ML062990442

From kanterella
Revision as of 00:15, 14 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Email: (NPA-PD-LR) RAIs from Audit by Danhoang & Erach
ML062990442
Person / Time
Site: Pilgrim
Issue date: 08/21/2006
From: Subbaratnam R
Office of New Reactors
To: Patel E
- No Known Affiliation
References
%dam200612, TAC MD2296
Download: ML062990442 (9)


Text

W-entHoward __RAIs fro--rn-Aud-it -byDanh o-a-nq & Erach Page 111 From: Ram Subbaratnam To: erachp@comcast.net Date: 8/21/2006 9:36:06 AM

Subject:

RAIs from Audit by Danhoang & Erach Erach:

Here is the RAI as it was issued.

Thanks.

Ram Subbaratnam PM Pilgrim LRA 415-1478 CCO: Dan Hoang; James Davis

00.001.TMP _P466 Page ý11 1

c:\temr\GW1OO~JO1 .TMP Mail Envelope Properties (44E9B6C6.98C:19:10294)

Subject:

RAIs from Audit by Danhoang & Erach Creation Date 8/21/2006 9:36:06 AM From: Ram Subbaratnam Created By: RXS2 @nrc.gov Recipients Action Date & Time comcast.net erachp (erachp@comcast.net) nrc.gov OWGWPOO3.HQGWDO01 JAD CC (James Davis) nrc.gov OWGWPO04.HQGWDO01 DVH CC (Dan Hoang)

Post Office Delivered Route Pending comcast.net OWGWPOO3.HQGWDO01 Pending nrc.gov OWGWPOO4.HQGWDO01 Pending nrc.gov Files Size Date & Time MESSAGE 546 8/21/2006 9:36:06A.LM EEEBSection3.6RAIsFinal.wpd 38073 8/18/2006 6:31:38 PM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes.

Priority: Standard ReplyRequested: No Return Notification: None Concealed

Subject:

No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened

August 14, 2006 Mr. Michael Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601-1839

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC MC9669)

Dear Mr. Kansler:

By letter dated January 25, 2006, Entergy Nuclear Operations, Inc. (Entergy or the applicant),

submitted an application pursuant to 10 CFR Part 54, to renew the operating license for Pilgrim Nuclear Power Station for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review. These relate to Section 3.5 Structures and Component Supports and 3.6 Electrical and Instrumentation and Control Systems.

These questions were discussed with a member of your staff, Bryan Ford, and a mutually agreeable date for this response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-1478 or e-mail RXS2@nrc.gov.

Sincerely, IRN Ram Subbaratnam, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Requests for Additional Information cc w/encl: See next page

ML062290474 C:\temp\EEEBSection3.6RAIsFinal.wpd OFFICE PM:RLRA:DLR LA::DLR BC:RLRA:DLR NAME RSubbaratnam IKing Llund (RAuluck)

DATE 8/ /06 8/ 14 /06 18/ 14 /06 Letter to Michael Kansler from Ram Subbaratnam dated August 14, 2006

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION (TAC MC9669)

HARD COPY DLR R/F E-MAIL:

JFair RWeisman AMurphy RPettis GGalletti DShum GBagchi SSmith (srs3)

SDuraiswamy YL (Renee) Li RidsNrrDIr RidsNrrDIrRIra RidsNrrDIrRIrb RidsNrrDe RidsNrrDci RidsNrreEemb

.RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff RSubbaratnam SHoffman JShea AWilliamson DNguyen Apaul Dhoang JDavis GWilson CAnderson, Region 1 WRaymond, Region 1 NSheehan, Region 1

Pilgrim Nuclear Power Station cc:

Regional Administrator, Region I Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety 475 Allendale Road One Ashburton Place King of Prussia, PA 19406-1415 Boston, MA 02108 Senior Resident Inspector Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission Management Agency Pilgrim Nuclear Power Station Attn: James Muckerheide Post Office Box 867 400 Worcester Road Plymouth, MA 02360 Framingham, MA 01702-5399 Chairman, Board of Selectmen Mr. William D. Meinert 11 Lincoln Street Nuclear Engineer Plymouth, MA 02360 Massachusetts Municipal Wholesale Electric Company Chairman P.O. Box 426 Nuclear Matters Committee Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street Mr. Michael A. Balduzzi Plymouth, MA 02360 Site Vice President Entergy Nuclear Operations, Inc.

Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Stephen J. Bethay Office of the Commissioner Director, Nuclear Safety Assurance Massachusetts Department of Entergy Nuclear Operations, Inc.

Environmental Protection Pilgrim Nuclear Power Station One Winter Street 600 Rocky Hill Road Boston, MA 02108 Plymouth, MA 02360-5508 Office of the Attorney General Mr. Bryan S. Ford One Ashburton Place Manager, Licensing 20th Floor Entergy Nuclear Operations, Inc.

Boston, MA 02108 Pilgrim Nuclear Power Station 600 Rocky Hill Road Director, Radiation Control Program Plymouth, MA 02360-5508 Commonwealth of Massachusetts Executive Offices of Health and Mr. Gary J. Taylor Human Services Chief Executive Officer 174 Portland Street Entergy Operations Boston, MA 02114 1340 Echelon Parkway Jackson, MS 39213

Pilgrim Nuclear Power Station cc:

Mr. John T. Herron Ms. Stacey Lousteau Sr. VP and Chief Operating Officer Treasury Department Entergy Nuclear Operations, Inc. Entergy Services, Inc.

