RS-13-065, Core Spray/Auto Depress'N System Relay Logic Panel
| ML13120A187 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 10/10/2012 |
| From: | Stephen Baker, Etre M Exelon Generation Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| RS-12-177, RA-13-022, RS-13-065 12Q0108.80-R-001, Rev 1 | |
| Download: ML13120A187 (225) | |
Text
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: *-7 N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: ER18A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CORE SPRAY/AUTO DEPRESS'N SYSTEM RELAY LOGIC PANEL Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 12 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-87
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: ER18A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CORE SPRAY/AUTO DEPRESS'N SYSTEM RELAY LOGIC PANEL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-ER-18A Rev 1 Calculation C-1 302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-88
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: ER1 8A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CORE SPRAY/AUTO DEPRESS'N SYSTEM RELAY LOGIC PANEL Photos I_
MG 0907 MG_0908 MG_0910 C-89
12Q0O108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-56-4 Equipment Class: (9) Fans Equipment
Description:
"A" 480 SWGR RM SUPPLY FAN Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 14 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-90
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-56-4 Equipment Class: (9) Fans Equipment
Description:
"A" 480 SWGR RM SUPPLY FAN Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-FN-56-0004 Rev 00 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-91
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-56-4 Equipment Class: (9) Fans Equipment
Description:
"A" 480 SWGR RM SUPPLY FAN Photos MG_0981 MG_0982 C-92
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-1 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 16 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-93
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: MZ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-1 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-ER-732-092 Rev 00 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-94
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-1 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Photo IMG_1001 C-95
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M-j N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-2 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 16 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-96
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-2 Equipment Class: (9) Fans Equipment
Description:
UISS 1A2-460V TRANSFORMER COOLING FAN Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-ER-732-092 Rev 00 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-97
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-2 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Photo M1G_1002 C-98
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-3 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 16 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-99
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-3 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-ER-732-092 Rev 00 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-100
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-3 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Photo IG_1005 C-101
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: FYI N U Seismic Walkdown Checklist (SWC)
EquipmentlD No.: H-18-1C Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
AUGMENTED SPENT FUEL POOL HEAT EXCHANGER(NN02-C)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-102
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentlD No.: H-18-1C Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
AUGMENTED SPENT FUEL POOL HEAT EXCHANGER(NN02-C)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Augmented Spent Fuel Pool Cooling System Qualification. C-1 302-251-5320-009, Dated 6/11/1984.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-103
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: H-18-1C Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
AUGMENTED SPENT FUEL POOL HEAT EXCHANGER(NN02-C)
Photos MG 1246 MG_1247 MG_1 248 C-104
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: H-21-1A Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
CONTAINMENT SPRAY SYS HEAT EXCHANGER 1-1 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-105
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: H-21-1A Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
CONTAINMENT SPRAY SYS HEAT EXCHANGER 1-1 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Supports are consistent with Calculation C-1 302-241-E310-107 Rev 0 Surface Oxidation on Bolts at the Base Plates. The degraded bolts had previously been identified in 2000 and is being tracked by IR 1403183. Gusset plates were added to the Heat Exchanger base to make up for the deficient bolts. The gusset plate modifications are detailed in Calculation C-1302-241-E310-107 Rev 0 Movable security barrier adjacent to the Heat Exchanger is chained to the column and chalked.
