CNRO-2017-00005, and Isfsl - License Amendment Request for Administrative Change to Licensee Name

From kanterella
Jump to navigation Jump to search

and Isfsl - License Amendment Request for Administrative Change to Licensee Name
ML17093A729
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 03/29/2017
From: Ford B
Entergy Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
CAC MF9588, CNRO-2017-00005
Download: ML17093A729 (18)


Text

En tergy csysy Inc.

Bryan S. Ford Senior Manager, Fleet Regulatory Assurance CNRO-201 7-00005 March 29, 2017 10 CFR 50.90 Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North 1 1 555 Rockville Pike Rockville, MD 20852

Subject:

Entergy Operations, Inc.

Grand Gulf Nuclear Station & ISFSl Docket Nos. 50-41 6 & 72-50 License Amendment Request for Administrative Change to Licensee Name

Dear Sir or Madam:

Pursuant to Section 1 87 of the Atomic Energy Act of 1 954, as amended (the Act), and 1 0 CFR 50.90, Entergy Operations, Inc. (EOI), acting on behalf of itself and the owner licensees of Grand Gulf Nuclear Station (Grand Gulf), System Energy Resources, Inc. and Cooperative Energy, a Mississippi electric cooperative (formerly known as South Mississippi Electric Power Association) (collectively, the Applicants), hereby request that the NRC issue an Order approving proposed changes to the Facility Operating and Independent Spent Fuel Storage Installation Licenses for Grand Gulf, and conforming license amendments.

Effective November 1 0, 201 6, South Mississippi Electric Power Association changed its company name from South Mississippi Electric Power Association to Cooperative Energy, a Mississippi electric cooperative. The corporate name was changed for commercial reasons.

The changes proposed herein to the Grand Gulf operating license solely reflects the changed licensee name. This name change is purely administrative in nature. This request does not involve a transfer of control over or of an interest in the license. provides a detailed description of the proposed license changes, a technical analysis of the proposed changes, a determination that the proposed changes do not involve a significant hazard consideration, a regulatory analysis of the proposed changes, and an environmental evaluation. Attachment 2 provides a copy of the certificate of amendment for the name change filed with the office of the Mississippi Secretary of State. Attachment 3 provides markups of the affected pages of the Grand Gulf operating license. Attachment 4 provides a clean copy of the affected pages of the Grand Gulf operating license, as amended.

EOl requests approval of the proposed license amendment by April 1 201 8. This date is administrative in nature, and is not required to support any plant activity. Once approved, the

CNRO-201 7-00005 Page 2 of 2 amendment shall be mplemented within 90 days following issuance of the amendment.

In accordance with 1 0 CFR 50.91 (b), EQI is providing the State of Mississippi with a copy of this proposed amendment.

This letter contains no new or revised regulatory commitments.

If NRC requires additional information concerning this internal reorganization, please contact me at (601) 368-5516.

Sincerely, BSF/ljs  : License Amendment Request for Administrative Change to Licensee Name : Certificate of Amendment filed with Mississippi Secretary of State : Markup of Affected Pages of the Grand Gulf Operating License : Clean Copy of Affected Pages of the Grand Gulf Operating License cc: U.S. Nuclear Regulatory Commission ATTN: Ms. Margaret Watford Mail Stop OWFN/8 H4A 1 1 555 Rockville Pike Rockville, MD 20852-2738 U.S. Nuclear Regulatory Commission ATTN: Mr. Kriss M. Kennedy Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Mr. B. J. Smith Director, Division of Radiological Health Mississippi State Department of Health Division of Radiological Health 3150 Lawson Street Jackson, MS 39213 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

Entergy Operations, Inc. ) Docket Nos.

)

Grand Gulf Nuclear Station & ISFSI ) 50-41 6 & 72-50

)

AFFI RMATION I, Bryan S. Ford, being duly sworn, hereby depose and state that I am Senior Manager, Fleet Regulatory Assurance; that I am duly authorized to sign and file with the Nuclear Regulatory Commission the attached application for order approving a license amendment request for the administrative change to licensee name and conforming license amendments; that I am familiar with the content thereof; and that the matters set forth therein are true and correct to the best of my knowledge and belief.

BrFor Senior Manager, Fleet Regulatory Assurance State of 1ss S S :j7 (2 L Countyof -ic-Subscribed and sworn to me, a Notary Public, in and for the State of 1 PP this day of March, 2017.

