LER 91-008-00:on 910322,reactor Bldg Ventilation Isolation Occurred.Caused by Lightning Strike.Control Room Vents Reset & Toxic Gas Sample Point a Selected.Addl Trips Associated W/ Lightning Strike Immediately reset.W/910418 Ltr
ML20024G681
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 04/19/1991
From: Bax R, Hamann R
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-91-008, LER-91-8, RLB-91-117, NUDOCS 9104240127
Download: ML20024G681 (4)


Text

i

, 1 O Commonwealth C

Edison 00:0 Citas Nuclear Power Station c ) 22710 706 Avenue North Cordova, lilinois 61242 9740

, Telephone 309%4 2241

.= .

1 RLB-91-117-l l

April 18, 1991 U. S. Nuclear Regulatory Commission Document Control Desk

.Hashington. DC 20555

Reference:

_ Quad Cities Nuclear Power Station Docket Number-50-254, DPR-29, Unit One Docket Number 50-265. DPR-30. Unit Two Enclosed is Licensee Event Report _(LER)91-008, Revision'00, for Quad Cities Nuclear Power-Station.

This report is submitted in accordance'with the requirements of the Code of

. federal Regulations. Title 10, Part 50.73(a)(2)(lv). The-Licensee shall report-any event or condition that resulted in a manual or automatic actuation of any Engineered Safety Feature.

Respectfully, COMMONHEALTH EDISON COMPANY D CITIES NUCLEAR POWER STATION f

R. L ax

. Station Hanager-RLB/MJB/vmW Enclosure =

cc: R.-Stols.

T.= Taylor INP0 Records Center NRC Region III-

- emon n ,

9304240127 910419

  • Y[

/j l

-FDRi-ADOCK 0500o254 S- PDR-

,_ , &,1(IN$tt (VEN7 RtPORT (LtR)

Fare Rav 2 1 Facility Name (1) Ootket Cumber (2) .f ana f11 and tit tat hn t t Ona el 11 of 01 of 21 11 4 1 lof 1 Title'(4)

  • ~ tor Au11dino Ventilation Italation Due to tinhinina Strika tvant Data (1) Ltt ' e r (6) Ranort Data (71 Other Facilitian Inyc1vad_181 sequential /j/j/ Revision Month Day Year Facility kamat Dodat Numberft)

Month Day Year Year /

p/p/p/

// kunhar j/// N d ar Quad Cities unit Two ,, g, ,, ,, ,, ,, ,; g al 1 21 2 91 1 el 1

~~'

