ML20029C880

From kanterella
Revision as of 05:18, 19 February 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Ts,Deleting Requirements Re Condenser Air Ejector Monitor from Tables 3.3-12 & 4.3-12
ML20029C880
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/22/1994
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20029C878 List:
References
NUDOCS 9405020280
Download: ML20029C880 (10)


Text

__

{

. i 1

Docket No. 50-336 'l B14405

-l l

f Attachment 1 Millstone Nuclear Power Station, Unit No. 2 Proposed Revision to Technical Specifications Radioactive Liquid Effluent Monitoring Instrumentation Marked-Up Technical Specification Pages y

April'1994 9405020280 940422

.PDR ADDCK 05000336 P PDR

Januar._. A [

i -

E" TABLE 3.3-12 T RADI0 ACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION n'

, w ALARM ,

t MINIMUM # SETPOINT INSTRUMENT OPERABLE REQUIRED APPLICABILITT AC_ TION

+

i 1. Gross Radioactivity Monitors Providing Automatic Termination of Release

  • I
a. Clean Liquid Radweste Effluent Line 1 Yes
b. Aerated Liquid Radwaste Effluent Line 1 Yes 1

& c. Steam Generator Blowdown _ Monitor # *** 2

{s Qudenser- Air-Ejector flonth a - it*,) Yes t

$ d. Conuensate Polishing Facility Waste Neut Sump 1 Yes M i

2. Gross Radioactivity Monitors Not Providing Automatic Termination of i Release ,
a. Reactor Building Closed Cooling
  • Yes 3 Water Monitorf 1
3. Flow Rate Measurements
  • 4
a. Clean Liquid Radwaste Effluent Line 1 No ' "
b. Aerated Liquid Radweste Effluent
  • 4 E.~ Line.. 1 No 3 c. Condensate Polishing Facility Waste
  • 4 v: .Neut Sump Discharge Line 1 No
  • NA
d. Dilution Water Flow #f No No
  • NA
e. Steam Generator. Blowdown Line- fil

, _ . _ _ _______-__m

_ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _- # _ _ ,, >=g_ _ _ _ _ r --

w- _ __,__._____-m_m. _ _ _ _ . _ . _ _ . _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _

w Cceoruaty a, 0 00 ,

TABLE 3-3-12 (Continued)

RADIOACTIVE LIQUID EFFLtENT MONITORING INSTRtRENTATION .

Table Notes 8 - At all times - which means that channels shall be OPERABLE and in service on a continuous, uninterrupted basis, except that outages are permitted, for a maximum of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, for the purpose or maintenance and performance or required tests, checks, calibrations, or sampling. ,

" - ugh both monitors are normally operable, only one is necessary as the activity measured by each j can be related to the other, and both monitors are capable of automatically isolating the steam Qnerationblowdown.

      • - Modes 1-5 and Mode 6 when pathway is being used except that outages are permitted for a maximum or 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for the purpose of maintenance and performnce or required tests, checks, etlibrations, or sampling. l f - Since the only source or service water contamination is the reactor building closed cooling water, monitoring of the closed cooling water and conservative leakage assumptions will provide adequate -

control or service water effluents.

ff - The dilution water is determined by the use of condenser cooling water and service water pump status.

Only those pumps actually discharging to the quarry at the time or release are included. Pump status is only reviewed for purposes or determining rious, fif - Determined by the use or valve curves and/or make up flow rates for the purpose or determining flows only.

NA - Not applicable. ~

, .t 3/4 3 *>2 Amendment No. [ ,

.-.laauary 1, 1986-TABLE 4.3-12 RADI0 ACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL .

CHANNEL SOURCE CllANNEL FUNCTIONAL CALIBRATION INSTRUMENT CIECK CIIECK TEST I'

1. GROSS RADI0 ACTIVITY ?!ONITORS l PROVIDING ALARM AUTOMATIC TERMINATION OF REL~ASE
a. Clean Liquid Radwaste .

Effluent Line D* P R(1) Q(2) i i

b. Aerated Liquid Radwaste i Effluent Line D* P R(1) Q(2) i i
c. Steam Generator Blowdown  !