/e Q1

/ t\ 1,%cW U 1

cI+ Notary Public in and for the State of (SSSSp
c ID#49487 *....

AMYA%BLAYLOCK

CNRO-201 7-00005 Attachment 1 Page 1 of 5 ATTACHMENT 1 GRAND GULF NUCLEAR STATION CNRO-201 7-00005 LICENSE AMENDMENT REQUEST FOR ADMINISTRATIVE CHANGE TO LICENSEE NAME

CNRO-201 7-00005 Attachment 1 Page 2 of 5 LICENSE AMENDMENT REQUEST FOR ADMINSTRATIVE CHANGE TO LICENSEE NAME I. DESCRIPTION Pursuantto Section 187 ofthe Atomic Energy Act of 1954, as amended (the Act), and 10 CFR 50.90, Entergy Operations, Inc. (EOI), acting on behalf of itself and the owner licensees of Grand Gulf Nuclear Station (Grand Gulf), System Energy Resources, Inc. and Cooperative Energy, a Mississippi electric cooperative (formerly known as South Mississippi Electric Power Association) (collectively, the Applicants), hereby request that the NRC issue an Order approving proposed changes to the Facility Operating and Independent Spent Fuel Storage Installation Licenses for Grand Gulf, and conforming license amendments. System Energy Resources, Inc. owns an undivided 90 percent interest in the Grand Gulf nuclear plant, and Cooperative Energy owns an undivided interest in the remaining 1 0 percent.

Effective November 1 0, 201 6, South Mississippi Electric Power Association changed its company name from South Mississippi Electric Power Association to Cooperative Energy, a Mississippi electric cooperative. The corporate form, state of incorporation, and the identity of the officers and directors, did not change as a result of the name change. A copy of the certificate of amendment that South Mississippi Electric Power Association filed with the Mississippi Secretary of State is provided as Attachment 2. The corporate name was changed for commercial reasons. The changes proposed herein to the Grand Gulf operating license solely reflect the changed licensee name. This name change is purely administrative in nature.

This request does not involve a transfer of control over or of an interest in the license. No changes to the Grand Gulf Technical Specifications are requested.

II. PROPOSED LICENSE CHANGES The proposed changes to the Grand Gulf license will replace references to South Mississippi Electric Power Association with Cooperative Energy, a Mississippi cooperative, or Cooperative Energy, as appropriate. Attachment 3 provides marked up copies of the affected pages of the Grand Gulf license, and Attachment 4 provides clean copies of those same pages.

III. TECHNICAL ANALYSIS The proposed amendments are purely administrative in nature. No physical changes will be made as a result of this name change, and there will be no changes to the operations of Grand Gulf. There will be no changes to the technical capabilities, financial qualifications, rights or obligations of EOI, System Energy Resources, Inc., or Cooperative Energy, a Mississippi cooperative (formerly known as South Mississippi Electric Power Association) as a result of the name change. EOI will continue as the licensed operator of Grand Gulf, and all of the licensees financial responsibilities for Grand Gulf, and their sources of funds to support the plant, will remain the same. Any necessary changes to Grand Gulf site documents will be administrative in nature.

CNRO-201 7-00005 Attachment 1 Page 3 of 5 Iv. REGULATORY ANALYSIS The proposed amendments to the Grand Gulf license are being submitted to the NRC pursuant to 1 0 CFR 50.90. The amendment request is being submitted only for the purpose of updating the affected license documents to reflect a name change to South Mississippi Electric Power Association.

IV.(a) No Significant Hazards Determination The licensees have evaluated whether or not a significant hazards consideration is involved with the proposed amendments by addressing the three standards setforth in 10 CFR 50.92(c),

Issuance of amendment, as discussed below:

1 Do the proposed changes involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed amendments simply change the name of a licensee. The name change is purely administrative. None of the functions or responsibility of any of the Grand Gulf licensees will change as a result of the amendments. The proposed amendments do not alter the design, function, or operation of any plant equipment. As such, the accident and transient analyses contained in the facility updated final safety analysis report will not be affected. Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Do the proposed changes create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The proposed amendments simply change the name of a licensee. The proposed name change is purely administrative. None of the functions or responsibility of any of the Grand Gulf licensees will change as a result of the amendments. The proposed amendments do not alter the design, function, or operation of any plant equipment. As such, the accident and transient analyses contained in the facility updated final safety analysis report will not be affected. Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Do the proposed changes involve a significant reduction in the margin of safety?

Response: No.

