April 2011 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation. GNRO-2010/00042, Technical Specification Bases & Technical Requirements Manual Update2010-05-27027 May 2010 Technical Specification Bases & Technical Requirements Manual Update GNRO-2010/00009, Technical Specification Bases Update to the NRC for Period Dated January 20, 20092010-01-20020 January 2010 Technical Specification Bases Update to the NRC for Period Dated January 20, 2009 GNRO-2009/00028, Technical Specification Bases Update to the NRC for Period Dated April 22, 20092009-04-22022 April 2009 Technical Specification Bases Update to the NRC for Period Dated April 22, 2009 GNRO-2009/00017, Technical Specification Bases Update to the NRC for Period Dated March 4, 20092009-03-0404 March 2009 Technical Specification Bases Update to the NRC for Period Dated March 4, 2009 GNRO-2009/00008, Technical Specification Bases Update to the NRC for Period Dated January 23, 20092009-01-23023 January 2009 Technical Specification Bases Update to the NRC for Period Dated January 23, 2009 GNRO-2008/00069, Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 20082008-10-22022 October 2008 Technical Specification Bases and Technical Requirements Manual Update to the NRC for Period Dated October 22, 2008 GNRO-2008/00049, Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-4482008-09-0202 September 2008 Supplemental No. 2 to Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability TSTF-448 GNRO-2008/00025, Technical Specification Bases Update to the NRC for Period Dated March 5, 20082008-03-0505 March 2008 Technical Specification Bases Update to the NRC for Period Dated March 5, 2008 GNRO-2007/00073, Technical Specification Bases Update to the NRC for Period Dated December 03, 20072007-12-0303 December 2007 Technical Specification Bases Update to the NRC for Period Dated December 03, 2007 GNRO-2007/00049, Technical Specification Bases Update to the NRC for Period Dated July 25, 20072007-07-25025 July 2007 Technical Specification Bases Update to the NRC for Period Dated July 25, 2007 GNRO-2007/00043, Technical Specification Bases Update to the NRC for Period Dated June 13, 20072007-06-13013 June 2007 Technical Specification Bases Update to the NRC for Period Dated June 13, 2007 GNRO-2007/00021, Technical Specification Bases, Technical Requirements Manual and Core Operating Limits Updates to the NRC for Period Dated April 7, 20072007-04-11011 April 2007 Technical Specification Bases, Technical Requirements Manual and Core Operating Limits Updates to the NRC for Period Dated April 7, 2007 GNRO-2007/00019, Technical Specification Bases Update to the NRC for Period Dated March 30, 20072007-03-30030 March 2007 Technical Specification Bases Update to the NRC for Period Dated March 30, 2007 GNRO-2006/00054, Technical Specification Bases Update to the NRC for Period Dated September 28, 20062006-09-28028 September 2006 Technical Specification Bases Update to the NRC for Period Dated September 28, 2006 GNRO-2006/00030, Technical Specification Bases Update to the NRC for Period Dated February 16, 20062006-05-15015 May 2006 Technical Specification Bases Update to the NRC for Period Dated February 16, 2006 GNRO-2006/00008, Technical Specification Bases Update to the NRC for Period Dated February 16, 20062006-02-16016 February 2006 Technical Specification Bases Update to the NRC for Period Dated February 16, 2006 GNRO-2006/00003, Technical Requirements Manual Update to the NRC for Period Dated January 17, 20062006-01-17017 January 2006 Technical Requirements Manual Update to the NRC for Period Dated January 17, 2006 2023-07-27
[Table view] |
Text
U-Entergy P.O. Box 756 Port Gibson, MS 39150 Tel 601 437 6409 George A. Williams Vice President-Operations Grand Gulf Nuclear Station GNRO-2005/00038 June 27, 2005 U.S. Nuclear Regulatory Commission Attn: DocumentControl 'Desk Washington, DC 20555
SUBJECT:
License Amendment Request Use of Relief Valves to Isolate Penetration Flow Paths Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29
Dear Sir or Madam:
Pursuant to 10 CFR 50.90, Entergy Operations, Inc. (Entergy) hereby requests the following Amendment for Grand Gulf Nuclear Station, Unit I (GGNS). The GGNS Technical Specifications (TS) require specific actions to be taken for inoperable Primary Containment Isolation Valves (PCIVs). The TS Required Actions include isolating the affected penetration flow path in order to minimize the potential for post-accident containment leakage. The currently approved isolation methods are limited to closed and deactivated automatic valves, closed manual valves, blind flanges, and check valves with flow through the valve secured. These methods are consistent with Standard Technical Specifications, NUREG-1434. This proposed change adds closed relief valves as acceptable isolation devices provided that the relief setpoint is greater than 1.5 times containment design pressure.