Monitor D* M R(1) Q(2)  !

De(t$tA

d. Condenser Air Ejector Monitor D* M R(3) Q(2)
c. Condensate Polishing Facility -

Waste Neut Sump D* P R(1) Q(2)

2. GROSS RADIOACTIVITY MONITORS PROVIDING ALARM BUT NOT PROVIDING AUTOMATIC TERMINATION OF RELEASE
a. Reactor Building Closed Cooling Water D* M R(1) Q(2)
3. FLOW RATE MEASUREMENT DEVICES
a. Clean Liquid Radwaste Line D* NA R Q
b. Aerated Liquid Radwaste Line D* NA R Q
c. Condensate Polishing Facility - j Waste Neut Sump Line D* NA R Q
d. Dilution Water Flow D(4) NA NA NA-
e. Steam Generator Blowdown Line D(4) NA NA NA l

MILLSTONE - UNIT 2 3/4 3-54 Amendment No.

(

i TABLE 4.3-12 <

(Continued)

TABLE NOTATIONS

  • - During releases via this pathway and when the monitor is required OPERABLE per Table 3.3-12.

The CHANNEL CHECK should be done when the discharge is in progress.

NA - Not Applicable.

(1) - Calibration shall include the use of a known radioactive liquid or solid source which is traceable to an NBS source.

I (2) - The CHANNEL FUNCTIONAL TEST shall also demonstrate th'at control room alarm annunciation occurs if any of the following exist:

a. Instrument indicates measured levels above the alarm / trip setpoint.
b. Instrument indicates a downscale or circuit failure.

1

- Automatic isolation of the discharge stream shall also be i demonstrated for this case for each monitor except the I reactor building closed cooling water monitas 43Fcr t C2 condenser air ejector monitor it is trie isolation of the team cenerator blowdown that _shall--be A=monstrated.

DD erts (3) - alibration shall be periormed using a Knowu avuise wnose strength i determined by a detector which has been calibrated to an NBS source.

source shall be in a known reproducible geometry.

l

64) - Pump or valve status, as appropriate, shall be checked daily for the p'urposes of determining flow rates.

I l I

l l

l MILLSTONE - UNIT 2 3/4 3-55 Amendment No fff I I

- 1 l

l l

4

~

Docket'No. 50-336-814405 l

Attachment 2 Millstone Nuclear Power Statior., Unit No. 2 Proposed Revision to Technical Specifications Radioactive Liquid Effluent Monitoring Insi,rumentation Retyped Technical Soecification Pages i

April-1994-i ir ,

~.

TABLE 3.3-12 ,

RADI0 ACTIVE LIOUID EFFLUENT MONITORING INSTRUMENTATION ,

ALARM MINIMUM # SETPOINT INSTRUMENI OPERABLE RE0UIRFR APPLICABILITY A0101

1. Gross Radioactivity Monitors Providing Automatic Termination of Release
a. Clean Liquid Radwaste Effluent Line 1 Yes 1
b. Aerated Liquid Radwaste Effluent Line 1 Yes 1
c. Steam Generator Blowdown Monitor 1 Yes 2
d. Condensate Polishing Facility Waste Neut Sump 1 Yes *** 1
2. Gros Radioactivity Monitors Not Providing Automatic Termination of Release
a. Reactor Building Closed Cooling Water Monitor # 1 Yes
  • 3
3. Flow Rate Measurements Clean Liquid Radwaste Effluent Line *
a. 1 No 4
b. Aerated Liquid Radwaste Effluent Line 1 No
  • 4
c. Condensate Polishing Facility Waste Nettt Sump Discharge Line 1 No
  • 4
d. Dilution Water Flow ## No
  • N;
e. Steam Generator Blowdown Line ### No N4 MILLSTONE - UNIT 2 0071 3/4 3-51 Amendment No. J7f

TABLE 3.3-12 (Continued)

MDI0 ACTIVE LIOUID EFFLUENT MONITORING INSTRUMENTATION Table Notes At all times - which means that channels shall be OPEPABLE and in service on a continuous, uninterrupted basis, except that outages are permitted, for a maximum of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, for the purpose of maintenance and performance of required tes'.s, checks, calibrations, or sampling.