The proposed amendments simply change the name of a licensee. The name change is purely administrative. None of the functions or responsibility of any of the Grand Gulf licensees will change as a result of the amendments. The proposed amendments do not alter the design, function, or operation of any plant equipment. As such, the accident and transient analyses contained in the facility updated final safety analysis report will not be affected. Therefore, the proposed changes do not involve a significant reduction in the margin of safety.

CNRO-201 7-00005 Attachment 1 Page 4 of 5 Based on the above evaluations, the licensees conclude that the proposed amendments present no significant hazards under the standard set forth in 1 0 CFR 50.92(c) and, accordingly, a finding of no significant hazards determination is justified.

IV.(b) Applicable Regulatory Requirements/Criteria The proposed amendment is administrative in nature and involves a corporate name change only. This request is being submitted to the NRC pursuant to 1 0 CFR 50.90 only for the purpose of updating the affected portions of the Grand Gulf operating license. The proposed change does not alter any technical content of the Grand Gulf facility operating license or any technical content of the Technical Specifications requirements, nor does it have any effect on the Quality Assurance Program description. The corporate status of none of the Grand Gulf licenses has changed.

Under 1 0 CFR 50.80, Transfer of licenses, no license or control of a license for a utilization facility may be transferred, directly or indirectly, to any entity unless the NRC consents in writing. However, licensee name changes do not, by themselves, constitute license transfers.

The proposed amendment is purely a name change and does not involve the transfer of any control over the Grand Gulf facility operating license to another entity. There is not a transfer of a license or of an interest in a license within the meaning of 10 CFR 50.80. Standard NRC guidance on this subject is contained in the Standard Review Plan on Power Reactor Licensee Financial Qualifications and Decommissioning Funding Assurance (NUREG-1577, Rev. 1 (1 999)) which states, in connection with review of applications for license transfers: The reviewer should treat applications involving changes of ownership, mergers, formation of holding companies, and other restructuring proposals that go beyond corporate name changes or internal reorganizations as potential transfers of licenses, directly or indirectly, through transfer of control of the license, as subject to section 50.80 review, and not merely subject to a section 50.90 license amendment review. . . . (A name change of a licensee that does not involve license transfer considerations under section 50.80 will be effected by a license amendment issued administratively under section 50.90.)

In conclusion, based on the discussion in the above sections, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

V. ENVIRONMENTAL CONSIDERATION The proposed license amendments only change the licensee name and will not result in any change in the types, or any increase in the amounts, of any effluents that may be released off-site, and will not cause any increase in individual or cumulative occupational radiation exposure.

Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion from environmental assessments or environmental impact statements set forth in 1 0 CFR 51 .22(c)(1 0)(iii) (exempting any license amendment that only Changes the licensees or permit holders name, phone number, business or e-mail address). Therefore, pursuant to 1 0 CFR 51 .22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.

CNRO-201 7-00005 Attachment 1 Page 5 of 5 Iv. PRECEDENTS This application is consistent with previous NRC actions in similar circumstances not involving transfers of ownership or control, as follows:

By letter dated April 17, 2009, NextEra Energy submitted an amendment request to the NRC for the Duane Arnold Energy Center to change the name FPL Energy Duane Arnold, LLC to NextEra Energy Duane Arnold, LLC (Accession No. ML091180401). The proposed amendment indicated it was an administrative change. The NRC approved the amendment on November 13, 2009 (Accession No. ML093030113).

By letter dated April 17, 2009, NextEra Energy submitted an amendment request to the NRC for the Point Beach Nuclear Plants, Units 1 and 2, to change the name FPL Energy Point Beach, LLC to NextEra Energy Point Beach, LLC (Accession No. ML091070535). The proposed amendment indicated it was an administrative change. The NRC approved the amendment on May 13, 2010 (Accession No. ML093070509).

By letter dated September 20, 201 1 FirstEnergy Nuclear Operating Company submitted an amendment request to the NRC for Beaver Valley Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1 and Perry Nuclear Power Plant, Unit 1 to change the company name to FirstEnergy Nuclear Generation, LLC (Accession No. ML112640246). The proposed amendment indicated it was an administrative change. The NRC approved the amendment on October 2, 2012 (Accession No. ML12221A413).

By letter dated December 21, 2012, DTE Energy Company submitted an amendment request to the NRC for Enrico Fermi Atomic Power Plant, Unit 1 to change the company name to DTE Electric Company (Accession No. ML10332A037). The proposed amendment indicated it was an administrative change. The NRC approved the amendment on August 8, 2013 (Accession No. ML13204A123).