The proposed change has been evaluated in accordance with 10 CFR 50.91 (a)(1) using criteria in 10 CFR 50.92(c) and it has been determined that this change involves no significant hazards consideration. The bases for these determinations are included in the attached submittal.
The proposed change does not include any new commitments.
Entergy requests approval of the proposed Amendment by May 31, 2006. Once approved, the Amendment shall be implemented within 60 days. Although this request is neither exigent nor emergency, your prompt review is requested.
DA
I I, GNRO-2005/00038 Page 2 of 2 If you have any questions or require additional information, please contact Ron Byrd at 601-368-5792.
I declare under penalty of perjury that the foregoing is true and correct. Executed on June 27, 2005.
Sincerely, GAW/RWE amt Attachments:
- 1. Analysis of Proposed Technical Specification Change
- 2. Proposed Technical Specification Changes (mark-up)
- 3. Changes to Technical Specification Bases Pages - For Information Only cc: Dr. Bruce S. Mallett Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 U. S. Nuclear Regulatory Commission ATTN: Mr. Bhalchandra Vaidya, NRRIDLPM ATTN: ADDRESSEE ONLY ATTN: U.S. Postal Delivery Address Only Mail Stop OWFN/7D-1 Washington, DC 20555-0001 Mr. Brian W. Amy, MD, MHA, MPH Mississippi Department of Health P. 0. BoX 1700 Jackson, MS 39215-1700 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 Mr. D. E. Levanway (Wise Carter)
Mr. L. J. Smith (Wise Carter)
Mr. N. S. Reynolds Mr. J. N. Compton
Attachment I GNRO-2005/00038 Analysis of Proposed Technical Specification Change to GNRO-2005/00038 Page 1 of 6
1.0 DESCRIPTION
This letter is a request to amend Operating License NPF-29 for Grand Gulf Nuclear Station, Unit 1 (GGNS).
The proposed change will revise the Operating License to amend the Technical Specification Required Actions for inoperable Primary Containment Isolation Valves (PCIVs). The TS Required Actions for inoperable PCIVs include isolating the affected penetration flow path in order to minimize the potential for post-accident containment leakage. The currently approved isolation methods are limited to closed and deactivated automatic valves, closed manual valves, blind flanges, and check valves with flow through the valve secured. This change adds closed relief valves as acceptable isolation devices provided that the relief setpoint is greater than 1.5 times containment design pressure.
2.0 PROPOSED CHANGE
Technical Specification 3.6.1.3 requires each PCIV to be OPERABLE in MODES 1, 2, and 3 and some PCIVs to be OPERABLE during certain other shutdown and refueling conditions. If a PCIV is inoperable in one or more penetration flow paths, then Condition A must be entered and the containment penetration flow paths must be isolated. Condition B requires similar actions for two or more inoperable PCIVs in one or more penetration flow paths. The methods of performing this isolation are stipulated in TS Required Actions A.1 and B.1. The methods include: at least one closed and de-activated automatic isolation valve, closed manual valve, blind flange, or check valve with flow through the valve secured. This change will add another method of isolating these penetration flow paths. The TS Required Actions are revised to include the use of closed relief valves as a method of isolating a penetration flow path provided that the relief setpoint is greater than 1.5 times containment design pressure.
Appropriate Bases changes are also made to reflect the additional isolation method and are provided in Attachment 3 for your information. Entergy will implement the TS Bases changes in accordance with the GGNS Bases Control Program, TS 5.5.11.
3.0 BACKGROUND
The design objective 6f the containment isolation system is to allow the normal or emergency passage of fluids through the containment boundary while preserving the ability of the boundary to prevent or limit the escape of fission products that may result from postulated accidents. Typically, two barriers are provided for each containment penetration so that no' single credible failure or malfunction of an active component can result in a loss of isolation or leakage that exceeds limits assumed in the safety analysis. One of these barriers may be other than a PCIV, such as a closed system. Some containment penetrations may be designed with only one barrier, such as a welded spare penetration.
