MONTHYEARML20217G3721999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With ML20212C4761999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With ML20216E3781999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20209H3831999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With ML20195K2951999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20206R5031999-04-30030 April 1999 Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With ML20205P9811999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20204C3111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20199G3641998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20197K1161998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20195F8061998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Sequoyah Nuclear Plant.With ML20154H6091998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20153B0881998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Sequoyah Nuclear Plant.With ML20237B5221998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Snp ML20236R0051998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Sequoyah Nuclear Plant ML20249A8981998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Sequoyah Nuclear Plant,Units 1 & 2 ML20247L5141998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Sequoyah Nuclear Plant ML20217E2221998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Sequoyah Nuclear Plant ML20248L2611998-02-28028 February 1998 Monthly Operating Repts for Sequoyah Nuclear Plant,Units 1 & 2 ML20202J7911998-01-31031 January 1998 Monthly Operating Repts for Jan 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199A2931997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20198M1481997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20197J1011997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199C7201997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Sequoyah Nuclear Plant ML20198J8941997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20216J6011997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Sequoyah Nuclear Plant ML20210K5781997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Sequoyah Nuclear Plant ML20141H3071997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20140H1571997-05-31031 May 1997 Monthly Operating Repts for May 1997 for SQN ML20141F4321997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Sequoyah Nuclear Plant Units 1 & 2 ML20137T3011997-03-31031 March 1997 Monthly Operating Repts for March 1997 for SQN ML20136H2191997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for SQN ML20134M2001997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for SQN ML20133K4861996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Sequoyah Nuclear Plant Units 1 & 2 ML20133A1121996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for SQN Plant ML20134N2501996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Sequoyah Nuclear Plant ML20128Q0251996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Sequoyah Nuclear Plant,Units 1 & 2 ML20129C2181996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Sequoyah Nuclear Plant ML20116M1511996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Sequoyah Nuclear Plant ML20115H0371996-06-30030 June 1996 Monthly Operating Repts for June 1996 for SQN ML20112H6351996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Sequoyah Nuclear Plant ML20112A7901996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Sequoyah Unit 1 & 2 ML20107B7591996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Sequoyah Nuclear Plant,Units 1 & 2 ML20101D3351996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Sequoyah Nuclear Plant ML20149K2341996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Snp ML20096F0201995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Snp ML20095J0461995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Snp ML20094L7381995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Sequoyah Nuclear Plant ML20093F5351995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Sequoyah Nuclear Plant ML20092G2981995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Sequoyah Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212J6311999-10-0101 October 1999 SER Accepting Request for Relief from ASME Boiler & Pressure Vessel Code,Section Xi,Requirements for Certain Inservice Insp at Plant,Unit 1 ML20217G3721999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Sequoyah Nuclear Plant.With ML20212F0831999-09-23023 September 1999 Safety Evaluation Granting Relief from Certain Weld Insp at Sequoyah Nuclear Plant,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(ii) for Second 10-year ISI Interval ML20212F4761999-09-23023 September 1999 Safety Evaluation Supporting Amends 246 & 237 to Licenses DPR-77 & DPR-79,respectively ML20212C4761999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Sequoyah Nuclear Plant.With ML20210L4361999-08-0202 August 1999 Cycle 9 12-Month SG Insp Rept ML20216E3781999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20210L4451999-07-31031 