|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03
[Table view] |
Text
- ,_
< .. + i t
== ----
Log # TXX-93237 Fi1e # 10010 l---
_ _ _- Ref. # 10CFR50.55a(f)(4)
TUELECTRIC July 1, 1993 William J. Cahill, Jr.
Group Vire President U. S. Nuclear Regulatory Commission ,
Attn: Document Control Desk .!
Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 REQUEST FOR ADDITIONAL INFORMATION, ASME INSERVICE TEST PROGRAM AND INSERVICE TEST PROGRAM RELIEF REQUEST V-5 REF: 1) TU Elect' Letter logged TXX-93029 from William J. Cahill, Jr., to the NRC dated January 21, 1993 !
- 2) NRC Safety Evaluation dated January 29, 1993, for CPSES Unit 1
- 3) Appendix R of Supplement No. 26 to NUREG-0797 Related to the Operation of Comanche Peak Steam Electric Station, Unit 2 (February 1993)
Gentlemen:
On January 21, 1993, via Reference 1, TU Electric committed to provide a .
report describing the process used in the development of the CPSES ASME Boiler and Pressure Vessel Code Section XI Inservice Test Program (IST) (See Attachment 1) and to address concerns regarding IST Relief Request V-5 (See Attachment 2). Included in Attachments 1 and 2 are clarifications of statements from References 2 and 3. If you have any questions please contact Mr. Carl B. Corbin at (214) 812-8859.
Sincerely, i Y&
CBC/bm Attachments c- Mr. J. L. Milhoan, Region IV Resident Inspectors, CPSES (2)
Mr. T. A. Bergman, NRR ,
Mr. B. E. Holian, NRR l l
NcA1 9307080309 9307oy_ y3 l p DR- ADOCK 05000445 $N h ,{I !
PDR C;
$50 N. Olive Street LB. 81 Dallas, Texas 75201 !
i r
. l l
Attachment 1 to TXX-93237 Page 1 of 5 IST PROGRAM DEVELOPMENT PROCESS The referenced NRC safety evaluations requested that TV Electric provide the NRC staff with a description of the process used in the development of the CPSES IST Program. Specifically, information was requested regarding details of the documents used, the method for determining which components require inservice testing, the basis for the required testing, the basis for categorizing valves, and the method or process used for maintaining the program current with design modifications or other activities performed l under 10CFR50.59. The details below are provided for your information. 1 Future revisions of the IST Plan and supporting documentation will be I available on site.
l Documents In addition to the documents listed in Section 1.5 of the CPSES IST Plan, the following documents were used in the development of the IST Program:
Applicable portions of CPSES Licensing Basis Documents including FSAR, Technical Specifications and Bases, Technical Requirements Manual, and the IST Plan; CPSES Design Basis Documents (which compile details of design, operation, testing, and compliance with codes & standards, on a system basis);
Other CPSES design documents including drawings, equipment ;
specifications, calculations and analyses-r Vendor documents including drawings, correspondence, and maintenance & ;
operation manuals; and Applicable portions of NUREG-0797, " Safety Evaluation Report related to the operation of CPSES Units 1 & 2", including supplements.
l Method for Determinina Scope The method for determining which components require inservice testing is ,
described in CPSES IST Plan, Section 2.2, " Scope (of the Inservice Pump Testing Plan)" and Section 3.2, " Scope (of the Inservice Valve Testing ;
Plan)." As indicated in those IST Plan sections, the active components included in the IST Program are those active pumps, valves and pressure relief devices which are described and listed in FSAR Sections 3.9N.3.2 and '
3.98.3.2, " Pump and Valve Operability Assurance." Thus, the inservice test program scope is maintained consistent with the licensing basis for active ;
components.