CNRO-201 7-00005 Attachment 2 Pagel ot4 ATTACHMENT 2 GRAND GULF NUCLEAR STATION CNRO-201 7-00005 LICENSE AMENDMENT REQUEST FOR ADMINISTRATIVE CHANGE TO LICENSEE NAME Certificate of Amendment filed with Mississippi Secretary of State (4 pages, including cover)

CNRO-201 7-00005 Attachment 2 Page 2 of 4 F0012 2016261574 Business ID: 402243 Fee: $ 50 filed: 11/09/2016 12:23 PM C, Delbert Hosemann, Jr.

Secretary of State DELBERT HOSEMANN Secretary of State P.O. BOX 136 TELEPHONE: (601) 359-1633 JACKSON, MS 39205-0136 Articles/Certificate of Amendment Business Details Business Name: SOUTH MISSISSIPPI ELECTRIC POWER Business ID: 402243 ASSOCIATION future Effective Date: 1 1110/2016 Current Business Name Business Name: SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION Amended Business Name Business Name: Cooperative Energy, a Mississippi electric cooperative Adoption and Approval Voting The amendment(s) was(were) adopted on 05/18/2016.

IZI The Incorporators.

Board of directors without member action and member action was not required.

Li The members pursuant to statute and the results of the voting on the amendment are attached. (The option to attach a file will be displayed on the next screen)

Signature By entering my name in the space provided, I certify that I am authorized to file this document on behalf of this entity, have examined the document and, to the best of my knowledge and belief, it is true, correct and complete as of this day 11/08/2016.

Name: Address:

James Compton 7037 Highway 49 North ChiefExeczttive Officer Hattiesburg, MS 39402

CNRO-201 7-00005 Attachment 2 Page 3 of 4 CERTIFICATE Of AMENDMENT TO ARTICLES Of INCORPORATION OF SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION This Certificate ofArnendment to the Articles ofincorporation ofSouth Mississippi Electric Power Association, a Mississippi not-for-profit corporation (the Company), prepared and executed in accordance with Mississippi Code Annotated Section 77-5-215 certifies and evidences the fol1ovng:

WHEREAS, a meeting of the Board of Directors of the Company was held on May IS.

2016, in Jackson. Mississippi at the Mississippi Electric Power Associations office; and WHEREAS, notice of such meeting of the Board of Directors was sent to the Companys members more than thirty (30) days prior to the date of the meeting and such notice set forth the date. time, location and purpose of the meeting and described the proposed amendment to the Companys articles of incorporation, namely chanQing the Companys name to Cooperative Energy, a Mississippi electric cooperative; and WHEREAS all members of the Companys Board of Directors were present at such meeting, as were representatives from all Members of the Company, and upon a proper motion the Board of Directors and all Members of the Company unanimously voted to change the name of the Company to Cooperative Energy, a Mississippi electric cooperative.

NOW, THEREFORE, the undersigned President and Secretary of the Company do hereby certify and affirm that they have been duly and properly authorized to amend the articles of incorporation to reflect the change in name ofthc Company, to execute this certificate and to file the

CNRO-201 7-00005 Attachment 2 Page 4 of 4 amendment, this certificate, and take any other action necessary to carry out the approved name change to Cooperative Energy, a Mississippi electric cooperative.

WITNESS THE SIGNATURES of the President and Secretary thereof, under authority given them by unanimous vote of the Board of Directors and Members in accordance with the law 1th on the day ofMay. 2016.

iid Secretary STATE OF MISSISSIPPI COUNTY Of FoRREST Bcfbre me. the undersigned Notary Public in and for said county, personally came and appeared James Compton. President. and Mack Mauldin. Secretary. who then and there stated on oath and acknowledged that they were acting for South Mississippi Electric Power Association and under specific authority conferred on them by the Board of Directors and Members thereof. they did execute and deliver the foregoing certificate and amendment.

IN FESFIMONY whereof, witness my signature and official seal this the %h day of

rLf;<;..
  • ._s **

qrJ {:Lbut*,

$Gfl I Notary Public

  • . ComIt$ *:&

2

.(oec

CNRO-201 7-000XX Attachment 3 Page 1 of 3 ATTACHMENT 3 GRAND GULF NUCLEAR STATION CNRO-201 7-00005 LICENSE AMENDMENT REQUEST FOR ADMINISTRATIVE CHANGE TO LICENSEE NAME Markup of Affected Pages of the Grand Gulf Operating License (3 pages, including cover)

CNRO-201 7-000XX Attachment 3 Page2of3 c

UNITED STATES NUCLEAR REGULATORY COMMISSION

IJffl1Fb WA5HNGTON, DC.