The PCIVs help ensure that an adequate primary containment boundary is maintained during and after an accident by isolating the potential release paths to the environment. With one or more PCIVs in a penetration flow path inoperable, the TS require the affected penetration flow path to be isolated. The current method of isolation is the use of at least one isolation barrier
Attachment 1 to a GNRO-2005/00038 Page 2 of 6
,that cannot be adversely affected by a single active failure. ,Isolation barriers that are considered to meet this critenon include a closed and de-activated automatic valve, a closed manual valve, a blind flange, and a check valve with flow through the valve secured. The TS Bases also state that the device used to isolate the penetration flow path should be the closest available one to the primary containment.
Typically, the device used to isolate the penetration flow path is one of the penetration PCIVs.
In some cases, one of the PCIVs for a particular containment penetration may be a relief valve. However, the current TS Actions do not specifically recognize a closed relief valve as an acceptable method of isolating a penetration flow path. Thus, special measures may need to be taken to comply with the TS Required Actions, such as replacing the relief valve with a blind flange. While such actions may provide additional assurance of preserving the containment isolation function, it may also have adverse safety affects such as disabling the overpressure protective safety feature, causing additional safety system unavailability time, and increasing occupational dose. The proposed TS change would allow such closed relief valves to be used to isolate the penetration flow path without any special modification provided the relief setpoint is greater than 1.5 times the containment design pressure.
Similarly, in the situation where a penetration is designed with only one PCIV and it cannot be closed, the next valve in the flow path (i.e., the next closest to the containment) must be closed. If a relief valve is installed on the piping between that valve and the containment, the relief valve could also be considered another penetration flow path. The TS is not clear as to whether closed relief valves that are part of a closed system boundary, designed to maintain system integrity, need to be considered part of a penetration flow path for the purpose of complying with the TS Required Actions. If it were considered to be a penetration flow path, then special measures must likewise be taken to comply with the TS Required Actions, such as replacing the relief valve with a blind flange. The proposed TS change resolves the ambiguity in this situation by conservatively treating the relief valve as an affected penetration flow path and allowing it to be used to meet the TS Required Action without disabling its relief function as long as it was closed and had an acceptable relief setpoint.
4.0 TECHNICAL ANALYSIS
Containment isolation devices consist of either passive devices or active (automatic) devices.
Passive devices ar3 those in which mechanical movement need not occur in order for the component to perform its intended safety function. Manual valves, de-activated automatic valves secured in their closed pozition (including check valves with flow through the valve secured), blind flanges, and closed systems are considered passive devices. Check valves, or other automatic valves designed to close without operator action following an -accident,,are considered active devices. Relief valves are also considered to be passive isolation devices because no mechanical movement is required to perform the isolation function. Relief valves are designed to be normally closed to preserve the piping boundary integrity yet automatically open on an abnormal process pressure to protect the piping from overpressure conditions.
The relevant failure mode for a relief valve in regards to a containment isolation function is premature or inadvertent opening. The Standard Review Plan (SRP), NUREG-0800, addresses this concern by establishing an acceptable setpoint margin for relief valves to be used as isolation devices. Section 6.2.4, "Containment Isolation System" of the SRP states,
'Relief valves may be used as isolation valves provided the relief setpoint is greater than 1.5 to GNRO-2005/00038 Page 3 of 6 times the containment design pressure." This relief setpoint requirement is also consistent with ANSI/ANS 56.2-1 984 '"Cntainment Isolation ProvisionsfOrf6Flid Systems After a LOCA," which states that the set pressure of the relief valve shall be at least 50 percent greater than containment design pressure. These relief setpoint requirements provide sufficient margin to minimize the potential for inadvertent opening due to containment post-accident pressures.
ANSI/ANS 56.2-1984 also provides criteria for closed systems which serve as containment barriers. Section 3.6.7 states that closed systems outside containment must be able to withstand temperature and internal pressure equal to the containment design conditions and also be protected against overpressure from thermal expansion of contained fluid when isolated. The proposed change satisfies these objectives by requiring the relief setpoint to be greater than 1.5 times containment design conditions while preserving overpressure protection of the system piping.