1 1
i j Attachmert 1 to TXX-93237 Page 2 of 5 :
The FSAR classification methodology for active components is taken from Regulatory Guide 1.48 and includes those pumps, valves and pressure relief '
devices "that must perform a mechanical motion during the course of accomplishing a system safety function." System safety functions are defined to include any function that is necessary to assure (1) the '
integrity of the reactor coolant pressure boundary, (2) the capability to shutdown the reactor and maintain it in a safe shutdown condition, or (3) the capability to prevent or mitigate the consequences of accidents which t could result in offsite exposures comparable to the guideline exposures of 10CFR100. This active component classification methodology and the wording of the scope statements of ASME/ ANSI OM (Parts 1, 6 and 10) are considered ;
to mean the same thing (i.e. pumps, valves and pressure relief devices ;
performing nuclear safety functions).
The passive valves in the CPSES IST Program were identified through individual system reviews. The passive valves include those valves which are required to perform a nuclear safety function (as defined above) by
- maintaining their position and for which ASME/ ANSI OM Part 10 specifies (
leakage testing or position indicator testing requirements. l t
ASME/ ANSI OM Part 1 provides requirements for pressure relief devices which f 4
are required to perform a specific function in shutting down a reactor or in !
mitigating the consequences of an accident. Consistent with ASME/ ANSI OM- t 1987 Interpretation No. 1-2 and the FSAR active component classification methodology described above, the CPSES IST Program scope includes those ;
4 pressure relief devices which themselves perform an active nuclear safety .
l function. TU Electric notes that the referenced NRC safety evaluation for ,
- CPSES Unit 2 reflects this position (page 2 of Reference 3). The discussion
, of IST Program scope in the Unit 1 safety evaluation (pages 2 and 6 of Reference 2) should be clarified to reflect this position.
i Basis for Testino recuirements 1
- The basis for the testing specified for components in the CPSES IST Program is ASME Section XI. In the case of pump testing, ASME/ ANSI OM Part 6
, identifies test requirements based on considerations of.1) pump type, 2) method of pump speed control, 3) arrangement of the pump relative to its driver, and 4) accessibility of pump bearing housings. The CPSES IST. Plan applies these considerations to each pump in the program via a pump classification methodology and specifies the Code required pump test parameters based on the particular class of pump. (Reference IST Plan, Section 2.0). The basis for any pump testing which deviates from the ASME Section XI requirements is described in a relief request which identifies-the deviation. (Reference IST Plan, Appendix A.)
a h
)
W W w= ># W4*-- ~ e- -- +_ _ == _ . _ _ _ . _ _ _ _ ____m --__* a__ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ --__.__m_.m_____ -m_____-.____
l i
Attachment 1 to TXX-93237 Page 3 of 5 In the case of valve and pressure relief device testing, ASME/ ANSI OM Parts 1 & 10 identify test requirements based on considerations of 1) valve and j actuator type, 2) ASME/ ANSI OM Part 10 category, and 3). active or passive i function. The CPSES IST Plan applies these considerations to each valve and pressure relief device in the program in order to determine the appropriate l Code test parameters (Reference IST Plan, Section 3.0). The basis for any i valve or pressure relief device testing which deviates from the ASME Section '
XI requirements is described in a Relief Request which identifies the deviation (Reference IST Plan, Appendix A).
Basis for Cateaorizino Valves The basis for categorizing valves in the CPSES IST Program is ASME/ ANSI OM l Part 10. ASME/ ANSI OM Part 10 requires all valves in the IST Program to be classified as either Active or Passive and to be categorized as A, B, C or D, as defined below. l Active Valves - Valves which are required to change obturator position i to accomplish the required [ nuclear safety] function (s).
Passive Valves - Valves which maintain obturator position and are not-required to change obturator position to accomplish the required (nuclear safety) function (s).
Category A - Valves for which seat leakage is-limited to a specific maximum amount in the closed position for fulfillment of their required
[ nuclear safety] function (s).
Category B - Valves for which seat leakage in the closed position is inconsequential for fulfillment of their required [ nuclear safety]
function (s).
Category C - Valves which are self-actuating in response to some system characteristic, such as pressure (relief valves) or flow (check valves) for fulfillment of their required [ nuclear safety] function (s).