I IERGY OPERATIONS1 INC.

SYSTEM ENERGY RESOURCES . INC.

ENTERGY JIISSISSIPPt 1NC

\ [COOPERATIVE ENERGY, A MISSISSIPPI ELECTRIC DOCKET NO COOPERATIVE GRANILGULF NUCLEAR STATION. uNIT I FACILITY OPERATING 1IC1SE (nowrenarned CooperativeEnergy, aMississippielectric cooperattve (Cooperatwe En1 License No NPF-29

1. The Nuclear Regu1tory Commission (the Commission or the NRC) has found that : \

A The app3icatio\for icense ffld1y Mississippi Power & Light Company (MP&L), \(now rename4-htergy Mississippi, Inc.), for itself and Middle\South ngy, Inc., (now renamed System Energy Resources, Inc. (SE1)ánd South Mississippi Electric Power Association (SMEPA)1 as amended, (hereinafter referred to as the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B. Construction of the GrnU Gulf Nuclear Station, Unit 1 (the facility), has been substantially completed in conformity with Construction Permit No. CPPR11$ and the application, as amended, the provisions of the Act, and the regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Comission (except as exempted from compliance in Section 2.0.

below);

D. There is reasonable assurance: (1) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter 1 (except as exempted from compliance in Section 2.0. below);

Amendment No. 4,125

CNRO-201 7-000XX Attachment 3 Page 3 of 3

1. Entergy Operations, Inc. (EOI), is technically qualified to engage in the activities authorized by this operating license in accordance with the Commissions regulations set forth in 10 CFR Chapter I; F. The licensees have satisfied the applicable provisions of 10 CFR Part 140, UFinaflciaJ Protection Requirements and Indemnity Agreements,° of the Commissions regulations; ci. The issuance of this license will not be inimical to the common defense and security or to the health and safety of the public; H. After weighing the environmental, economic, technical, and other benefits of the facility against environmental and other costs and considering available alternatives, the issuance of Facility Operating License No. NPF-29, subject to the conditions for protection of the environment set forth in the Environmental Protection Plan attached as Appendix B, is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied; and I. The receipt, possession, and use of source, by-product and special nuclear material as authorized by this license will be in accordance with the Commissions regulations in 10 CER Parts 30, 40, and 70
2. Based on the foregoing findings regading this facility and pursuant to Connission Order CLI84-19, dated Oqtober 25, 1984, License NPF-13, as amended, is superseded by this Faciity Operating License NPF-29 which is hereby issued to Entergy Operatins, Inc., Entergy Mississippi, Inc.,

System Energy Resources, Inc., and uth 4+s4-ss4pp4El-ectr4 Pewei AssGciation to read as follows

[cooperative EnergjJ_

A. This license applies to the Grand Gulf Nuclear Station (GG$S),

Unit 1, a boiling water nuclear reactor and associated equtment (the facility), owned by System Energy Resources, Inc., and &&uth Mtss is-s%pp ETectr%cewerA-s&eei at ton and operated by Entergy Operations, Inc. The facility is located in Claiborne County, Mississippi, and is described in the licensees Final Safety Analysis Report, as supplemented and amended, and in the licensees Environmental Report, as supplemented and amended.

B. Subject to the conditions and requirements incorporated herein, the Commission hereby licenses:

(1) Entergy Operations, Inc. (EOI) pursuant to Section 103 of the Act and 10 CFR Part 50, to possess, use, and operate the facility at the designated location in Claiborne County, Mississippi, in accordance with the procedures and limitations set forth in this license; t 2) System Energy Resources Inc

, . , and oi4ss4ss4p4 Eec%r1c PowerAssGc4a1.4on to posse , but not operate, the facility at the designated location 1n Claiborne County, Mississippi, in accordance with the pocedures and limitations set forth in this license;\.i.ooperatjveEflergy 2 Amendment No. &&,L2

CNRO-201 7-00005 Attachment 4 Pagel of 3 ATTACHMENT 4 GRAND GULF NUCLEAR STATION CNRO-201 7-00005 LICENSE AMENDMENT REQUEST FOR ADMINISTRATIVE CHANGE TO LICENSEE NAME Clean Copy of Affected Pages of the Grand Gulf Operating License (3 pages, including cover)

CNRO-201 7-00005 Attachment 4 Page 2 of 3 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC. 20555 ENTERGY OPERATIONS, INC.