A relief valve that has a relief setpoint greater than 1.5 times the containment design pressure provides ample margin to ensure that an adequate primary containment boundary is maintained during and after an accident. The margin between the design basis LOCA-maximum peak containment pressure (Pa) and the relief valve setpoint is actually greater than 50% since it includes the containment design margin. For example, since the GGNS containment design pressure is 15 psig, the relief setpoint for the relief valve must be greater than 22.5 psig (15 psig x 1.5). In this example, the relief setpoint is 7.5 psig above containment design pressure but there is actually a larger margin of 11 psig above Pa (11.5 psig for GGNS). Closed relief valves with relief setpoints of this margin provide an isolation barrier alternative that is less susceptible to a single failure (inadvertent opening) yet still preserves the overpressure protection that the component was intended to provide.
In summary, the proposed TS change is needed to clarify how relief valves in a penetration flow path should be treated when the normal PCIV for the penetration is inoperable and cannot be closed to comply with the TS Required Actions. Allowing a relief valve with an acceptable relief setpoint to be used to isolate a containment penetration flow path preserves both the containment isolation function and the system overpressure protection function. The proposed change also avoids unnecessary safety system unavailability time and unnecessary occupational dose that would be associated with disabling the relief valve.
5.0 REGULATORY ANALYSIS
5.1 Applicable Regulatory Requirements/Criteria The proposed changes have been evaluated to determine whether applicable regulations and requirements continue to be met.
Entergy has determined that the proposed changes do not require any exemptions or relief from regulatory requirements, other than the TS, and do not affect conformance with any General Design Criterion (GDC) differently than described in the Updated Final Safety Analysis Report (UFSAR.)
General Design Criteria 54, 55, 56, and 57 of 10 CFR 50 Appendix A require that piping systems penetrating primary reactor containment be provided with isolation capabilities. The
I Attachment I to GNRO-2005/00038 Page 4 of 6 i3 ;*-!;;-.`
proposed change does not alter any of the operability or functional design requirements for containment isolation features. The proposed change only affects the measures used to compensate for inoperable Primary Containment Isolation Valves (PCIVs). While these measures are not specifically discussed in the Standard Review Plan (SRP), the SRP does provide specific criteria necessary to meet the relevant requirements of the regulations and provides guidelines for acceptable alternate containment isolation provisions.Section II,
'Acceptance Criteria," item g states, "Relief valves may be used as isolation valves provided the relief setpoint is greater than 1.5 times the containment design pressure." The proposed change will allow relief valves that meet this criterion to be used to preserve the containment boundary function in accordance with the intent of the Technical Specification Required Actions.
5.2 No Significant Hazards Consideration Entergy proposes to amend the Grand Gulf Technical Specifications (TS) concerning the Required Actions to be taken for inoperable Primary Containment Isolation Valves (PCIVs).
The current TS Required Actions specify that the affected penetration flow path must be isolated by one or more of the following methods: closed and deactivated automatic valves, closed manual valves, blind flanges, and check valves with flow through the valve secured.
The proposed change adds closed relief valves as another acceptable means of isolating the flow path provided that the relief setpoint is greateT than 1.5 times containment design pressure.
Entergy Operations, Inc. has evaluated whether or not a significant hazards consideration is involved with the proposed amendment(s) by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
Primary Containment Isolation Valves (PCIVs) are accident mitigating features designed to limit releases from the containment following an accident. The Technical Specifications (TS) specify actions to be taken to preserve the containment isolation function if a PCIV is inoperable. These actions include isolating the penetration flow path by specific methods. The proposed TS change adds closed relief valves with acceptable relief setpoints as another method to isolate the penetration flowpath. The use of relief valves with relief setpoints greater than 1.5 times the containment design pressure meets the Standard Review Plan options for acceptable isolation devices.