See Seismic Qualification SQ-OC-H-21-001A Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-106
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: H-2 1-1A Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
CONTAINMENT SPRAY SYS HEAT EXCHANGER 1-1 Photos MG 0704 MG_0706 MG_0711 MG_0720 C-107
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 4 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IP-4 Equipment Class: (14) Distribution Panels Equipment
Description:
120VAC INSTRUMENT PANEL 4 - 208/120V,3PH,4W Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 12 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-108
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IP-4 Equipment Class: (14) Distribution Panels Equipment
Description:
120VAC INSTRUMENT PANEL 4 - 208/120V,3PH,4W Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-IP-4, Rev 000 Verification of anchorage by feeling bolts in Unistrut Calculation C-1302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-109
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IP-4 Equipment Class: (14) Distribution Panels Equipment
Description:
120VAC INSTRUMENT PANEL 4 - 208/120V,3PH,4W Photos MG 0883 MG_0884 MG_0885 C-110
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IP-4 Equipment Class: (14) Distribution Panels Equipment
Description:
120VAC INSTRUMENT PANEL 4 - 208/120V,3PH,4W SQUGSEWS SQUG SEWS EBASCO TWO SERVICES INCORPORATED WOrd TNado Cenler.NewYork.N.Y. 0G045 E CC 4
April 29, 1981 CPU Services Incorporated Attention: Mr. Leon Caribian 100 Interpace Parkway Parsippany, NJ 07054
Dear Leon:
Re: OYSTER CREEK NUCLEAR STATION FINAL SUBMITTAL OF MASONRY WALL EVALUATION CALCULATION BOOKS I am sending to you together with this letter,20 volumes of calculation books and 11 volumes of computer output. This will mark the end of our 0 involvement for the re-evaluation of the Safety-Related Concrete Masonry Walls as required by NRC IE Bulletin 80-11.
Should you have any questions regarding the calculations and sketches, please do not hestitate to call. We will be glad to help.
Very truly yours, E Odar Assistant Chief Civil Engineer GW:dl cc: K D Chin G Wu C1302X322CA06 VOL 1, 19810427, REEVALUATION OF CONCRETE MASONRY WALL NRC IE BULLETIN 80-11 GENERAL C-111
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IT-4A Equipment Class: (4) Transformers Equipment
Description:
TRANSFORMER FROM MCC 1A2-460V TO IP-4 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 12 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-112
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IT-4A Equipment Class: (4) Transformers Equipment
Description:
TRANSFORMER FROM MCC 1A2-460V TO IP-4 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-IT-4A Rev 0 Calculation C-1302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-113
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 4 Status: M-i N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IT-4A Equipment Class: (4) Transformers Equipment
Description:
TRANSFORMER FROM MCC 1A2-460V TO IP-4 Photos I
MG_0888 MG_0891 MG_0893 C-114
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 4 of 4 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IT-4A Equipment Class: (4) Transformers Equipment
Description:
TRANSFORMER FROM MCC 1A2-460V TO IP-4 SQUG SEW EBASCO SERVICES INCORPORATED Tvo World Tade Cerer. New York. N.Y 10048 4
April 29, 1981 GPU Services Incorporated Attention: Mr. Leon Garibian 100 Interpace Parkway Parsippany, NJ 07054
Dear Leon:
Re: OYSTER CREEK NUCLEAR STATION FINAL SUBMITTAL OF MASONRY WALL EVALUATION CALCULATION BOOKS I am sending to you together with this letter, 20 volumes of calculation books and 11 volumes of computer output. This will mark the end of our involvement for the re-evaluation of the Safety-Related Concrete Masonry Walls as required by NRC IE Bulletin 80-11.
Should you have any questions regarding the calculations and sketches, please do not hestitate to call. We will be glad to help.