July 1999 Unit-2 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept ML20210G6631999-07-28028 July 1999 Cycle 9 90-Day ISI Summary Rept ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209H3831999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Sequoyah Nuclear Plant.With ML20211F9031999-06-30030 June 1999 Cycle 9 Refueling Outage ML20196J8521999-06-28028 June 1999 Safety Evaluation Authorizing Proposed Alternative to Use Iqis for Radiography Examinations as Provided for in ASME Section III,1992 Edition with 1993 Addenda,Pursuant to 10CFR50.55a(a)(3)(i) ML20195K2951999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20206Q8951999-05-0505 May 1999 Rev 0 to L36 990415 802, COLR for Sequoyah Unit 2 Cycle 10 ML20206R5031999-04-30030 April 1999 Monthly Operating Repts for April 1999 for Sequoyah Units 1 & 2.With ML20205P9811999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20204C3111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20205B6631999-02-28028 February 1999 Underground Storage Tank (Ust) Permanent Closure Rept, Sequoyah Nuclear Plant Security Backup DG Ust Sys ML20203H7381999-02-18018 February 1999 Safety Evaluation of Topical Rept BAW-2328, Blended U Lead Test Assembly Design Rept. Rept Acceptable Subj to Listed Conditions ML20211A2021999-01-31031 January 1999 Non-proprietary TR WCAP-15129, Depth-Based SG Tube Repair Criteria for Axial PWSCC Dented TSP Intersections ML20198S7301998-12-31031 December 1998 Cycle 10 Voltage-Based Repair Criteria 90-Day Rept ML20199G3641998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20197J5621998-12-0303 December 1998 Unit 1 Cycle 9 90-Day ISI Summary Rept ML20197K1161998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20195F8061998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Sequoyah Nuclear Plant.With ML20154H6091998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Sequoyah Nuclear Plant,Units 1 & 2.With ML20154H6251998-09-17017 September 1998 Rev 0 to Sequoyah Nuclear Plant Unit 1 Cycle 10 Colr ML20153B0881998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Sequoyah Nuclear Plant.With ML20239A0631998-08-27027 August 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Sequoyah Nuclear Plant,Units 1 & 2 ML20236Y2091998-08-0707 August 1998 Safety Evaluation Accepting Relief Requests RP-03,RP-05, RP-07,RV-05 & RV-06 & Denying RV-07 & RV-08 ML20237B5221998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Snp ML20237A4411998-07-31031 July 1998 Blended Uranium Lead Test Assembly Design Rept ML20236P6441998-07-10010 July 1998 LER 98-S01-00:on 980610,failure of Safeguard Sys Occurred for Which Compensatory Measures Were Not Satisfied within Required Time Period.Caused by Inadequate Security Procedure.Licensee Revised Procedure MI-134 ML20236R0051998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Sequoyah Nuclear Plant ML20249A8981998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Sequoyah Nuclear Plant,Units 1 & 2 ML20247L5141998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Sequoyah Nuclear Plant ML20217K4471998-04-27027 April 1998 Safety Evaluation Supporting Requests for Relief 1-ISI-2 (Part 1),2-ISI-2 (Part 2),1-ISI-5,2-ISI-5,1-ISI-6,1-ISI-7, 2-ISI-7,ISPT-02,ISPT-04,ISPT-06,ISPT-07,ISPT-8,ISPT-01 & ISPT-05 ML20217E2221998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Sequoyah Nuclear Plant ML20248L2611998-02-28028 February 1998 Monthly Operating Repts for Sequoyah Nuclear Plant,Units 1 & 2 ML20199J2571998-01-31031 January 1998 Cycle 9 Voltage-Based Repair Criteria 90-Day Rept ML20202J7911998-01-31031 January 1998 Monthly Operating Repts for Jan 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199J2441998-01-29029 January 1998 Snp Unit 2 Cycle Refueling Outage Oct 1997 ML20199F8531998-01-13013 January 1998 ASME Section XI Inservice Insp Summary Rept for Snp Unit 2 Refueling Outage Cycle 8 ML20199A2931997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20198M1481997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20197J1011997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Sequoyah Nuclear Plant,Units 1 & 2 ML20199C2951997-11-13013 November 1997 LER 97-S01-00:on 971017,vandalism of Electrical Cables Was Observed.Caused by Vandalism.Repaired Damaged Cables, Interviewed Personnel Having Potential for Being in Area at Time Damage Occurred & Walkdowns ML20199C7201997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Sequoyah Nuclear Plant L-97-215, SG Secondary Side Loose Object Safety Evaluation1997-10-23023 October 1997 SG Secondary Side Loose Object Safety Evaluation 1999-09-30
[Table view] |
Text
'
1 TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 5N-157B Lookout Place MAY 151990 U.S. Nuclear Regulatory Commission i ATTN: Document Control Desk Washington, D.C. -20555 i Gentlemen:
'In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) '50-328 SEQUOYAH NUCLEAR PLANT (SQN) - APRIL 1990 MONTHLY OPERATING REPORT Enclosed is the April 1990 Monthly Operating Report as required by SQN Technical Specification- 6.9.1.10.
