RA-14-078, Secondary Containment Capability Test
ML14310A664 | |
Person / Time | |
---|---|
Site: | Oyster Creek |
Issue date: | 10/24/2014 |
From: | Mckenna M Exelon Generation Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RA-14-078 | |
Download: ML14310A664 (2) | |
Similar Documents at Oyster Creek | |
---|---|
Category:Letter type:RA
MONTHYEARRA-19-091, Commitment Change Summary Report - 20192019-12-27027 December 2019
[Table view]Commitment Change Summary Report - 2019 RA-19-080, Response to Request for Additional Information (RAI) Related to Oyster Creek Nuclear Generating Station - Post-Shutdown Decommissioning Activities Report2019-10-18018 October 2019 Response to Request for Additional Information (RAI) Related to Oyster Creek Nuclear Generating Station - Post-Shutdown Decommissioning Activities Report RA-19-076, Request for Continuation of NRC Actions and Approvals Following Transfer of the Licenses from Exelon Generation to Holtec Decommissioning International, LLC2019-09-12012 September 2019 Request for Continuation of NRC Actions and Approvals Following Transfer of the Licenses from Exelon Generation to Holtec Decommissioning International, LLC RA-19-065, Signature Verification and Acceptance of Amendment 19 to Indemnity Agreement No B-37 to Renewed Facility License No. DPR-162019-08-28028 August 2019 Signature Verification and Acceptance of Amendment 19 to Indemnity Agreement No B-37 to Renewed Facility License No. DPR-16 RA-19-052, Security Plan, Training Qualification Plan, Safeguards Contingency Plan, (Revision 18)2019-06-11011 June 2019 Security Plan, Training Qualification Plan, Safeguards Contingency Plan, (Revision 18) RA-19-023, Annual Radioactive Effluent Release Report for 20182019-04-30030 April 2019 Annual Radioactive Effluent Release Report for 2018 RA-19-019, Submittal of Changes to Technical Specifications Bases2019-04-12012 April 2019 Submittal of Changes to Technical Specifications Bases RA-19-012, Supplement for License Amendment Request - License Condition Revision for Removal of Cyber Security Plan Requirements2019-03-0707 March 2019 Supplement for License Amendment Request - License Condition Revision for Removal of Cyber Security Plan Requirements RA-19-007, Response to RAI and Supplemental Information Re Request for Changing Emergency Preparedness License Amendment 294 Effective Date (Change to Adiabatic Heat-Up Calculation)2019-02-13013 February 2019 Response to RAI and Supplemental Information Re Request for Changing Emergency Preparedness License Amendment 294 Effective Date (Change to Adiabatic Heat-Up Calculation) RA-19-003, Amendment No. 17 to Indemnity Agreement No. 8-372019-01-0808 January 2019 Amendment No. 17 to Indemnity Agreement No. 8-37 RA-18-103, Annual Sea Turtle Incidental Take Report - 20182018-12-13013 December 2018 Annual Sea Turtle Incidental Take Report - 2018 RA-18-080, License Amendment Request: License Condition Revision for Removal of Cyber Security Plan Requirements2018-11-12012 November 2018 License Amendment Request: License Condition Revision for Removal of Cyber Security Plan Requirements RA-18-098, License Amendment Request Supplement - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme2018-11-0606 November 2018 License Amendment Request Supplement - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme RA-18-097, Exelon Nuclear Radiological Emergency Plan and Addendum Revisions2018-10-24024 October 2018 Exelon Nuclear Radiological Emergency Plan and Addendum Revisions RA-18-092, License Amendment Request - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme2018-10-22022 October 2018 License Amendment Request - Proposed Change of Effective and Implementation Dates of License Amendment No. 294, Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme RA-18-093, Request