Very truly yours, E Odar '/
Assistant Chief Civil Engineer GW:dl cc: K D Chiu G Wo C1302X322CA06 VOL 1, 19810427, REEVALUATION OF CONCRETE MASONRY WALL NRC IE BULLETIN 80-11 GENERAL C-115
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [7] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LI-18-170 Equipment Class: (18) Instruments on Racks Equipment
Description:
SKIMMER SURGE TANK'A'FUEL POOL LEVEL INDICATOR Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 119.00 ft, 20 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-116
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LI-1 8-170 Equipment Class: (18) Instruments on Racks Equipment
Description:
SKIMMER SURGE TANK'A'FUEL POOL LEVEL INDICATOR Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-Line/Free Standing See VM-OC-0157 Rev 4 Dresser Part Number 60-1379AS-021 15 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-117
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LI-1 8-170 Equipment Class: (18) Instruments on Racks Equipment
Description:
SKIMMER SURGE TANK'A'FUEL POOL LEVEL INDICATOR Photo MG_1229 MG_1231 C-118
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LIS-RE0018A Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW LEVEL INDICATING SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-119
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LIS-RE0018A Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW LEVEL INDICATING SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-120
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LIS-RE0018C Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW LEVEL INDICATING SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-121
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LIS-RE0018C Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW LEVEL INDICATING SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-122
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-53B Equipment Class: (18) Instruments on Racks Equipment
Description:
SPENT FUEL POOL LOW WATER LEVEL SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 119.00 ft, 20 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-123
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-53B Equipment Class: (18) Instruments on Racks Equipment
Description:
SPENT FUEL POOL LOW WATER LEVEL SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See VM-OC-5740 Rev 1 Mercoid PG-3-P1 Evaluated by: / Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-124
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: E-i N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-53B Equipment Class: (18) Instruments on Racks Equipment
Description:
SPENT FUEL POOL LOW WATER LEVEL SWITCH Photos MG_1237 MG_1238 C-125
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-1OB Equipment Class: (0) Other Equipment
Description:
LO-LO LEVEL (START NORMAL PUMP) ON TANK T-39-003 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-126
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-10B Equipment Class: (0) Other Equipment
Description:
LO-LO LEVEL (START NORMAL PUMP) ON TANK T-39-003 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 In-Line equipment Evaluated by: / Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-127
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-10B Equipment Class: (0) Other Equipment
Description:
LO-LO LEVEL (START NORMAL PUMP) ON TANK T-39-003 Photo 1MG_1 141 C-128
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-10C Equipment Class: (0) Other Equipment
Description:
HI-HI LEVEL(PUMP CUT-OFF) ON TANK T-39-003 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-129
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-1OC Equipment Class: (0) Other Equipment
Description:
HI-HI LEVEL(PUMP CUT-OFF) ON TANK T-39-003 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 In-Line equipment Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-130
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-10C Equipment Class: (0) Other Equipment
Description:
HI-HI LEVEL(PUMP CUT-OFF) ON TANK T-39-003 Photo IMG_1141 C-131
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LSP-1A2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
LOCAL SHUTDOWN PANEL- USS 1A2 PUMP/BREAKER CONTROL Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 16 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-132
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LSP-1A2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
LOCAL SHUTDOWN PANEL- USS 1A2 PUMP/BREAKER CONTROL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-LSP-1A2 Rev 02 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-133
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LSP-1A2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
LOCAL SHUTDOWN PANEL- USS 1A2 PUMP/BREAKER CONTROL Photos Photos MG 1009 MG 1010 MG_1011 MG_1015 C-134
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LT-RE0005B Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW WATER LEVEL REACTOR SCRAM Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 17 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-135
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LT-RE0005B Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW WATER LEVEL REACTOR SCRAM Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK02 Rev 00 Horizontal Hairline linear indications (Cracks) on Drywell exterior behind RK02. Acceptable per review of the guidelines of ACI-349 guidelines.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-136
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: M-39-1 Equipment Class: (17) Engine-Generators Equipment
Description:
EMERGENCY DIESEL GENERATOR #1 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-137
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [f N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: M-39-1 Equipment Class: (17) Engine-Generators Equipment
Description:
EMERGENCY DIESEL GENERATOR #1 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 C-1302-157-5320-006, Rev. 0 qualifies the unanchored Diesels.
