GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 6 June 2023 | License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Safe Shutdown High winds Reactor Vessel Water Level High Radiation Area Ultimate heat sink Tornado Missile Water Inventory Control Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Condition Adverse to Quality FLEX Tornado-Generated Missile Abnormal operational transient Fukushima Dai-Ichi Seismically rugged Tornado Missile Protection Surveillance Frequency Control Program Scram Discharge Volume Large early release frequency Tornado Missile Risk Evaluator Earthquake Recently irradiated fuel Offsite Circuit Fire Protection Program |
GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | 6 June 2023 | Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Tornado-Generated Missile Fukushima Dai-Ichi Tornado Missile Protection Surveillance Frequency Control Program Large early release frequency Tornado Missile Risk Evaluator |
GNRO-2021/00037, 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 1 | 30 November 2021 | 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 1 | |
GNRO-2021/00017, Notification of Readiness for Supplemental Inspection | 22 June 2021 | Notification of Readiness for Supplemental Inspection | |
GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency | 1 June 2021 | Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency | Missed surveillance Power-Operated Valves |
GNRO-2021/00015, Annual Radioactive Effluent Release Report | 28 April 2021 | Annual Radioactive Effluent Release Report | High Radiation Area Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Tritium Power change |
GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 | 19 April 2021 | Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 | |
GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 | 13 April 2021 | Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 | |
GNRO-2020/00045, 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis | 16 December 2020 | 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis | |
GNRO-2020/00034, Notification of Spent Fuel Cask Use | 8 October 2020 | Notification of Spent Fuel Cask Use | |
GNRO-2020/00033, Response to NRC Integrated Inspection Report 05000416/2020002 | 10 September 2020 | Response to NRC Integrated Inspection Report 05000416/2020002 | Safe Shutdown |
GNRO-2020/00029, Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 2020 | 18 August 2020 | Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 2020 | |
GNRO-2020/00022, Report of Technical Specification Bases Changes | 21 July 2020 | Report of Technical Specification Bases Changes | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio High Radiation Area Stroke time Anticipated operational occurrence Water Inventory Control Hydrostatic Operating Basis Earthquake Squib Qualified Offsite Circuit Incorporated by reference Missed surveillance Surveillance Frequency Control Program Scram Discharge Volume Feedwater Controller Failure Battery sizing Power Operated Valves Fuel cladding Pressure Boundary Leakage Recently irradiated fuel Offsite Circuit Scaffolding |
GNRO-2020/00027, Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS) | 16 July 2020 | Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS) | Pressure and Temperature Limits Report MELLLA |
GNRO-2020/00023, Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies | 26 June 2020 | Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies | Surveillance Frequency Control Program |
GNRO-2020/00020, Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS) | 5 May 2020 | Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS) | Hydrostatic Pressure and Temperature Limits Report MELLLA |
GNRO-2020/00018, Annual Radiological Effluent Release Report | 30 April 2020 | Annual Radiological Effluent Release Report | High Radiation Area Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Tritium Power change |
GNRO-2020/00016, Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.2206 | 16 April 2020 | Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.2206 | |
GNRO-2020/00015, Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test | 7 April 2020 | Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test | Surveillance Frequency Control Program |
GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 2019 | 20 February 2020 | Spent Fuel Storage Radioactive Effluent Release Report for 2019 | Annual Radioactive Effluent Release Report |
GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies | 19 February 2020 | License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies | Safe Shutdown High winds Mission time Tornado Missile Internal Flooding Probabilistic Risk Assessment Coatings Incorporated by reference FLEX Aging Management Tornado Generated Missile Fukushima Dai-Ichi Surveillance Frequency Control Program Foreign Material Exclusion Large early release frequency MELLLA Spent Fuel Pool Instrumentation Moisture barrier Fuel cladding Scaffolding |
GNRO-2019/00052, Report of Changes and Errors to 10 CFR 50.46 Analysis | 13 December 2019 | Report of Changes and Errors to 10 CFR 50.46 Analysis | |
GNRO-2019/00051, Notification of Readiness of 92723 Inspection | 11 December 2019 | Notification of Readiness of 92723 Inspection | |