440 Hamilton Avenue 639 Loyola Avenue White Plains, NY 10601 New Orleans, LA 70113 Mr. Oscar Limpias Mr. James Sniezek Vice President, Engineering 5486 Nithsdale Drive Entergy Nuclear Operations, Inc. Salisbury, MD 21801 440 Hamilton Avenue White Plains, NY 10601 Mr. Travis C. McCullough Assistant General Counsel Mr. Christopher Schwarz Entergy Nuclear Operations, Inc.

Vice President, Operations Support 440 Hamilton Avenue Entergy Nuclear Operations, Inc. White Plains, NY 1060i 440 Hamilton Avenue White Plains, NY 10601 Mr. James Ross Nuclear Energy Institute Mr. John F. McCann 1776 I Street, NW, Suite 400 Director, Nuclear Safety Assurance Washington, DC 20006-3708 Entergy Nuclear Operations, Inc.

440 Hamilton Avenue Plymouth Public Library White Plains, NY 10601 Attn: Dinah O'Brien 132 South Street Ms. Charlene D. Faison Plymouth, MA 02360 Manager, Licensing Entergy Nuclear Operations, Inc. Duxbury Free Library 440 Hamilton Avenue ATTN: Ms. Elaine Winquist White Plains, NY 10601 77 Alden Street Duxbury, MA 02332 Mr. Michael D. Lyster 5931 Barclay Lane Naples, FL 34110-7306 Kingston Public Library ATTN: Reference Librarian Mr. Michael J. Colomb 6 Green Street Director of Oversight Kingston, MA 02364 Entergy Nuclear Operations, Inc.

440 Hamilton Avenue Ms. Mary Lampert White Plains, NY 10601 Duxbury Nuclear Advisory, Chair Pilgrim watch, Director 148 Washington Street Duxbury 02332

1REQUESTS FOR ADDITIONAL INFORMATION PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL APPLICATION SECTIONS 3.5 STRUCTURES AND COMPONENT SUPPORTS AND 3.6 ELECTRICAL AND INSTRUMENTATION AND CONTROL SYSTEMS RAI 3.6.2-1 In the license renewal application (LRA), Table 3.6.2-1, under Cable connections (metallic parts), the applicant did not indicate any aging effects and does not credit an aging management program (AMP). In the LRA Table 3.6.1 - Electrical Component under discussion of cable connection metallic parts, the applicant stated that cable connections outside of active devices are taped or sleeved for protection and states operating experience with metallic parts of electrical cable connections at Pilgrim Nuclear Power Station or (PNPS or Pilgrim) does not indicate any aging effects requiring management. Electrical cable connections (metallic parts) are subject to aging effects which include thermal cycling, ohmic heating, electrical transients, vibration, chemical contamination, corrosion, and oxidation. NUREG-1 801, Revision 1, AMP XI.E6, "Electrical Cable Connection not Subject to 10 CFR 50.49 Environmental Qualification Requirements," typically include connections associated with cables to be within the scope of license renewal and credits the above AMP. Please clarify how you propose to manage cable connection components during the license extension for the aging effects they are subjected to, or propose a suitable AMP that will manage effects. Please also evaluate them for any plant specific operating experience at Pilgrim. If Entergy evaluates otherwise, please provide justification for why the above generic aging lessons learned recommended program need not be credited.

RAI 3.5.1-1 In LRA Table 3.5.2-6, PNPS has identified 30 line items that reference Table 3.5.1, item 3.5.1-39. For two of these line items, the LRA stated that loss of material of carbon steel fire hose reels and damper framing exposed to a "protected from weather' environment is managed using the Fire Protection Program. For the other 28 line items the LRA credited the Structures Monitoring Program for managing the aging effects of loss of material. However, the discussion column of LRA Table 3.5.1, line item 3.5.1-39 credits only the Structures Monitoring Program, and does not credit the Fire Protection Program. Furthermore, LRA Appendix B.1.13.1, Fire Protection Program description does not address hose reels or damper framing, but LRA Appendix B. 1.13.2, Fire Water System Program description includes valves (dampers), and an enhancement to include inspection of hose reels.

Please clarify which is the correct program, Fire Protection or Fire Water System that should have been credited in LRA Table 3.5.2-6 for aging management of fire hose reels and damper housing; and justify why this program is not credited in the discussion column of LRA Table 3.5.1, item 3.5.1-39 or revise the LRA to include this program.

Enclosure

RAI 3.5.1-2 In the discussion column of LRA Table 3.5.1, line item 3.5.1-45, PNPS stated that abrasion and cavitation due to flowing water is insignificant, nonetheless, the Structures Monitoring Program will confirm the absence of aging effects for PNPS group 6 concrete structures. However, there is no line item in any of the AMR results Tables 3.5.2-X where the LRA Table 3.5.1 line item 3.5.1-45 is referenced.

Please justify why there is no line item in LRA Tables 3.5.2-X where the LRA Table 3.5.1 line item 3.5.1-45 is referenced or revise the LRA to include this reference.

2