Deleted.

Modes 1-5 and Mode 6 when pathway is being used except that outages are permitted for a maximum of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for the purpose of maintenance and performance of required tests, checks, calibrations, or sampling.

Since the only source of service water contamination is the reactor building closed cooling water, monitoring of the closed cooling water and conservative leakage assumptions will provide adequate control of service water effluents.

The dilution water is determined by the use of condenser cooling water and service water pump status. Only those pumps actually discharging to the quarry at the time of release are included.

Pump status is ~only reviewed for purposes of determining flows.

Determined by the use of valve curves and/or make up flow rates for the purpose of determining flows only.

NA -

Not applicable.

MILLSTONE - UNIT 2- 3/4 3-52 Amendment No. J9J. J79, 0071

TABLE 4_3-12 RADI0 ACTIVE LIOUID EFFLUENT MONITORING INSTRUMENTATION SVRVEILLANCE REQUIREMENTS CHANNEL CHANNEL SOURCE CHANNEL FUNCTIONAL INSTRUMENT CHECK CHECK ' CALIBRATION TEST

1. GROSS RADI0 ACTIVITY MONITORS PROVIDING ALARM AUTCMATIC TERMINATION OF RELEASE
a. Clean Liquid Radwaste Effluent Line D* P R(1) Q(2)
b. Aerated Liquid Radwaste Effluent Line D* P R(1) Q(2)
c. Steam Generator Blowdown Monitor D* M R(1) Q(2) ,
d. Deleted l
e. Condensate Polishing Facility -

Waste Neut Sump D* P R(1) Q(2)

2. GROSS RADI0 ACTIVITY MONITORS PROVIDING ALARM BUT NOT l PROVIDING AUTOMATIC l TERMINATION OF RELEASE l
a. Reactor Building Closed Cooling Water D* M R(1) Q(2) )

l

3. FLOW RATE MEASUREMENT DEVICES  !

I

a. Clean Liquid Radwaste Line D* NA R Q l
b. Aerated Liquid Radwaste Line D* NA R Q
c. Condensate Polishing Facility -

Waste Neut Sump Line D* NA R Q

d. Dilution Water Flow D(4) NA No NA
e. Steam Generator Blowdown Line D(4) NA NA NA MILLSTONE - UNIT 2 3/4 3-54 Amendment No. Jpf, 0072

y

- TABLE 4.3-12 (Continued)

TABLE NOTATIONS

  • - During releases via this pathway and when the monitor is required OPERABLE per Table 3.3-12. The CHANNEL CHECK should be done when the discharge is in progress.

NA - Not Applicable.

(1) - Celibration shall include the use of a known radioactive liquid or solid source which is traceable to sn NBS source.

I (2) - The CHANNEL FUNCTIONAL TEST shall also demo;,rtrate that control room alarm annunciation occurs if any of the following exist: l l

a. Instrument indicates measured levels above the alarm / trip l setpoint.
b. Instrument indicates a downscale or circuit failure, l

- Automatic isolation of the discharge stream shall also be demonstrated for this case for each monitor except the reactor building closed cooling water monitor. ,

1 (3) - Deleted. 4 (4) - Pump or valve status, as apropriate, shall be checked daily for the purposes of determining flow rates.

i MILLSTONE - UNIT 2 3/4 3-55 Amendment No. J7f, 0072 I