Base Corrosion is being tracked by the Plant.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-138
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: M-39-1 Equipment Class: (17) Engine-Generators Equipment
Description:
EMERGENCY DIESEL GENERATOR #1 Photo IMG_1134 C-139
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: P-18-1B Equipment Class: (5) Horizontal Pumps Equipment
Description:
SPENT FUEL POOL COOLING PUMP (NN01-B)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-140
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-18-16 Equipment Class: (5) Horizontal Pumps Equipment
Description:
SPENT FUEL POOL COOLING PUMP (NN01-B)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See drawing W-65107-R4 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-141
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-1 8-1 B Equipment Class: (5) Horizontal Pumps Equipment
Description:
SPENT FUEL POOL COOLING PUMP (NN01-B)
Photo MG_1255 C-142
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-18-1C Equipment Class: (5) Horizontal Pumps Equipment
Description:
AUGMENTED SPENT FUEL POOL PUMP (NN01-C)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-143
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: P-18-1C Equipment Class: (5) Horizontal Pumps Equipment
Description:
AUGMENTED SPENT FUEL POOL PUMP (NN01-C)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Augmented Spent Fuel Pool Cooling System Qualification. C-1302-251-5320-008, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-144
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-18-1C Equipment Class: (5) Horizontal Pumps Equipment
Description:
AUGMENTED SPENT FUEL POOL PUMP (NN01-C)
Photos MG 1290 MG_1291 MG_1293 C-145
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP NZ01-A Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 19.00 ft, 18 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-146
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP NZ01-A Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Drawing X-8X21AL86X6-A See Drawing 4074-5 Sheet 2 See Seismic Qualification SQ-OC-P-20-001A Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-147
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: - N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP NZ01-A Photos MG 1021 MG_1023 MG_1024 C-148
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A (NZ01A)
Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP "A" - SYS. I Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 19.00 ft, 18 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-149
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A (NZ01A)
Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP "A" - SYS. I Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Drawing X-8X21AL86X6-A See Drawing 4074-5 Sheet 2 See Seismic Qualification SQ-OC-P-20-001A Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-150
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A (NZ01A)
Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP "A" - SYS. I Photos Mn 10391 MG_1023 MG_1024 C-151
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-2A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY BOOSTER PUMP NZ03-A Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-152
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-2A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY BOOSTER PUMP NZ03-A Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-P-20-002A Rev 1 Anchorage details shown on drawing 4074-4 Rev. 4 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-153
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-2A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY BOOSTER PUMP NZ03-A Photos MG 0663 MG_0670 MG_0671 C-154
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: I- N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-3-3A Equipment Class: (6) Vertical Pumps Equipment
Description:
EMERGENCY SERVICE WATER PUMP 1-1 (52A)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): IS, 6.00 ft, 04 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-155
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-3-3A Equipment Class: (6) Vertical Pumps Equipment
Description:
EMERGENCY SERVICE WATER PUMP 1-1 (52A)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Proximity to handrail is not a seismic interaction issue due to the relatively low mass of the handrail.
See Seismic Qualification No. SQ-OC-P-3-003A Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-156
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-3-3A Equipment Class: (6) Vertical Pumps Equipment
Description:
EMERGENCY SERVICE WATER PUMP 1-1 (52A)
Photos P-3-3A
- Ii I MG_1215 MG_1217 MG_1221 C-157
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-13 Equipment Class: (5) Horizontal Pumps Equipment
Description:
FUEL OIL PUMP TO DAY TANK T-39-3 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-158
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-13 Equipment Class: (5) Horizontal Pumps Equipment
Description:
FUEL OIL PUMP TO DAY TANK T-39-3 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-159