This relief setpoint provides sufficient margin to minimize the potential for premature opening due to containment post-accident pressures. The proposed change does not affect any initiators to accidents previously evaluated.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
Attachment I to . ,
GNRO-2005/00038 Page 5 of 6
- 2. Does the proposed change create the possibility of a. new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change does not introduce any new modes of plant operation or adversely affect the design function or operation of safety features. The proposed TS change allows use of existing plant equipment as compensatory measures to maintain the containment isolation design intent when the normal isolation features are inoperable. Since relief valves used for this purpose will not be disabled by blind flanges, the system piping overpressure protection design feature will also be preserved.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
The safety margin associated with this change is that associated with preserving the containment integrity. NUREG-0800, the Standard Review Plan, recognizes that relief valves with relief setpoints greater than 1.5 times containment design pressure are acceptable as containment isolation devices. Closed relief valves with relief setpoints of this margin provide an isolation alternative that is less susceptible to a single failure (i.e., inadvertent opening) yet still preserves the overpressure protection that the component was intended to provide.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, Entergy concludes that the proposed amendment(s) present no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
5.3 Environmental Considerations The proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
,fn.;,-, oe Attachment I to*
GNRO-2005/00038 Page 6 of 6 6.0 PRECEDENCE, .tii.
The industry previously submitted a generic request to allow use of any ASME/ANSI approved equivalent devices for isolating a penetration flow path. The intent of the proposed change was to provide flexibility in the type of closure mechanism used to meet the TS Required Action. TSTF-196, 'Revise isolation devices to include ASME/ANSI equivalent methods," was submitted to the NRC staff for review in March 1997. The NRC rejected that request by letter dated October 1,1997 (Reference 1). The premise of the decision to reject the proposed TSTF was that, while the NRC staff had previously found some equivalent methods acceptable, such as temporary sealants for certain non-pressure barrier applications, the staff had not reviewed specific ASME/ANSI equivalent methods where containment pressurization could occur.
The NRC staff's basis for rejecting TSTF-196 is not applicable to Entergy's proposed change.
Entergy's proposed change is consistent with an ASME/ANSI method that the NRC staff has previously found acceptable as a pressure barrier for containment isolation. The Standard Review Plan, NUREG-0800 recognizes the use of a relief valve as an acceptable containment isolation device.
NUREG-0800 Section 6.2.4 states in part, "Specific criteria necessary to meet the relevant requirements of the regulations...and guidelines for acceptable alternate containment isolation provisions for certain classes of lines are as follows... g. Relief valves may be used as isolation valves provided the relief setpoint is greater than 1.5 times the containment design pressure.'
7.0 REFERENCE
- 1. Letter from Mr. William D. Beckner, USNRC, to Mr. James Davis, Nuclear Energy Institute, dated October 1, 1997.
Attachment 2 GNRO-2005/00038 Proposed Technical Specification Changes (mark-up) to GNRO-2005/00038 Page 1 of 2 PCIVs 3.6.1.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.I Isolate the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> except penetratiun fluw paths penetration nfow path ror main steam with one PCIV by use of at least line inoperable except due one closed and to leakage not within de-activated AND limit. automfatic Valve, closed manual x.alve, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for main blind flangej~w steam line
,or closedrlevae check valve wimiflow with relief seton through the valve secured,
.greater than 1.ime AND A.2 --------NOTE-------- Once per 31 days Isolation devices in for isolation high radiation areas devices outside may be verified by primary use of administrative containment, means. drywell, and steam tunnel Verify the affected penetration flow path is isolated. Prior to entering MODE 2 or 3 from MOOD 4, if not performed within the previous 92 days, for isolation devices inside primary containment, drywell, or steam tunnel (continued)
GRAND GULF 3.6-10 Amendment No. 120 to GNRO-2005/00038 Page 2 of 2 PCIVs 3.6.1.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME
- 8. One or more B.I Isolate the affected I hour penetration flow paths penetration flow path , or closed relief valv with two PCIVs by use of at least inoperable except due one closed and with relief setpoint to leakage not within de-activated greater than 1.5 times limit. automatic valve, containment design closed manual valve, prssre 1 blind fl angep.-*-'
C. One or more C.1 Restore leakage rate 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetration flow paths to within limit.
with leakage rate not within limit except for purge valve leakage.
(continued)
GRAND GULF 3.6-11 Amendment No. 120
%V Attachment 3 GNRO-2005/00038 Changes to Technical Specification Bases Pages For Information Only to GNRO-2005/00038 Page 1 of 3 PCIVs E 3.6.1.3 BASES ACTIONS operator at the controls of the valve, who is in continuous (continued) communication with the control room. In this way, the penetration can be rapidly isolated when a need for primary containment isolation is indicated.