to Reinitiate Consultation Regarding the OCNGS Sea Turtle Incidental Take Statement2018-10-16016 October 2018 Request to Reinitiate Consultation Regarding the OCNGS Sea Turtle Incidental Take Statement RA-18-091, Request to Reclassify Oyster Creek Nuclear Generating Station Under 10 CFR 171.15, Annual Fees: Reactor Licenses and Independent Spent Fuel Storage Licenses2018-10-0101 October 2018 Request to Reclassify Oyster Creek Nuclear Generating Station Under 10 CFR 171.15, Annual Fees: Reactor Licenses and Independent Spent Fuel Storage Licenses RA-18-090, Notice Regarding Proposed Amendment No. 1 to Master Terms for Decommissioning Trust Agreements2018-10-0101 October 2018 Notice Regarding Proposed Amendment No. 1 to Master Terms for Decommissioning Trust Agreements RA-18-083, Certification of Permanent Removal of Fuel from the Reactor Vessel for Oyster Creek Nuclear Generating Station2018-09-25025 September 2018 Certification of Permanent Removal of Fuel from the Reactor Vessel for Oyster Creek Nuclear Generating Station RA-18-088, Radiological Emergency Plan Addendum Revision. Includes EP-AA-1010, Addendum 3, Revision 4, Emergency Action Levels for Oyster Creek.2018-09-25025 September 2018 Radiological Emergency Plan Addendum Revision. Includes EP-AA-1010, Addendum 3, Revision 4, Emergency Action Levels for Oyster Creek. RA-18-087, Response to Request for Additional Information (RAI) Related to Post-Shutdown Decommissioning Activities Report2018-09-24024 September 2018 Response to Request for Additional Information (RAI) Related to Post-Shutdown Decommissioning Activities Report RA-18-084, Secondary Containment Capability Test2018-09-14014 September 2018 Secondary Containment Capability Test RA-18-078, Submittal of Sea Turtle Incidental Take Report 2018-0042018-08-15015 August 2018 Submittal of Sea Turtle Incidental Take Report 2018-004 RA-18-077, Sea Turtle Incidental Take Report 2018-0032018-08-14014 August 2018 Sea Turtle Incidental Take Report 2018-003 RA-18-072, Pressure and Temperature Limit Report Revision 12018-06-29029 June 2018 Pressure and Temperature Limit Report Revision 1 RA-18-066, Response to Questions Pertaining to Licensed Operator2018-06-18018 June 2018 Response to Questions Pertaining to Licensed Operator RA-18-070, Submittal of Sea Turtle Incidental Take Report 2018-001 on June 04, 20182018-06-0808 June 2018 Submittal of Sea Turtle Incidental Take Report 2018-001 on June 04, 2018 RA-18-068, Response to Request for Additional Information (RAI) Regarding Request for Approval of Decommissioning Quality Assurance Program, Revision 0 for Oyster Creek Nuclear Generating Station2018-06-0606 June 2018 Response to Request for Additional Information (RAI) Regarding Request for Approval of Decommissioning Quality Assurance Program, Revision 0 for Oyster Creek Nuclear Generating Station RA-18-065, Registration of Use of Cask to Store Spent Fuel2018-05-31031 May 2018 Registration of Use of Cask to Store Spent Fuel RA-18-059, Request for Relief and Rescission of Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2018-05-30030 May 2018 Request for Relief and Rescission of Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events RA-18-055, 10 CFR 50.46 Annual Report2018-05-23023 May 2018 10 CFR 50.46 Annual Report RA-18-053, Update to Spent Fuel Management Plan2018-05-21021 May 2018 Update to Spent Fuel Management Plan RA-18-052, Supplement to Request for Exemption from 10 CFR 50.54(w)(1), Concerning On-Site Property Damage Insurance and Supplement to Request for Exemption from 10 CFR 140.11(a)(4), Concerning Primary and Secondary ...2018-05-0808 May 2018 Supplement to Request for Exemption from 10 CFR 50.54(w)(1), Concerning On-Site Property Damage Insurance and Supplement to Request for Exemption from 10 CFR 140.11(a)(4), Concerning