If you have any questions concerning this matter, please call R'. R. Thompson- T at (615) 843-7470.
I Very truly yours, TENNESSEE VALLEY AUTHORITY j k ll, h i
G. Wallace, Manager Nuclear Licensing and Regulatory Affairs. -i Enclosure i' cc (Enclosure):
INP0 Records Center Regional Administration !
Institute of Nuclear Power Operations U.S. Nuclear Regulatory Commission j 1100 Circle 75 Parkway, Suite 1500 Office of Inspection and Enforcement !
Atlanta, Georgia 30389 Region II 101 Marietta Street, NW, Suite 2900 ;
Mr. B. D. Liaw, Director- Atlanta, Georgia 30323 TVA Projects Division- ;
One White Flint, North Mr. B. A. Wilson, Assistant Director- ;
11555 Rockville Pike for Inspection Programs i Rockville, Maryland 20852 TVA Projects Division U.S. Nuclear Regulatory Commission ,
Mr. Ted Marston, Director .
Region-II' s Electric Power Research Institute 101 Marietta Street, NW, Suite 2900 P.O. Box 10412 Atlanta, Georgia 0323 Palo Alto,.Callfornia 94304 8 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 l
900518016e 900430 )
PDR ADOCK 05000327 L' l R PDC . An Equal opportunity Employer -
t r ff z
- 4
- (.. - , e 7;;
dic .
<a, 1
,., Q : ,
s, a- ,
., TENNESSEE VALLEY-l AUTHORITY- -!
t NUCLEAR POWER GROUP 1 SEQUOYAH NUCLEAR PLANT j d
/ MONTHLY OPERATING.' REPORT-'
TO THE' :
S NUCLEAR-REGULATORY. COMMISSION i f
a APRIL 1990 j l
- i
't 4 UNIT 1 ,
DOCKET NUMBER 50-327'
. LICENSE NUMBER DPR-77 ;
4-
'\
UNIT 2. .
DOCKET NUMBER 50-328 ~
LICENSE NUMBER'DPR j e
i o
q
--f--
-~i ?
2 :t
.e ~
. ,, . ~. 2..= . ,- ,_-. , ._ . . . . _ . . . . . . . .
e.
p.
OPERATIONAL
SUMMARY
APRIL 1990-UNIT-1 Unit 1 entered its Cycle _4 refueling outage on March 17, 1990. The outage continued.throughout the month of April, with Unit 1 in Mode 6 at the beginning of the month.- On' April'2, 1990, Unit-1 entered an undefined
- mode when all fuel had been removed from the core. Fuel reloading began on ;
April 17, 1990, and the unit entered Mode 6 at l'17 0 (EDT). Unit 1 entered Mode'5 on April 27, 1990, at 0620 (EDT), and remained in Mode 5 through the end of April.
UNIT 2 Unit 2 generated 769,810 MWh (gross) electrical power during April, with a capacity factor of 90.5 percent. Unit 2 reactor power level was reduced t'o 95 percent on April _8, 1990, for maintenance on FW Heater 28-1, and was returned to 100 percent reactor power level on April'9,1990.
Unit 2 also experienced an unplanned' reactor scram from 100 percent power level on April 10, 1990, at 0134 (EDT), when-steps of 51-90.82, " Reactor Trip Instrumentation Monthly Functional Test (SSPS) - Unit 2," were-performed out !
of sequence. The unit tied online on April 11, 1990, at 1612 (EDT), and was again at 100 percent reactor power-level on April 13, 1990, at 1551 (EDT).
- l POWER-0PERATED~ RELIEF VALVES (PORVs) AND-SAFETY VALVES
SUMMARY
l There were no challenges to PORVs or safety-valves.in the month of April.
OFFSITE DOSE CALCULATION MANUAL (00CM) CHANGES There were no changes to the ODCM during the month of April.
