Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24128A0427 May 2024License Amendment Request to Remove Obsolete License ConditionsInternal Flooding
Probabilistic Risk Assessment
Scram Discharge Volume
License Renewal
Fire Protection Program
Flow Induced Vibration
Overspeed trip
ML24116A03725 April 2024Report of Technical Specification Bases ChangesSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Post Accident Monitoring
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Squib
Incorporated by reference
High Energy Line Break
Missed surveillance
Abnormal operational transient
Surveillance Frequency Control Program
Scram Discharge Volume
Feedwater Controller Failure
Overtravel
Turbine Missile
Fuel cladding
Recently irradiated fuel
Power change
Manual Operator Action
GNF3
ML23208A21127 July 2023Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related DefinitionsShutdown Margin
Reactor Vessel Water Level
Packing leak
Water Inventory Control
Surveillance Frequency Control Program
Pressure Boundary Leakage
GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b6 June 2023License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Tornado Missile
Water Inventory Control
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Condition Adverse to Quality
FLEX
High Energy Line Break
Tornado-Generated Missile
Abnormal operational transient
Fukushima Dai-Ichi
Seismically rugged
Tornado Missile Protection
Surveillance Frequency Control Program
Scram Discharge Volume
Large early release frequency
Tornado Missile Risk Evaluator
Earthquake
Recently irradiated fuel
Offsite Circuit
Fire Protection Program
Subsequent actuation
Operational leakage
GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors6 June 2023Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ReactorsSafe Shutdown
High winds
Ultimate heat sink
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado-Generated Missile
Fukushima Dai-Ichi
Tornado Missile Protection
Surveillance Frequency Control Program
Large early release frequency
Tornado Missile Risk Evaluator
Seismic Walkdown Report
ML23033A0491 February 2023Emergency Action Level (EAL) Technical Bases Document Revision 3Safe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Cyber Security
FLEX
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Feedwater Heater
Scram Discharge Volume
Process Control Program
Safeguards Contingency Plan
Earthquake
Maintenance Rule Program
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Grace period
Unidentified leakage
ML21279A2316 October 2021Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item ImprovementShutdown Margin
Packing leak
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Intergranular Stress Corrosion Cracking
Process Control Program
Pressure Boundary Leakage
Unidentified leakage
Operational leakage
ML21266A16123 September 2021Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the ActuatedUltimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Operability Determination
Recently irradiated fuel
ML21062A1983 March 2021Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1Surveillance Frequency Control Program
ML20091M36331 March 2020Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate TestSafe Shutdown
High winds
Mission time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Coatings
Incorporated by reference
FLEX
Aging Management
Tornado Generated Missile
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Local Leak Rate Testing
Foreign Material Exclusion
Large early release frequency
MELLLA
Integrated leak rate test
Spent Fuel Pool Instrumentation
Moisture barrier
License Renewal
Pandemic
COVID-19
Fuel cladding
Scaffolding
GOTHIC
Power Uprate
CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 126 February 2020Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1Safe Shutdown
Surveillance Frequency Control Program
GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies19 February 2020License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test FrequenciesSafe Shutdown
High winds
Mission time
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Coatings
Incorporated by reference
FLEX
Aging Management
Tornado Generated Missile
Fukushima Dai-Ichi
Surveillance Frequency Control Program
Local Leak Rate Testing
Foreign Material Exclusion
Large early release frequency
MELLLA
Integrated leak rate test
Spent Fuel Pool Instrumentation
Moisture barrier
License Renewal
Fuel cladding
Scaffolding
GOTHIC
Power Uprate
CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process24 January 2020Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement ProcessHydrostatic
Surveillance Frequency Control Program
CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 224 January 2020Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2Safe Shutdown
Offsite Circuit
Backfit
GNRO-2019/00045, Emergency Plan, Revision 7929 October 2019Emergency Plan, Revision 79
GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.13 June 2019Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.Grace period
ML19072A28113 March 2019Supplement 1 to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory ControlWater Inventory Control
CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 27 March 2019Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2Reactor Vessel Water Level
Anticipated operational occurrence
Surveillance Frequency Control Program
Minimum Critical Power Ratio
Annual Radiological Environmental Operating Report
Process Control Program
Fuel cladding
CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 431 January 2019Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4Safe Shutdown
Time of Discovery
Incorporated by reference
Missed surveillance
Offsite Circuit
GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation23 January 2019Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) InstrumentationShutdown Margin
Anticipated operational occurrence
High Energy Line Break
Abnormal operational transient
Fuel cladding
Grace period
GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control23 October 2018Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory ControlStroke time
Water Inventory Control
GNRO-2018/00029, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)7 June 2018Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)Mission time
Internal Flooding
Probabilistic Risk Assessment
GOTHIC
Power Uprate
GNRO-2018/00008, (GGNS) - License Amendment Request: Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 627 April 2018(GGNS) - License Amendment Request: Adoption of Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6
GNRO-2018/00013, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)12 April 2018Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TSTF-425)
GNRO-2018/00007, Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.10 April 2018Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control.Reactor Vessel Water Level
Stroke time
Water Inventory Control
Hydrostatic