Primary and Secondary ... RA-18-049, Registration of Use of Cask to Store Spent Fuel2018-05-0707 May 2018 Registration of Use of Cask to Store Spent Fuel RA-18-046, Oyster Creek, Transmittal of Annual Radiological Environmental Operating Report for 20172018-04-30030 April 2018 Oyster Creek, Transmittal of Annual Radiological Environmental Operating Report for 2017 RA-18-047, Annual Radioactive Effluent Release Report for 20172018-04-30030 April 2018 Annual Radioactive Effluent Release Report for 2017 RA-18-018, Submittal of Changes to Technical Specifications Bases2018-04-13013 April 2018 Submittal of Changes to Technical Specifications Bases RA-18-021, Request for Exemption from Record Retention Requirements2018-04-12012 April 2018 Request for Exemption from Record Retention Requirements RA-18-028, Request for Rescission of Commission Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)2018-04-12012 April 2018 Request for Rescission of Commission Order Modifying License with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) RA-18-027, Request for Rescission of Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2018-04-12012 April 2018 Request for Rescission of Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) RA-18-036, Response to Request for Additional Information (RAI) and Supplement Regarding License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled ...2018-03-29029 March 2018 Response to Request for Additional Information (RAI) and Supplement Regarding License Amendment Request - Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled ... RA-18-019, Request for Exemption from 10 CFR 50.54(w)(1), Concerning On-Site Property Damage Insurance2018-03-29029 March 2018 Request for Exemption from 10 CFR 50.54(w)(1), Concerning On-Site Property Damage Insurance RA-18-020, Request for Exemption from 1 O CFR 140.11 (a)(4), Concerning Primary and Secondary Liability Insurance2018-03-29029 March 2018 Request for Exemption from 1 O CFR 140.11 (a)(4), Concerning Primary and Secondary Liability Insurance RA-18-032, Revision to Commitments Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2018-03-27027 March 2018 Revision to Commitments Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues RA-18-034, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv)2018-03-22022 March 2018 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) RA-18-015, Withdrawal of Application to Revise Technical Specifications to Implement BWRVIP-18, Revision 2-A and Relief Request for Extension of Torus Examinations2018-02-15015 February 2018 Withdrawal of Application to Revise Technical Specifications to Implement BWRVIP-18, Revision 2-A and Relief Request for Extension of Torus Examinations RA-18-014, Response to Request for Additional Information (RAI) and Supplemental Regarding License Amendment Request - Proposed Changes to the Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme2018-02-13013 February 2018 Response to Request for Additional Information (RAI) and Supplemental Regarding License Amendment Request - Proposed Changes to the Oyster Creek Emergency Plan for Permanently Defueled Emergency Plan and Emergency Action Level Scheme RA-18-008, Summary of Changes to Quality Assurance Topical Report, NO-AA-102018-02-0808 February 2018 Summary of Changes to Quality Assurance Topical Report, NO-AA-10 RA-18-010, Supplement to Relief Request for Extension of Torus Examinations2018-01-24024 January 2018 Supplement to Relief Request for Extension of Torus Examinations RA-17-086, Commitment Change Summary Report - 20172017-12-21021 December 2017 Commitment Change Summary Report - 2017 2019-09-12 Category:Report MONTHYEARML24269A0472024-10-0404 October 2024