I 4
6 i
1
t AVERAGE DAILY UNIT POWER LEVEL DOCKEi NO. 50-327' ,
UNIT One DATE 05-01-90 ,
COMPLETED BY T. J. Ho11omon TELEPHONE (615) 843-7528 .
r r
MONTH APRIL 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 -
2 17 -
2 2 - 2 18 - 2 _
3 - 2 .19 -
2 4 - 2 20 - 2 5 - 1 21 - 2 _
6 - 2 22 - 1 7 - 2 23 2 8 - 2 24 -
2 9 - 2 25 -
2 _
i
- 16 10 26 - 2-F 11 - 18 27 - 2 12 - 2 28 - 2 i 13 - 3 29- - 2 14 - 1 30 - -2 !
15 - 2 31 N/A
}
i 16 - 2 1 I
t' I
AVERAGE DAILY UNIT POWER LEVEL I
DOCKET NO. 50-328 Unit' Two DATE' 05-01-90
-COMPLETED BY T. J. Ho11omon i TELEPHONE (615) 843-7528 t
MONTH APRIL 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1132 17 1133 2 1135 18 1132 -
3 1135 19 1132' f 4 1135 20 1131 5 1134 21 1132 i 6 1134 22 1135 7 1133 23' -1134 8 _
1084 24 1135
!- 9 1093 25 1134 10 57 26 1136 11 39 27 1133 12 437 -28 1133 13 1082 29 1132 :
14 1126 30 1131 I 15 1132 31 N/A 16 1133 i
OPERATING DATA REPORT -
~.
DOCKET NO. 50-327 DATE Hav 1. 1990 -
COMPLETED BY T. J. Hollomon TELEPHONE (6151 843-7528 OPERATING STATUS Notes
.1. Unit Name: Seouovah Unit One
- 2. Reporting Period: April 1990
- 3. Licensed Thermal Power (HWt): 3411.0
- 4. Nameplate Rating (Gross HWe): 1220.6
- 5. Design Electrical Rating (Net HWe): 1148.0
- 6. 'Haximum Dependable Capacity (Gross HWe): 1183.0
- 7. Maximum Dependable Capacity (Net HWe): 1148.0
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted, If Any (Net HWe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period . 719 2.879 77.424
- 12. Number of Hours Reactor Was Critical 0 1.803.2 35.299
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. Hours Generator On-Line 0 1.803.0 -34.492.4
- 15. Unit Reserve Shutdown Hours 0- 0 0
- 16. Gross Thermal Energy Generated (HWH) 0 5.839.530.2 112.175.410
- 17. Gross Electrical Energy Generated (HWH) .0 2.026.980 38.050.736
- 18. Net Electrical . Energy Generated (HWH) -2.769 1.957.400 36.429.429
- 19. Unit Service Factor 0.0 62.6 44.6
- 20. Unit Availability Factor 0.0 62.6 __
44.6
- 21. . Unit Capacity Factor (Using HDC Net) 0.0 - 59.2 41.0
' 22. Unit Capacity Factor (Using DER Net)
' 0.0 59.2 41.0
- 23. Unit Forced Outage Rate ~ 0.0 - 0.0 48.0
- 24. Shutdowns Scheduled Over Next 6 Honths:(Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: Hav 22. 1990
- _. __ _ _ . , -_. __ _~ _. _ , _ , , . . -. . . . _ . , . . _ .
. . . ~
~.