GNRO-2019/00045, Emergency Plan, Revision 79 | 29 October 2019 | Emergency Plan, Revision 79 | |
GNRO-2019/00037, Notification of Spent Fuel Cask Use | 20 September 2019 | Notification of Spent Fuel Cask Use | |
GNRO-2019/00036, Correction to Gnro 2019-00017 Emergency Plan Revision 78 | 8 August 2019 | Correction to Gnro 2019-00017 Emergency Plan Revision 78 | Fitness for Duty Health Physics Network Emergency Lighting Earthquake |
GNRO-2019/00027, Notification of Readiness of 95001 Supplemental Inspections | 3 July 2019 | Notification of Readiness of 95001 Supplemental Inspections | Power change |
GNRO-2019/00031, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report | 25 June 2019 | Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report | |
GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. | 13 June 2019 | Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. | Grace period |
GNRO-2019/00026, Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval | 6 May 2019 | Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval | Dissimilar Metal Weld |
GNRO-2019/00024, Annual Radioactive Effluent Release Report | 30 April 2019 | Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report |
GNRO-2019/00020, Annual Radiological Operating Report (AREOR) | 30 April 2019 | Annual Radiological Operating Report (AREOR) | Fukushima Dai-Ichi Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Earthquake Chernobyl |
GNRO-2019/00022, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 | 22 April 2019 | Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 | |
GNRO-2019/00017, Emergency Plan, Revision 78 | 14 March 2019 | Emergency Plan, Revision 78 | Fitness for Duty Health Physics Network Offsite Dose Calculation Manual Cyber Security Emergency Lighting FLEX Pressure and Temperature Limits Report Surveillance Frequency Control Program Process Control Program Earthquake Maintenance Rule Program Fire Protection Program Fire Watch |
GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval | 13 March 2019 | Snubber Testing Program for Fourth Inspection Interval | |
GNRO-2019/00012, Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program | 6 March 2019 | Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program | Reactor Vessel Water Level Probabilistic Risk Assessment Temporary Modification |
GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 2018 | 21 February 2019 | Spent Fuel Storage Radioactive Effluent Release Report for 2018 | Annual Radioactive Effluent Release Report |
GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation | 23 January 2019 | Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation | Shutdown Margin Anticipated operational occurrence Abnormal operational transient Fuel cladding Grace period |
GNRO-2018/00057, Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan | 4 December 2018 | Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan | |
GNRO-2018/00055, Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ... | 30 November 2018 | Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ... | Safe Shutdown Probabilistic Risk Assessment Surveillance Frequency Control Program Maintenance Rule Program |
GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval | 30 November 2018 | Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval | Nondestructive Examination VT-2 Liquid penetrant Pressure Boundary Leakage |
GNRO-2018/00052, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information | 24 October 2018 | License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information | Safe Shutdown High winds Ultimate heat sink Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Tornado Generated Missile Tornado Missile Protection Large early release frequency Tornado Missile Risk Evaluator Earthquake Scaffolding |
GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control | 23 October 2018 | Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control | Stroke time Water Inventory Control |
GNRO-2018/00046, Submittal of 2018 Report of Changes and Errors to 10CFR50.46 | 16 October 2018 | Submittal of 2018 Report of Changes and Errors to 10CFR50.46 | |
GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report | 16 October 2018 | Submittal of 2018 Inservice Inspection Summary Report | |
GNRO-2018/00048, Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 | 10 October 2018 | Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 | |
GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 1 | 18 September 2018 | Core Operating Limits Report Cycle 22, Revision 1 | MELLLA |
GNRO-2018/00043, Revised Offsite Dose Calculation Manual | 18 September 2018 | Revised Offsite Dose Calculation Manual | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
GNRO-2018/00039, Report of Technical Specification Bases Changes | 20 August 2018 | Report of Technical Specification Bases Changes | Shutdown Margin Reactor Vessel Water Level Probabilistic Risk Assessment Recently irradiated fuel |
GNRO-2018/00040, Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 2018 | 20 August 2018 | Report of 10CFR50.59 Evaluations and Commitment Change Evaluations - July 1, 2016 Through June 30, 2018 | Open Phase Condition |