[Table view]Enclosure 2, Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Pending Request for Additional Information ML24214A0612024-08-0101 August 2024 Enclosure 15: ENG-OCS-014 Revision: 0, Basement Fill Model: Probabilistic Analysis for Embedded Pipes Scenario Oyster Creek Station, January 2024 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24214A0692024-08-0101 August 2024 Enclosure 18: Technical Basis Document No. 24-01-12-2888 Revision 1, Dose Contribution from Insignificant Radionuclides in the Oyster Creek Site-Specific Suite of Radiological Nuclides, February 14, 2024 ML24214A0702024-08-0101 August 2024 Enclosure 19: Technical Basis Document, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Surveys at OCNGS Revision 0, February 14, 2024 ML24214A0782024-08-0101 August 2024 Enclosure 22: Tsd 24-055, Basement Fill Model: Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways, Revision 0 ML24214A0792024-07-0808 July 2024 Enclosure 23: Tsd 24-063, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways, Revision 0 ML24214A0482024-03-31031 March 2024 Enclosure 6: Oyster Creek Nuclear Generating Station Below Grade Structures Radiological Characterization Report Revision 1, March 2024 ML24214A0492024-03-0606 March 2024 Enclosure 7: ENG-OCS-002 Revision 1, RESRAD-Build Input Parameter Sensitivity Analysis - Ocs, March 6, 2024 ML24214A0642024-03-0606 March 2024 Enclosure 16: ENG-OCS-015 Revision: 1, Basement Fill Model: Calculation of Embedded Pipe Dcgl Values Oyster Creek Station, March 6, 2024 ML24214A0602024-03-0606 March 2024 Enclosure 14: ENG-OCS-013 Revision: 1, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways Oyster Creek Station, March 6, 2024 ML24214A0652024-02-20020 February 2024 Enclosure 17: ENG-OCS-016 Revision: 0, Calculation of Buried Pipe Dcgl Values Oyster Creek Station, February 20, 2024 ML24214A0722024-02-14014 February 2024 Enclosure 20, Oyster Creek 100 Year Land Use Outlook - Categorization and Justification, Ghd, February 9, 2024 ML24214A0582023-11-0101 November 2023 Enclosure 13: ENG-OCS-012 Revision: 0, Basement Fill Model Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways Oyster Creek, November 1, 2023 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML24214A0542023-07-26026 July 2023 Enclosure 11: ENG-OCS-008 Revision: 0, Derived Concentration Guideline Levels Values for Soil – Industrial Use Scenario Oyster Creek, July 26, 2023 ML24214A0532023-07-25025 July 2023 Enclosure 10: ENG-OCS-007 Revision 0, RESRAD-Onsite Probabilistic Analysis - Industrial Use Scenario Oyster Creek Station, July 25, 2023 ML24214A0442023-04-24024 April 2023 Enclosure 5: Oyster Creek Generating Station Radiological Characterization Report Revision 1, April 24, 2023 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML24214A0752022-09-0808 September 2022 Enclosure 21: Oyster Creek Hydrogeologic Investigation Report, September 8, 2022 ML24214A0572022-08-0404 August 2022 Enclosure 12, ENG-OCS-009 Revision: 0, Area Factors for Soil – Industrial Use Scenario, August 4, 2022 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML24214A0522022-04-14014 April 2022 Enclosure 9: ENG-OCS-006 Revision: 1, Area Factors for Use with Oyster Creek Dcgl Values for Buildings/Structures, April 14, 2022 ML24214A0512022-04-12012 April 2022 Enclosure 8: ENG-OCS-004 Revision 0, Resrad Building Surface Dcgl Values Oyster Creek, April 12, 2022 ML24214A0432022-01-17017 January 2022 Enclosure 4: Radionuclide Selection for Dcgl Development Oyster Creek Station Site Characterization Project, Revision 1, January 17, 2022 ML24214A0392021-11-30030 November 2021 Enclosure 3: Oyster Creek Station, Historical Site Assessment (Hsa) Revision 2, November 2021 ML21036A1692021-01-29029 January 2021 ISFSI Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan Supplemental Information ML20153A2282020-05-29029 May 2020 Biological Opinion for Oyster Creek