SYSTEM ENERGY RESOURCES, INC.

COOPERATIVE ENERGY, A MISSISSIPPI ELECTRIC COOPERATIVE ENTERGY MISSISSIPPI, INC.

DOCKET NO. 50416 GRAND GULF NUCLEAR STATION, UNIT 1 FACILITY OPERATING LICENSE License No. NPE29

1. The Nuclear Regulatory Cormitission (the Commission or the NRC) has found that:

A. The application for license filed by Mississippi Power & Light Company (MP&L), (now renamed Entergy Mississippi, Inc.), for itself and Middle South Energy, Inc., (now renamed System Energy Resources, Inc. (SERI)) and South Mississippi Electric Power Association (SMEPA) , (now renamed Cooperative Energy, a Mississippi electric cooperative (Cooperative Energy) ) , as amended, (hereinafter referred to as the licensees) complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions regulations set forth in 10 CFR Chapter I, and all required notifications to other agencies or bodies have been duly made; B. Construction of the Grand Gulf Nuclear Station, Unit 1 (the facility), has been substantially completed in conformity with Construction Permit No. CPPRl18 and the application, as amended, the provisions of the Act, and the regulations of the Commission; C. The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission (except as exempted from compliance in Section 2.D.

below);

D. There is reasonable assurance: (i) that the activities authorized by this operating license can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.0. below);

I Amendment No. 6, 44.

700005 Attachment 4 Page 3 of 3 E. Entergy Operatjo Inc. (EQI) +/-s tech011 qua1jf to engage in t activ it ie s iz ed by thj oPerat+/-rg 1+/-cense in author 0 accordance wi the Comrnjs s+/-0 regu3a0 set in 10 CFR Chapt I; F. The licensees have Satisfied th applicable PrOVIS+/-Ona of 10 CF Part ; ion quir05 and Indemnity fl3financjai Protect , Re Agree of the Comisaion regu1tj00 G. The ISsuance of thj license will not be inimical to the common defense and Security or to the health and safety of the g the H. After Weighin environm ent1 economic techni5i and other iti and Other costs and benefit5 of the facility against environmej i;g consider available alternative the issuance of Facility OPerating License NPF-29, Subject the conditions for Pro te ct io n of th e envi ro nm en t se t fo rt i i the Environment1 9 Plan Protectio attached as Apoendix B, is i accordance with 10 5

CFR Part 51 of the Commission, regul50 and all applicable 08 require0 ha ve be en satisf ie d . and I. The receipt, Possession and use of Source byproduct and special nuclear material as authorized by this license will be in 0

accordance with the Commis si0, regula in 10 CER Parts 30, 40, and 70 .

2. Based on the foregoing findings reaardirig thIs facil and pursuant to 0 Order CLI8419 ComJnissi dated October 25, 1984, License NPF_l3 amen de d, is superseded by this Facility OPerating License NPFg Which is hereby issued to Entergy Operations Inc., Entergy Miss51 y es v Energy to read as 3yst em E ne rg Resou rc In c. , an d Coopera.ti follows:

A. This license applies to the Grand Gulf Nuclear Station (GONE)

Unit i, a boiling Water nuclear reactor and associated eguipmj (the facility), OWned by SYstem Energy Resources, Inc., and Cooperatjv Energy and operated by Entergy OPeratI05, facility is located in Claiborne County Miss i

Inc.

and is The I described in the licensees tFinal Safety Anaiysi5 Report as supplemen ted an amended and in the licensees, Environment1 Report, supplemen ted and amended.

03 and reguire1

3. Subject to the condjt+/- incorporat ed herein, the Commission hereby licenses:

(1) Entergy Operations, Inc. (EOI) pursuant to Section 103 of the Act and io CFR Part 50, to P0sses use, and operate th facility at the designated location in Claiborne County pi, in accordance With the procedures and 1ississip ns set forth in this license; limitatio (2) System Energy Resources, Inc. , and Cooperatjv Energy to na POssess, but not Operate, the facility at che desig o n ne y s s i 1 in accordance locati in Claibor Count Mi With the Procedllres and limitati set forth in thls license.

A1nendie;t No. 6E, -i-.