Category D - Valves which are actuated by an energy source capable of only one operation, such as rupture disks or explosively actuated ,
valves.
The ASME/ ANSI OM Part 10 valve classification requirements are interpreted for use in the CPSES IST Program as follows:
i Cateoorv A. Active is used to designate active, power operated or manually j operated valves which have seat leakage limits in the closed position. '
Valves in this category are subject to the position indication verification requirements of ASME/ ANSI OM Part 10, para. 4.1 (if applicable), the exercising tests requirements of ASME/ ANSI OM Part 10, para. 4.2.1, and the seat leakage rate test requirements of ASME/ ANSI OM Part 10, para.'4.2.2.
Attachment 1 to TXX-93237 Page 4 of 5 l Cateaory A. Passive is used to designate passive valves of any type which have seat leakage limits in the closed position. Valves in this category are subject to the position indication verification. requirements of-ASME/ ANSI OM Part 10, para. 4.1 (if applicable) and the seat leakage rate test requirements of ASME/ ANSI OM Part 10, para. 4.2.2. .
Cateaory B. Active is used to designate active, power operated or manually 't operated valves which do not have seat leakage limits in the' closed position. Valves in this category are subject to the position indication ;
verification requirements of ASME/ ANSI OM Part 10, para. 4.1 (if applicable) ,
and the exercising test requirements of ASME/ ANSI OM Part 10, para. 4.2.1. !
Cateaory B. Passive is used to designate passive, power operated or manually .
Operated valves which do not have seat leakage limits in the closed >
position. Valves in this category are subject only'to the position '
indication verification requirements of ASME/ ANSI OM Part 10, para. 4.1 (if j applicable) and are only listed in the IST Plan if position indication verification is applicable, j t
Cateaory C. Active is used to designate active, self actuated valves ,
(pressure relief devices and check valves) which do not have seat leakage i limits in the closed position. Valves in this category are subject to the )
position indication verification requirements of ASME/ ANSI OM Part 10, para.
4.1 (if applicable) and the performance test requirements of ASME/ ANSI OM ;
Part 1 for pressure relief devices or the exercising test requirements of ;
ASME/ ANSI OM Part 10, para. 4.3.2 for check valves, as applicable.
- Cateaory A/C. Active is used to designate active, self actuated ~ valves I (pressure relief devices and check valves) which have seat leakage limits in
- the closed position. Valves in this category are subject to the position >
indication verification requirements of ASME/ ANSI OM Part 10, para. 4.1-(if' -l applicable), the performance test requirements of ASME/ ANSI OM Part-1 for i pressure relief devices or the exercising test requirements of ASME/ ANSI OM Part 10, para. 4.3.2 for check valves, as applicable, and the seat leakage ,
rate test requirements of ASME/ ANSI OM Part 10, para. 4.2.2. (Seat Leakage l rate testing is performed as part of the overall performance test for Category C, Active pressure relief devices and may be used to verify a full-stroke exercise to the closed position for somo Category.C- Active check valves. However, these pressure relief devices and check valves are classified as Category A/C only if some safety analysis criteria exist for valve seat leakage such as when they are used as containment isolation valves.)
I 4
4 i
i
-__ _~ . . - . - . . . - _ - _ - _ _ _ . - . - -- - .
Attachment 1 to TXX-93237 Page 5 of 5 !
Cateaory B/C. Active is used to designate the category for the Pressurizer ]
Power Operated Relief Valves (PORVs). This designation is used in ,
recognition of the ASME/ ANSI OM Part 10 requirements for testing Category B I Active, power operated valves as well as the ASME/ ANSI OM Part 1 )
requirements for testing Category C Active, power operated relief valves. !
Note that ASME/ ANSI OM Part 1 only specifies test requirements for ASME 1 Class 1 power operated relief valves. The Pressurizer PORVs are subject to !
the position indication verification requirements of ASME/ ANSI OM Part 10, !
para. 4.1, the exercising test requirements of ASME/ ANSI OM Part 10, para.