Shutdown and Decommissioning ML19214A0452019-08-0202 August 2019 NRC to NMFS, Revised Proposed Action for Oyster Creek Endangered Species Act Section 7 Consultation ML19029B3332019-01-29029 January 2019 Security Inspection Plan for Oyster Creek Station - 2019 RA-18-084, Secondary Containment Capability Test2018-09-14014 September 2018 Secondary Containment Capability Test ML18033B7442018-02-21021 February 2018 Staff Assessment of the Response to 10 CFR 50.54(F) Information Request Flood-Causing Mechanism Reevaluation RA-17-032, Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 20162017-05-16016 May 2017 Submittal of Biennial 10 CFR 50.59 and 1 O CFR 72.48 Change Summary Reports - January 1, 2015 Through December 31, 2016 ML15350A3532016-02-17017 February 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force... RA-15-042, Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 20142015-05-26026 May 2015 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Reports - January 1, 2013 Through December 31, 2014 ML15093A2842015-02-23023 February 2015 Enclosure 2: Flood Hazard Reevaluation Report for Oyster Creek Nuclear Generating Station, Rev. 1 RA-14-078, Secondary Containment Capability Test2014-10-24024 October 2014 Secondary Containment Capability Test RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 RA-14-068, Sea Turtle Incidental Take Report 2014-32014-08-0101 August 2014 Sea Turtle Incidental Take Report 2014-3 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14065A2322014-06-16016 June 2014 Staff Assessment of Response to Enclosure 4 of the March 12, 2012, 10 CFR 50.54(F) Information Request - Flooding Walkdowns ML14030A5132014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14038A1112014-02-11011 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Oyster Creek Nuclear Generating Station, TAC No.: MF0824 NEI 99-04, Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 20122013-12-23023 December 2013 Oyster Creek Nuclear Generating Station, Commitment Change Summary Report - 2012 RA-13-127, Commitment Change Summary Report - 20122013-12-23023 December 2013 Commitment Change Summary Report - 2012 RA-13-088, Sea Turtle Incidental Take Report 2013-52013-09-0909 September 2013 Sea Turtle Incidental Take Report 2013-5 RA-13-074, Sea Turtle Incidental Take Reports 2013-1 and 2013-22013-08-0909 August 2013 Sea Turtle Incidental Take Reports 2013-1 and 2013-2 ML15093A2832013-07-0303 July 2013 Enclosure 1: Local Intense Precipitation Evaluation Report for Oyster Creek, Rev. 6 RS-12-177, E Plan for Future Seismic Walkdown of Inaccessible Equipment2013-04-26026 April 2013 E Plan for Future Seismic Walkdown of Inaccessible Equipment ML13120A1862013-04-0909 April 2013 Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal # 1 for the Oyster Creek Generating Station Correspondence No. RS- 2024-08-01 Category:Technical MONTHYEARML24269A0472024-10-0404 October 2024
[Table view]Enclosure 2, Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Pending Request for Additional Information ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24214A0782024-08-0101 August 2024 Enclosure 22: Tsd 24-055, Basement Fill Model: Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways, Revision 0 ML24214A0702024-08-0101 August 2024 Enclosure 19: Technical Basis Document, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Surveys at OCNGS Revision 0, February 14, 2024 ML24214A0692024-08-0101 August 2024 Enclosure 18: Technical Basis Document No. 24-01-12-2888 Revision 1, Dose Contribution from Insignificant Radionuclides in the Oyster Creek Site-Specific Suite of Radiological Nuclides, February 14, 2024 ML24214A0612024-08-0101 August 2024 Enclosure 15: ENG-OCS-014 Revision: 0, Basement Fill Model: Probabilistic Analysis for Embedded Pipes Scenario Oyster Creek