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-13 Equipment Class: (5) Horizontal Pumps Equipment
Description:
FUEL OIL PUMP TO DAY TANK T-39-3 Photos MG_1175 MG_1178 C-160
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-17 Equipment Class: (5) Horizontal Pumps Equipment
Description:
DIESEL GENERATOR UNIT #1 ENGINE DRIVEN FUEL PUMP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-161
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-17 Equipment Class: (5) Horizontal Pumps Equipment
Description:
DIESEL GENERATOR UNIT #1 ENGINE DRIVEN FUEL PUMP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-162
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: L-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-17 Equipment Class: (5) Horizontal Pumps Equipment
Description:
DIESEL GENERATOR UNIT #1 ENGINE DRIVEN FUEL PUMP Photo 1MG_1161 C-163
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-19 Equipment Class: (5) Horizontal Pumps Equipment
Description:
M-39-1 LEFT BEARING COOLING WATER PUMP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors'? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-164
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-19 Equipment Class: (5) Horizontal Pumps Equipment
Description:
M-39-1 LEFT BEARING COOLING WATER PUMP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 In-Line equipment Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-165
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-19 Equipment Class: (5) Horizontal Pumps Equipment
Description:
M-39-1 LEFT BEARING COOLING WATER PUMP Photos MG_1166 MG_1167 C-166
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-25 Equipment Class: (5) Horizontal Pumps Equipment
Description:
AC TURBO LUBE OIL PUMP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 02 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-167
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-25 Equipment Class: (5) Horizontal Pumps Equipment
Description:
AC TURBO LUBE OIL PUMP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification No. SQ-OC-M-39-002 Oil leak is Yellow tagged.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-168
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-25 Equipment Class: (5) Horizontal Pumps Equipment
Description:
AC TURBO LUBE OIL PUMP Photo IG_1205 C-169
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: IiZ] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P1-18-82 Equipment Class: (18) Instruments on Racks Equipment
Description:
AUGMENTED SFP COOLING PMP NN01-C DISCHARGE PRESSURE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-170
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P1-18-82 Equipment Class: (18) Instruments on Racks Equipment
Description:
AUGMENTED SFP COOLING PMP NN01-C DISCHARGE PRESSURE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments US Guage CO. Figure 1980 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-171
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P1-18-82 Equipment Class: (18) Instr uments on Racks Equipment
Description:
AUGMEI` *ITED SFP COOLING PMP NN01-C DISCHARGE PRESSURE Photos MG_1315 MG_1316 C-172
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\06-15 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-173
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\06-15 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 J- Seth Baker 10/10/12 C-174
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: L N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\06-15 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Photo
-IMG_0752 C-175
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\26-03 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-176
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\26-03 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-177
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\26-03 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Photos MG_0778 C-178
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-1 Equipment Class: (4) Transformers Equipment
Description:
480/120VAC TRANSFORMER TO PROTECTION SYS PANELS 1&2 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): TB, 36.00 ft, 24 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-179
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-1 Equipment Class: (4) Transformers Equipment
Description:
480/120VAC TRANSFORMER TO PROTECTION SYS PANELS 1&2 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-180
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-I Equipment Class: (4) Transformers Equipment
Description:
480/120VAC TRANSFORMER TO PROTECTION SYS PANELS 1&2 Photos MG_1103 MG_1106 C-181
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-1 8-79 Equipment Class: (18) Instruments on Racks Equipment
Description:
ASFP COOLING PUMP NN01-C LOW SUCTION PRESSURE TRIP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-182
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-18-79 Equipment Class: (18) Instruments on Racks Equipment
Description:
ASFP COOLING PUMP NN01-C LOW SUCTION PRESSURE TRIP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments B070 BARKSDALE CONTROL MODEL D1T-M18SS Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-183
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: F] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-1 8-79 Equipment Class: (18) Instruments on Racks Equipment
Description:
ASFP COOLING PUMP NNO1-C LOW SUCTION PRESSURE TRIP Photo MG_1304 C-184
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-IA0083A Equipment Class: (18) Instruments on Racks Equipment
Description:
EMRV NR108A HIGH PRESSURE SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-185
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-IA0083A Equipment Class: (18) Instruments on Racks Equipment
Description:
EMRV NR108A HIGH PRESSURE SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/15/12 J Seth Baker 10/15/12 C-186
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-IA0083C Equipment Class: (18) Instruments on Racks Equipment
Description:
EMRV NR108C HIGH PRESSURE SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 17 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-187
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: [-Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-IA0083C Equipment Class: (18) Instruments on Racks Equipment
Description:
EMRV NR108C HIGH PRESSURE SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK02 Rev 00 Horizontal Hairline linear indications (Cracks) on Drywell exterior behind RK02. Acceptable per review of the guidelines of ACI-349 guidelines.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-188
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RE0017A Equipment Class: (18) Instruments on Racks Equipment
Description:
LOW REACTOR PRESS. SWITCH READIES CORE SPRAY VALVES Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-189
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M-* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RE0017A Equipment Class: (18) Instruments on Racks Equipment
Description:
LOW REACTOR PRESS. SWITCH READIES CORE SPRAY VALVES Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-190
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RV0046A Equipment Class: (18) Instruments on Racks Equipment
Description:
DRYWELL HIGH PRESSURE SWITCH-AUTO STARTS PUMPS Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-191
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RV0046A Equipment Class: (18) Instruments on Racks Equipment
Description:
DRYWELL HIGH PRESSURE SWITCH-AUTO STARTS PUMPS Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQUG SEWS (SQ-OC-RK03) Rev 000 See Seismic Qualification SQ-OC-PS-RV0046A Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-192
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: r N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RV0046A Equipment Class: (18) Instruments on Racks Equipment
Description:
DRYWELL HIGH PRESSURE SWITCH-AUTO STARTS PUMPS Photo IMG-0685 C-193
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-1 Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR PROTECTION SYSTEM 1A,2A INSTRUMENT RACK A,B Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-194
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: [Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-1 Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR PROTECTION SYSTEM 1A,2A INSTRUMENT RACK A,B Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-195
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-3 Equipment Class: (18) Instruments on Racks Equipment
Description:
INSTRUMENT RACK RECIRC'N PUMP REACTOR PROTECTION Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-196
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [-* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-3 Equipment Class: (18) Instruments on Racks Equipment
Description:
INSTRUMENT RACK RECIRCN PUMP REACTOR PROTECTION Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQUG SEWS (SQ-OC-RK03) Rev 000 Missing bolt is addressed in SQUG SEWS (SQ-OC-RK03) and determined to be seismically adequate in the current configuration.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-197
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-3 Equipment Class: (18) Instruments on Racks Equipment
Description:
INSTRUMENT RACK RECIRCN PUMP REACTOR PROTECTION Photos MG 0679 MG_0680 MG_0694 C-198
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: ROTARY INVERTER\AC Equipment Class: (13) Motor-Generators Equipment
Description:
AC GENERATOR FOR 120V AC SUPPLY FOR CIP-3 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): OB, 35.00 ft, 05 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-199
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: ]-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: ROTARY INVERTER\AC Equipment Class: (13) Motor-Generators Equipment
Description:
AC GENERATOR FOR 120V AC SUPPLY FOR CIP-3 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Horizontal restraint modification is consistent with SQUG SEWS and drawings identified within SEWS.