A second Note has been added to provide clarification that, for the purpose of this LCO, separate Condition entry is allowed for each penetration flow path. This is acceptable, since the Required Actions for each Condition provide appropriate compensatory actions for each inoperable PCIV.
Complying with the Required Actions may allow for continued operation, and subsequent inoperable PCIVs are governed by subsequent Condition entry and application of associated Required Actions.
The ACTIONS are modified by Notes 3 and 4. These Notes ensure appropriate remedial actions are taken, if necessary, if the affected system(s) are rendered inoperable by an inoperable PCIV (e.g., an Emergency Core Cooling System subsystem is inoperable due to a failed open test return valve, or when the primary containment leakage limits are exceeded). Pursuant to LCO 3.0.6, these ACTIONS are not required even when the associated LCO is not met.
Therefore, Notes 3 and 4 are added to require the proper actions to be taken.
A.1 and A.2 With one or more penetration flow paths with one PCIV inoperable except for inoperability due to leakage not within a limit specified in an SR to this CO. the affected penetration f low Pudh m stt on isolatedOfme n or anc patuie the lse of ateas one olation bprrimr that inot be rsely a cted by sincle a ve faithin e4h on bComleio thTimeet this o terion ste a It Hoe nd -actv ed dutum XcValv e, Oposed m ual d /valv t fow krough e,Jkbali fne,
,~___-__ ( secupfid,/or penet atfions isolatedin crdc
{ \ INERT1 w~t~Icrli~~iRon .1, the device used to isolate the penetration should be LIhe closest one available to the primary containment. The Required Action must be completed within the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> ComplebIon Time (E hours for main steam lines). The specified time period of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is reasonable considering the time required to isolate the penetration and the relative importance of supporting primary containment GRAND GULF 8 3.6 17 LOC 99054
Attachment 3 to GNRO-2005/00038 Page 2 of 3 PCIVs a 3.6.1.3 BASES ACTIONS A.I and A.2 (continued) periodic basis. This is necessary to ensure that primary containment penetrations required to be isolated following an accident, and no longer capable of being automatically isolated, will be isolated should an event occur. This Required Action does not require any testing or device manipulation. Rather, it involves verification that those devices outside primary containment. drywell, and steam tunnel and capable of being mispositioned are in the correct position. The Completion Time for this verification of "once per 31 days for isolation devices outside primary containment, drywell, and steam tunnel,- is appropriate because the devices are operated under administrative controls and the probability of their misalignment is low.
For devices inside primary containment, drywell, or steam tunnel, the specified time period of 'prior to entering MODE 2 or 3 from MODE 4. if not performed within the previous 92 days," is based on engineering Judgment and is considered reasonable in view of the inaccessibility of the devices and the existence of other administrative controls ensuring that device misalignment Is an unlikely possibility.
Required Action A.2 is modified by a Note that applies to isolation devices located in high radiation areas and allows them to be verified by use of administrative means.
Allowing verification by administrative means is considered acceptable, since access to these areas is typically restricted. Therefore, the probability of misalignment:
once they have been verified to be in the proper position, is low.
With one or more penetration flow paths with two PCIVs inoperable except due to leakage not within limits, either the inoperable PCIVs must be restored to OPERABLE status or the affec d enetration flow path must b isolated within our b method of isolation 75ust incluptth-e-use of at~
leaston Psolation bVrrier tha, Ycannot b aedversely/
bya snglactve ylPure. Isp lt on bera ir affcte tha~fet hiscrkeron artta closed ^dde-acti zted /
Gi out ~natic Valve, I hour orpletlon LCO 3.6.1t1.
closed iinua vllva and a b nd flange me is consistent with the AC of
-(continued)
GRAND GULF B 3.6.18 LOC 99067 to GNRO-2005/00038 Page 3 of 3 BASES INSERTS INSERT I Acceptable methods of isolation that are not adversely affected by a single active failure include: a closed and deactivated automatic isolation valve, a closed manual valve, a blind flange, and a check valve with flow through the valve secured. In addition, closed relief valves with relief setpoints greater than 1.5 times containment design pressure are also acceptable isolation devices.
INSERT 2 Acceptable methods of isolation that are not adversely affected by a single active failure include: a closed and deactivated automatic isolation valve, a closed manual valve, and a blind flange. In addition, closed relief valves with relief setpoints greater than 1.5 times containment design pressure are also acceptable isolation devices.