OPERATING DATA REPORT
- DOCKET N0, _S0-328 DATE .Elv 1. 1990 COMPLETED BY . T. 3. Hollomon TELEPHONE (615) 843-7528 OPERATING STATUS Notes 1.' Unit Name: Seouovah Unit Two
- 2. Reporting Period: April 1990
- 3. Licensed Thermal Power (MWt): 341).O
- 4. Nameplate Rating (Cross MWe): 1220.6
- 5. Design Electrical Rating (Net MWe): 1148.0
- 6. Maximem Dependable Capacity (Gross MWe): 1183.0
- 7. Maxiaum Dependable Capacity (Net MWe): 1148.0
' 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rep >rt Give Reasons:
N/A
- 9. Power Level To Which Restricted. If Any (Net MWe): N/A
- 10. Reasons- For Restrictions. If Any: N/A' This Month Yr-to-Da te Cumulative
- 11. Hours in Reporting Period 719 2.879 69.384
- 12. Nurnber of Hours Reactor Was Critical 691.9 2.851.9 36.382
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. Hours Generator On-Line 680.4 2.840.4 35.536.2
- 15. Unit Reserve' Shutdown Hours ' O.0 0- 0
- 16. Gross Thermal Energy Generated (MWH) _Z.242.120.8 9.390.304.5 109.800.564
- 17. Gross Electrical' Energy Generated (MWH) 769.810- 3.233.630 37.254.426 -
- 18. Net Electrical Energy Generated (MWH) 742.585 3.121.273 35.569.607
- 19. Unit Service Factor 94.6 98.7 51.2
- 20. Unit Availability Factor 94.6 98.7 51.2
- 21. Unit Capacity Factor (Using MDC Net) 90.0 94.4 44.7
- 22. Unit Capacity Factor (Using DER Net) 90.0 94.4 44.7
- 23. Unit Forced Outage Rate s.4 1.3 43.0
- 24. Shutdowns Scheduled Over Next 6 Nonths (Type. Date, and Duration of Each):
Unit 2 Cvele 4 refuelino outaae is scheduled for September 1990 with a duration of 70 davs.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- ;_ , - . . _ - - _- - - _ = - - -
DOCKET NO: 50-327- : 3 .. 2 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT.NAME: - One <.: ..
DATE: 05/08/90 REPORT MONTH: Acril 1990 COMPLETED BY:T. J. Hollomon.
. TELEPHONE:16151 843-7528 (
Method of Licensee Cause and Corrective Duration Shutting Down Event' . System Component Action to No. Date- Type' (Hours) Reason' Reactor 3 Report No. Code
- Code ' Prevent Recurrence:
2 900317.. S- 1076.02 C -1 Unit.1 Cycle 4 refueling outage continues.
'5F: Forced 2 Reason- . .
'Methodi.
- Exhibit'G-Instructions-S: Scheduled - A-Equipment Failure (Explain) Manual for. Preparation of Data B-Maintenance or Test 2-Manual . Scram . Entry sheets for Licensee
-C-Refueling
~
3-Automatic Scram' .
. Event Report (LER) File -
D-Regulatory Restruction... .. . 4-Continuation of Existing Outage '(NUREG-061):
' E-Operator- Training and License Examination - 5-Reduction F-Administrative. .
'9-Other-G-Operational Error -(Explain) '5 Exhibit I-Same'Sosrce H-Other (Explain)'-
W-
- .u L~ ._ . id. a ~2 __._ L.__-~ ; .._m._a-. -
.--... . _ . _ _ . _ _ i_. -- -
J'
DOCKET NO: 50-328 , ,
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME: Two ' ,
REPORT HONTH: Aoril 1990 COMPLETED BY:T. -J. Holloecn ~
. TELEPHONE:I6151 843-7528. e si Method of Licensee Cause and Corrective Duration Shutting'Down Event System Component Action to No. Date Type' (Hours) Reason
- Reactor Report No. Code' Code' Prevent Recurrence-.
3 '4/8/90 F B 5 Power levet was reduced to 95 percent on 4/8/90 at 0339 (EDT).. for maintenance on FW Heater 2B-1. Unit 2 was again at 100 percent power on 4/9/90 at 1920 (EDT).
4 4/10/90. F 38.6 B- 3 2-90008 Unit 2 tripped at 0134 (EDT), on 4/10/90, when steps of SI-90.82,
" Reactor Trip Instrumen-tation Monthly functional Test (SSPS)
- Unit 2." were performed out of-sequence. The unit
' tied online on 4/11/90 at 1612 (EDT), and was again at.iOO percent reactor power level on 4/13/90 at 1551 (EDT).
'F: Forced 2 Reason: 8 Hethod:
- Exhibit G-Instructions 5: Scheduled A-Equipment Failure (Explain) 1-Manual for. Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling .
3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Outage (NUREG-061)
E-Operator Training and License Examination 5-Reduction F-Administrative '9-Other G-Operational Error (Explain) ' Exhibit I-Same Source H-Other (Explain)
- .._~._ _ _ _ , , _.. . . . . . _ . ._ _ ~)