Station, January 2024 ML24214A0792024-07-0808 July 2024 Enclosure 23: Tsd 24-063, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways, Revision 0 ML24214A0482024-03-31031 March 2024 Enclosure 6: Oyster Creek Nuclear Generating Station Below Grade Structures Radiological Characterization Report Revision 1, March 2024 ML24214A0602024-03-0606 March 2024 Enclosure 14: ENG-OCS-013 Revision: 1, Basement Fill Model: Calculation of Dcglw/F Values Assuming Industrial Use Scenario Exposure Pathways Oyster Creek Station, March 6, 2024 ML24214A0492024-03-0606 March 2024 Enclosure 7: ENG-OCS-002 Revision 1, RESRAD-Build Input Parameter Sensitivity Analysis - Ocs, March 6, 2024 ML24214A0642024-03-0606 March 2024 Enclosure 16: ENG-OCS-015 Revision: 1, Basement Fill Model: Calculation of Embedded Pipe Dcgl Values Oyster Creek Station, March 6, 2024 ML24214A0652024-02-20020 February 2024 Enclosure 17: ENG-OCS-016 Revision: 0, Calculation of Buried Pipe Dcgl Values Oyster Creek Station, February 20, 2024 ML24214A0722024-02-14014 February 2024 Enclosure 20, Oyster Creek 100 Year Land Use Outlook - Categorization and Justification, Ghd, February 9, 2024 ML24214A0582023-11-0101 November 2023 Enclosure 13: ENG-OCS-012 Revision: 0, Basement Fill Model Probabilistic Analysis for Instantaneous Release Scenario Assuming Industrial Use Exposure Pathways Oyster Creek, November 1, 2023 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML24214A0542023-07-26026 July 2023 Enclosure 11: ENG-OCS-008 Revision: 0, Derived Concentration Guideline Levels Values for Soil – Industrial Use Scenario Oyster Creek, July 26, 2023 ML24214A0532023-07-25025 July 2023 Enclosure 10: ENG-OCS-007 Revision 0, RESRAD-Onsite Probabilistic Analysis - Industrial Use Scenario Oyster Creek Station, July 25, 2023 ML24214A0442023-04-24024 April 2023 Enclosure 5: Oyster Creek Generating Station Radiological Characterization Report Revision 1, April 24, 2023 ML24214A0752022-09-0808 September 2022 Enclosure 21: Oyster Creek Hydrogeologic Investigation Report, September 8, 2022 ML24214A0572022-08-0404 August 2022 Enclosure 12, ENG-OCS-009 Revision: 0, Area Factors for Soil – Industrial Use Scenario, August 4, 2022 ML24214A0522022-04-14014 April 2022 Enclosure 9: ENG-OCS-006 Revision: 1, Area Factors for Use with Oyster Creek Dcgl Values for Buildings/Structures, April 14, 2022 ML24214A0512022-04-12012 April 2022 Enclosure 8: ENG-OCS-004 Revision 0, Resrad Building Surface Dcgl Values Oyster Creek, April 12, 2022 ML24214A0432022-01-17017 January 2022 Enclosure 4: Radionuclide Selection for Dcgl Development Oyster Creek Station Site Characterization Project, Revision 1, January 17, 2022 ML24214A0392021-11-30030 November 2021 Enclosure 3: Oyster Creek Station, Historical Site Assessment (Hsa) Revision 2, November 2021 ML21036A1692021-01-29029 January 2021 ISFSI Only Security Plan, Training Qualification Plan, Safeguards Contingency Plan Supplemental Information ML20153A2282020-05-29029 May 2020 Biological Opinion for Oyster Creek Shutdown and Decommissioning ML19214A0452019-08-0202 August 2019 NRC to NMFS, Revised Proposed Action for Oyster Creek Endangered Species Act Section 7 Consultation RA-18-084, Secondary Containment Capability Test2018-09-14014 September 2018 Secondary Containment Capability Test ML15093A2842015-02-23023 February 2015 Enclosure 2: Flood Hazard Reevaluation Report for Oyster Creek Nuclear Generating Station, Rev. 1 RA-14-078, Secondary Containment Capability Test2014-10-24024 October 2014 Secondary Containment Capability Test RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14030A5132014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14038A1112014-02-11011 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Oyster Creek Nuclear Generating Station, TAC No.: MF0824 