eio1R

~~~

oIe oIa 11 o el 1 el 11 el of of 1 I THis REPORT !s sueMITito PUR$UANT TO THE RIOUIREMENTS OF 10CFR 0 f theek one or more of the fo11ewine) (111 1 20.402(b) 20.40$(c) .JL $0.73(a)(2)(iv) 73.71(b)

POWER 20.40$(a)(1)(1) $0.36(c)(1) _ $0.73(a)(2)(v) _ 73.71(c)

Ltytt 20.40$(a)(1)(11) $0.36(c)(2) ._ 50.73(a)(2)(vit) ,,,

Other (specify i101 o!0!0 20.40$(a)(1)(it1) _ $0.73(a)(2)(1) $0.73(a)(2)(v111)(A) in Abstract

///,/,/,/ /,/,/,/,/,/,/,/,/,//,/ /,/ / ,/, _

/ 20.40$(a)(1)(iv) 50.73(a)(2)(11) $0.73(a)(2)(v111)(B) below and in

/,,/,,/,

$0.73(a)(2)(iii) 50.73(a)(2)(x) Text)

/}/}/' fff/j/}/'

}f / / f/

f /jfj/fff/j/'j//'j/' j ___ 20.40$( a)(1)(v)

Lit [Nitt CQjgM(T FOR TH11 LtR f121 TtLEPHbNt NUMRtR Name AREA C00t Rachal H e n. Tech Staff tut. 2110 3 1019 El 11 al -l 21 21 4l COMPLETt Dht LINE FOR [AtH ttBtPON T FAILURf DritRfarD IN THit REPORT (111 CAUlt sYsttM COMP 0NINT MANUFAC* REPORTA8LE CAust $YsitM COMP 0NtNT MANUFAC- REPORTABLE Tuttr 70 NPRDS /j/ TURER 70 NPRDS.

l l 1 l l 1 l / l l 1 1 1 l l l i i l l l' l / l l l l 1 l 1 1UPPLEMENTAL REPORT [1PttTtD (141 Expected Month ! Day 1 Yaar tubetssion .i I  !!

lyas (f r van. enmolata EXPttTED SURM11SION DAf t) r i No ' l l A8sTRACT (Limit to 1400 spaces.'t.e. approximately fifteen single-space typewritten lines) (16) e ABSTRACT:

On March 22, 1991 at 2035 hours0.0236 days <br />0.565 hours <br />0.00336 weeks <br />7.743175e-4 months <br />, Unit One was in the SHUTDOWN mode at 0% of rated core r thermal power for a refueling outage. Unit Two was in.the RUN mode at 98% of rated core thermal power. At 2035 hours0.0236 days <br />0.565 hours <br />0.00336 weeks <br />7.743175e-4 months <br />, lightning struck in a Transmission Substation (TSS) where line 0402 (Barstow) terminates. The lightning strike caused the Reactor Building

[VA) and Control Room Vants (VI) to isolate, a channel 'B' 1/2 scram, and oil-circuit breaker:(OCB) 10-11 to trip. Other systems also had actuations caused by the lightning strike. At 2057 hours0.0238 days <br />0.571 hours <br />0.0034 weeks <br />7.826885e-4 months <br />, the Reactor Building Vent fans.were returned to normal, the--

Control Room Vents were reset and Toxic Gas sample point 'A' was selected. Line 0402.

-(OCB 10-11) was closed back in at 2141 hours0.0248 days <br />0.595 hours <br />0.00354 weeks <br />8.146505e-4 months <br />. The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Emergency Notification _ System (ENS) phone call was made at 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br /> on March 22, 1991.

This event is being reported according to 10CFR50.73(a)(2)(iv). ,

3439H? i

Li(Lgs [LiylgLgtPORT f Ltti f f xt ton 7thuAf f ou roten Rev 24.

F ACILITY CAME (1) 00CKtt QuMBER (2) d ig_gytgtR (O Page (31 Year /// seguential ///j Revision

, ,jp ff

/// humber /// _ kgL nund estins unit one oltIoIoIo 1 21 11 4 9l 1 - oIoIa - oIo of 2 . or of 3 ftXT Energy Industry identification system (t!!s) codes are identified in the text as (xx]

PLANT AND SYSTEM IDENTIFICATIO!1 General Electric - Bolling Water Reactor - 2511 MWt rgted core thermal power.

EVENT IDENTIFICATION: Reactor Building Ventilation Isolation Due to Lightning Strike A. CONDITIONS PRIOR TO EVENT:

Unit: One Event Date: March 22, 1991 Event Time: 2035 Reactor Mode: 1 Mode Name: Shutdown Power Level: 00%

This report was initiated by Deviation Report D-4-01-91-050 Shutdown Mode (1) In this position, a reactor scram is initiated, power to the L control rod drives is removed, and the reactor protection trip systems have been deenergized for 10 seconds prior to permissive for manual reset.

'B. DESCRIPTION OF EVENT:

On March 22, 1991 at 2035 hours0.0236 days <br />0.565 hours <br />0.00336 weeks <br />7.743175e-4 months <br />, Unit One was in the SHUTDONN mode at 0% of rated core thermal power for a refueling outage. Unit Two was in the RUN mode at 98% of rated core thermal power. The ' A' train of Standby Gas Treatment (SBGT) was running for the weetly operability surveillance and channel 'B' of the Reactor Protection System (RPS) was on backup power. At 2035 hours0.0236 days <br />0.565 hours <br />0.00336 weeks <br />7.743175e-4 months <br />, lightning struck in a Transmission Substation (TSS) where line 0402 (Barstow) terminates. The lightning strike caused the Reactor Butiding (VA) and Control Room Vents (VI) to isolate, the

-1 220-44 & 45 valves to close, a channel 'B' 1/2 scram, and oil circuit breaker (OCB 10-11) to tri), Radiation Protection was notified of the Vent Isolation so air samples could )e taken in the Reactor-Building. On Unit Two the 'B' Feedwater Regulator Valve locked up. All trips associated with the lightning strike were reset immediately. At 2057-hours,-the Reactor Building Vent fans were returned to normal, the Control Room Vents were reset and Toxic Gas sample point 'A' was selected. Line 0402 (OCB 10-11) was closed back in, at 2141 hours0.0248 days <br />0.595 hours <br />0.00354 weeks <br />8.146505e-4 months <br />. The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Emergency Notification System (ENS) phone call was made at 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br /> on March 22, 1991.

C. APPARENT CAUSE OF EVENT:

The apparent cause of the event was a lightning strike on a Transmission Substation-(TSS) where line 0402 (Barstow) terminates.

3439H l .

e McitstLLynt PtPott (LtRt 7txt f 0NflNUA710N form Rev 2.o_

FACILITY NAME (t) DOCKET CUMBER (2) JLguttig_L1) PaneJ11 Year // 5equential //

/jj Revision

,/j/j f

/L_ humber /// Numhtt.

_Quultities unit one o i s 1 o I o I e i 21 si 4 ol 1 - oIein - oIo 01.3 or ol.3 fixi Energy Industry Identification system ([11sl coces are identtf ted in the text as (xx)

D. SAFETY ANALYSIS OF EVENT:

This event is being reported according to 10CFR50.73(a)(2)(iv) which states that the licensee shall report any event or condition that resulted in manual or automatic actuation of any Engineered Safety Feature (ESF).

The safety consequences of the event are minimal. All trips due to the lightning strike were reset immediately and at 2141 hours0.0248 days <br />0.595 hours <br />0.00354 weeks <br />8.146505e-4 months <br />, line 0402 was closed back in.

Radiation Protection was notified following the Reactor Building Vent Isolation so that air samples could be taken in the Reactor Building. The 'A' train of SBGT was already running for its weekly operability surveillance.

E. CORRECTIVE ACTIONS:

The immediate corrective actions were to close back in line 0402 (Barstow)'and return the Reactor Building Vents to normal. The Control Room Vents were also reset and Toxic Gas Sample point 'A' was selected. All other trips associated with the lightning strike were reset immediately. The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Emergency Notification System phone call was made at 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br /> on March 22, 1991.

F. PREVIOUS EVENTS:

The following is a list of recent events caused by a lightning strike. There are no reported events of Reactor Building Isolation due a lightning strike.

04-1-87-71(LER 87-14) Control Room Vent Isolation due to a lightning strike on the 345 Kv line 0403.

D4-1-87-74(LER 87-16) Smoke detector close-MCR damper due to lightning strike.

D4-1-90-21(LER 90-04) UI Generator Trip / Reactor Trip due a lightning strike.

04-1-90-054(LER 90-13) Valve 1-220-45 closed due to a lightning strike.

G. COMPONENT FAILURF DATA:

There is no equipment failure to report.