Operating Basis Earthquake
Qualified Offsite Circuit
Surveillance Frequency Control Program
Power Operated Valves
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Scaffolding
Water hammer
GNRO-2017/00061, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis3 November 2017License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing BasisSafe Shutdown
High winds
Mission time
Tornado Missile
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
FLEX
Tornado-Generated Missile
Tornado Generated Missile
Tornado Missile Protection
Large early release frequency
TORMIS
Tornado Missile Risk Evaluator
Earthquake
Turbine Missile
GOTHIC
Power Uprate
Failure to Scram
ML17268A21321 September 2017ISFSI, River Bend Station Unit 1 & ISFSI, Waterford 3 Steam Electric Station & ISFSI, Grand Gulf Nuclear Station & ISFSI, Application for Order Approving Transfers of Licenses and Conforming License Amendments
CNRO-2017-00005, and Isfsl - License Amendment Request for Administrative Change to Licensee Name29 March 2017and Isfsl - License Amendment Request for Administrative Change to Licensee Name
GNRO-2016/00062, License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass29 December 2016License Amendment Request (LAR) for One Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell BypassCoatings
Incorporated by reference
Aging Management
Local Leak Rate Testing
Large early release frequency
MELLLA
Integrated leak rate test
Moisture barrier
Scaffolding
Power Uprate
GNRO-2016/00051, Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System..26 October 2016Application to Revise the Technical Specifications to Allow the Adoption of Technical Specification Task Force Traveler TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System..Fire Barrier
Tornado Missile
Internal Flooding
Incorporated by reference
High Energy Line Break
Turbine Missile
GNRO-2016/00034, License Renewal Documents to Support Review of Application for Renewal10 October 2016License Renewal Documents to Support Review of Application for RenewalStress corrosion cracking
License Renewal
Power Uprate
Affidavit
GNRO-2015/00087, Supplemental Letter to Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing to Provide Relief Request in Format Requested By..2 December 2015Supplemental Letter to Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing to Provide Relief Request in Format Requested By..Grace period
GNRO-2015/00037, Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing15 September 2015Application to Revise the Technical Specifications to Remove the Inservice Testing Program and to Clarify SR Usage Rule Application to Section 5.5 Testing
GNRO-2015/00029, License Amendment Request - Cyber Security Plan Implementation29 June 2015License Amendment Request - Cyber Security Plan ImplementationCyber Security
GNRO-2015/00038, Response to Request for Additional Information Regarding Fluence License Amendment Request, Request for Commitment11 June 2015Response to Request for Additional Information Regarding Fluence License Amendment Request, Request for CommitmentLicense Renewal
GNRO-2015/00026, Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace Intervals27 May 2015Application to Revise Technical Specifications for Permanent Extension of Type C Leak Rate Testing Frequency and Reduction of Type B and C Grace IntervalsAging Management
Local Leak Rate Testing
Integrated leak rate test
Grace period
Power Uprate
GNRO-2014/00078, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month15 December 2014Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month
GNRO-2014/00014, License Amendment Request for Revision of Five Technical Specification Allowable Value Setpoints1 August 2014License Amendment Request for Revision of Five Technical Specification Allowable Value SetpointsFunctionality Assessment
Operability Determination
GOTHIC
GNRO-2013/00090, License Amendment Request - Cyber Security Plan Implementation Schedule19 December 2013License Amendment Request - Cyber Security Plan Implementation ScheduleCyber Security
GNRO-2013/00067, LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel..8 November 2013LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel..Shutdown Margin
Incorporated by reference
CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments16 April 2013Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP AmendmentsFlow Induced Vibration
GNRO-2012/00132, License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low.9 November 2012License Amendment Request for Revision of Technical Specification Allowable Value for Primary Containment and Drywell Isolation Instrumentation Function 3.c RCIC Steam Supply Line Pressure - Low.Safe Shutdown
Safe Shutdown Earthquake
Post Accident Monitoring
Emergency Lighting
Functionality Assessment
High Energy Line Break
Operability Determination
Earthquake
Grace period
GOTHIC
GNRO-2012/00125, Final Feedwater Temperature Reduction License Amendment Request26 October 2012Final Feedwater Temperature Reduction License Amendment RequestSafety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
High Energy Line Break
Feedwater Heater
Feedwater Controller Failure
MELLLA
Power Uprate
Affidavit
GNRO-2012/00096, License Amendment Request for Implementing a 24-Month Fuel Cycle, Grand Gulf Nuclear Station, Unit 12 October 2012License Amendment Request for Implementing a 24-Month Fuel Cycle, Grand Gulf Nuclear Station, Unit 1Safe Shutdown
High Radiation Area
Ultimate heat sink
Scram Discharge Volume
Maintenance Rule Program
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Grace period
Overspeed trip
GNRO-2012/00102, Request to Revise the Standby Service Water Passive Failure Methodology14 September 2012Request to Revise the Standby Service Water Passive Failure MethodologyUltimate heat sink
Internal Flooding
Probabilistic Risk Assessment
Through-Wall Leak
ML12157A17923 May 2012Attachment 6 to GNRO-2012/00039 - Entergy Nuclear Grand Gulf Nuclear Station License Renewal Environmental Audit - Hydrology Patton - Attachment I Labeled GGNS NPDES Permit Renewal Application (2007)Grab sample
License Renewal
GNRO-2012/00001, License Amendment Request - Standby Liquid Control System23 January 2012License Amendment Request - Standby Liquid Control SystemShutdown Margin
Anticipated operational occurrence
Squib
Power Uprate
ML11308A47128 October 2011Applicant'S Environmental Report, Operating License Renewal Stage, Attachment C - Clean Water Act Documentation, Part 2 of 4
ML11308A09528 October 2011License Renewal Application Technical Information - Appendix a - Updated Final Safety Analysis Report SupplementFire Barrier
Anticipated operational occurrence
Coatings
Condition Adverse to Quality
High Energy Line Break
Aging Management
Stress corrosion cracking
Integrated leak rate test
License Renewal
Earthquake
Fire Protection Program
Power Uprate
ML11308A09828 October 2011License Renewal Application Technical Information - Appendix C - Response to BWRVIP Applicant Action ItemsAging Management
License Renewal