ML15093A2832013-07-0303 July 2013 Enclosure 1: Local Intense Precipitation Evaluation Report for Oyster Creek, Rev. 6 RS-12-177, E Plan for Future Seismic Walkdown of Inaccessible Equipment2013-04-26026 April 2013 E Plan for Future Seismic Walkdown of Inaccessible Equipment ML13120A1862013-04-0909 April 2013 Enclosure 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic Updated Transmittal # 1 for the Oyster Creek Generating Station Correspondence No. RS- ML12355A1422012-12-31031 December 2012 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2 RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 22012-12-31031 December 2012 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 1 of 2 RS-12-217, 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 22012-12-31031 December 2012 2012 Oyster Creek Nuclear Generating Station Emergency Planning Zone Evacuation Time Estimates Analysis. Part 2 of 2 RA-12-117, Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-19019 November 2012 Company, Llc'S 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12359A0062012-11-0606 November 2012 Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 3 of 4 ML12359A0052012-11-0606 November 2012 Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 2 of 4 ML12359A0082012-11-0606 November 2012 Rev. 1 to Report 12Q0108.80-R-001,Seismic Walkdown Report in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Oyster Creek Generating Station Unit 1. Part 1 of 4 RS-13-065, Core Spray/Auto Depress'N System Relay Logic Panel2012-10-10010 October 2012 Core Spray/Auto Depress'N System Relay Logic Panel RA-13-022, D Area Walk-By Checklists (Awcs)2012-10-10010 October 2012 D Area Walk-By Checklists (Awcs) ML1016001862010-06-23023 June 2010 Final ASP Analysis - Oyster Creek ML1007401482010-02-24024 February 2010 Attachment 9 Micro ALARA Plan Work Sheet, Rev. 9 ML1007004922010-02-24024 February 2010 Reportable Event Rad 1.34, Rev. 10 ML1007004932010-02-24024 February 2010 Reportable Event Rad 1.4, Rev. 10 2024-08-01 |
Text
ExetonGeneration Technical "S 4.5.G October 24, 2014 RA-14-078 U. S. Nuclear Regulatory Commission Atn: Document Control Desk Washington, DC 20655 - 0001 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. OPR-16 NRC DgM No. &al2l
Subject:
Secondary Containmen Capability Test The Oyser Creok Nuclear Generating Station TemhnicM Spoecification 4.5.G.4 requires that the results of the secondary containment capability taot shall be in the subject of a summary technioal reprt,.. The Attablmnt to ft letter provides the 1R25 Outage test resubt, a required.&Theattached results deonswtr.ed that the scondary contalinmnt capability tos success om.fisfied fh technical specifcation requkwient and prerequisits.
Ifany futher Informain or assistance Is needed, please contact Igor Alev at 609.971-2306. . -.,. :- ':,. ,w. ,...
sincerely, /
2(
Michael McKenn-*'
Regulator Assurance Manager, Oyster Creek Nuclear Generating Station
.3 AMachment cc: Administrator, USNRC Region I ;. o USNRC Sen or#Pr.oJM Manager, Oyster Creek '.'
- "*USNRC SeiorResident Inspector, Oyster Creek. *"
'.5,.-. - -
".' ;. is. -
rji, .' "
'I
Attachment Summary Technical report Secondary Containment Capability Test Oyster Creek Nuclear Generating Station Operating Cycle 23; Prior to Refueling Outage 1R25 Date Performed: September 6, 2014
- 1. Wind Speed Test Prerequisite Observed
"... calm wind ... " 8.3 mph
- 2. Standby Gas Treatment System Flow Rate Test Requirement Recorded
< 4000 cfm 2690 cfm
- 3. Reactor Building Differential Pressure Test Requirements Test Results Both Railroad Airlock Doors Closed
> - 0.25 inches W. G. vacuum -0.352 inches W. G.
Outer Railroad Airlock Door Open
>- 0.25 inches W. G. vacuum -0.337 inches W. G.
Inner Railroad Airlock Door Open
> - 0.25 inches W. G. vacuum -0.318 inches W. G.