4.2.1, and the applicable performance test requirements of ASME/ ANSI OM Part 1.
There are no Category D valves in the CPSES IST Program.
Process for Maintainina the IST Proaram Current The process for maintaining the CPSES IST Program current with design modifications is integral to the design modification process. Design modifications are reviewed prior to implementation by a subcommittee of the :
Station Operations Review Committee (SORC) for impact on plant programs, procedures, etc. Any required IST Program changes identified during the subcommittee review are incorporated into the implementation schedule for i the design modification and are accomplished at the appropriate schedule milestone. During the closure phase of the design modification process, all ;
required changes to plant programs, procedures, etc. are verified complete. 3 The method for maintaining the CPSES IST Program current with other activities performed under 10CFR50.59 is the 10CFR50.59 review process. The process requir es preparers of 10CFR50.59 reviews to identify instances where a proposed activity will result in a change to the facility or procedures as described in the Licensing Basis Documents. In such cases, the preparer is ,
required to initiate changes to the affected Licensing Basis Documents. The !
CPSES IST Plan is a Licensing Basis Document and therefore is explicitly i considered under the 10CFR50.59 review process. ,
l l
s
l Attachment 2 to TXX-93237 !
Page 1 of 1 !
1 RELIEF REOUEST V5 ,
The reference NRC safety evaluations (References 2 and 3) denied IST Program Relief Request V5 for the inservice testing of CPSES Units 1 & 2 and i directed TU Electric to either revise and resubmit the relief request or to !
develop a test method which complies with the ASME Code requirements and :
withdraw the relief request. The safety evaluations further stipulated that !
the substitute test proposed in Relief Request V5 is acceptable until the i appropriate action is taken by TU Electric to resolve the NRC. staff l concerns. However, this action must be taken prior to startup from the .
third refueling outage for Unit 1 (1RF03) and prior to startup from the l first refueling outage for Unit 2 (2RF01). j TU Electric has determined that the appropriate resolution for this issue is l to implement the required ASME Code tests for the check valves addressed by i Relief Request V5. Therefore, the CPSES IST Program will be. revised to !
withdraw the relief request and to specify the appropriate Code test i requirements for these valves. This IST Program revision will be completed l prior to the third refueling outage for CPSES Unit 1 such that the required '
testing can be accompi"shed for the Unit 1 valves prior to startup from the third refueling on Unit 1 (1RF03) and can be accomplished for the Unit 2 valves prior to startup from the first refueling on Unit 2 (2RF01). In the meantime, the substitute test described in Relief Request V5 will continue to be implemented for the check valves in both units.
1 Also, TU Electric would like to clarify the test method which is currently being used to implement the substitute testing described in Relief Request j V5. The referenced NRC safety evaluations contain comments which suggest ,
that the intent of the close exercise test for the check valves addressed by l the relief request may not be met if the test connections used to determine valve closure are located downstream (RCS side) of the check valve pairs.
The comments in the safety evaluations, however, seem to be based on a review of FSAR piping isometric figures which depict the piping containing l the subject check valves. (The FSAR figures are not specifically identified l in the safety evaluations but TU Electric assumes the referenced figures to l be 3.6B-75 and 3.6B-78 through 81.) The intent of these FSAR figures is to I describe the postulated pipe break locations and restraint locations for these lines. These figures contain only the information required to meet this intent and do not necessarily show all test connections for the lines.
By referring to FSAR Figure 9.3-10, sheets 4 and 5 which depict the Chemical l and Volume Control System configuration, it can be seen tnat sufficient test '
connections and test boundary valves are provided upstream of the subject check valves to conduct the type of substitute testing described in_ Relief Request V5. The current test method uses those upstream test connections and boundary valves for testing the check valve pairs identified in Relief Request V5 and is considered adequate to verify valve closure. .
I w w