See Seismic Qualification No. SQ-OC-ROTARY INVERTER\AC Nearby masonry block Wall is braced. Calculation C-1302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-200
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: ROTARY INVERTER\AC Equipment Class: (13) Motor-Generators Equipment
Description:
AC GENERATOR FOR 120V AC SUPPLY FOR CIP-3 Photos MG 1113 MG 1115 MG_1116 MG_1118 C-201
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-202
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: MI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-203
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: L N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Photo IMG-0755 C-204
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-205
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1 302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-206
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Photo IMG-0762 C-207
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 2) (South)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-208
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: 1-Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 2) (South)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-209
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 2) (South)
Photo AG_0817 C-210
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: r] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-07 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 3) (South)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-211
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-07 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 3) (South)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
See Calculation's C-1 302-225-E310-049, Rev. 0 and C-1 302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-212
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-07 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 3) (South)
Photo IMG-0802 C-213
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-214
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-215
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (North)
Photo IMG_0756 C-216
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: i-l N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (South)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-217
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: MI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (South)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-218
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Ml N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (South)
Photo OG_0822 C-219
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-220
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-221
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121 \06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Photo MG_0760 C-222
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-223
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1 302-225-E310-049, Rev. 0 and C-1 302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-224
12Q0108.80-R-OO1, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Photo
.IMG-0763 C-225
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-2 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR FUEL OIL STORAGE TANK Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 18.00 ft, 03 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-226
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 4 Status: F-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-2 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR FUEL OIL STORAGE TANK Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-T-39-002 Rev 1 Evaluated by: 01T'HO Wing Ho Date: 10/10/12 j Seth Baker 10/10/12 C-227
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-2 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR FUEL OIL STORAGE TANK Photos MG_4172 MG_4174 C-228
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 4 of 4 Status: r] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-2 Equipment Class: (21) Tanks and Heat Exchangers Pni inmanf I-ac,-rinfinn-DIESEL GENERATOR FUEL OIL STORAGE TANK Mr. 4175 MG_4178 MG_4179 C-229
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-3 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR UNIT #1 FUEL OIL DAY TANK Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-230
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-3 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR UNIT #1 FUEL OIL DAY TANK Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 J 'le Seth Baker 10/10/12 C-231
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-3 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR UNIT #1 FUEL OIL DAY TANK Photos MG_1137 MG_1138 C-232
12Q0108.80-R-O01, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-5 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
M-39-1 COOLING WATER TANK Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-233
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-5 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
M-39-1 COOLING WATER TANK Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-234
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-5 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
M-39-1 COOLING WATER TANK Photos MG 1153 MG_1155 MG_1157 C-235
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: TI-18-267 Equipment Class: (19) Temperature Sensors Equipment
Description:
ASFP HEAT EXCHANGER NN02C OUTLET TEMPERATURE Project: Oyster Creek SWEL Location (BIdg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-236
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: TI-18-267 Equipment Class: (19) Temperature Sensors Equipment
Description:
ASFP HEAT EXCHANGER NN02C OUTLET TEMPERATURE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-237
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: TI- 18-267 Equipment Class: (19) Temperature Sensors Equipment
Description:
ASFP HEAT EXCHANGER NN02C OUTLET TEMPERATURE Photo MiG_1294 C-238
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: MZ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-120 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SOUTH SCRAM DISCHARGE HDR VENT VALVE(NC53-A)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-239
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-120 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SOUTH SCRAM DISCHARGE HDR VENT VALVE(NC53-A)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments The Valve is Consistant with BS&B Service Instruction Manual for Diaphram Control Valves NS 106 page 2 See Seismic Qualification SQ-OC-V-15-0120 Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-240
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-120 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SOUTH SCRAM DISCHARGE HDR VENT VALVE(NC53-A)
Photo MG_0834 C-241
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-133 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
NORTH SCRAM DISCHG VOLUME DRAIN VALVE(NC52-A)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-242
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-133 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
NORTH SCRAM DISCHG VOLUME DRAIN VALVE(NC52-A)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments The Valve is Consistant with Flowserve Drawing 94-16252 Rev D See Seismic Qualification SQ-OC-V-15-0133 Rev 0 RTD for V-6-2917 touches valve V-1 5-133. Not an operability issue due to the relative low mass od V-6-2917 and the brass piping which is highly ductile. IR 01403039 Documents- Seismic interaction between valves V-15-133 and V-6-2917.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-243
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 5-133 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
NORTH SCRAM DISCHG VOLUME DRAIN VALVE(NC52-A)
Photos MG 0714 MG_0715 MG_0716 C-244
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Mul N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-1 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOP A PUMP SUCTION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 38.00 ft, 22 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-245
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-1 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOP 'A' PUMP SUCTION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Drawing 93-14360 Rev c Evaluated by: Wing Ho Date: 10/10/12 Seth Baker 10/10/12 C-246
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-1 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOP A PUMP SUCTION VALVE Photos MG_4182 MG_4183 MG_4184 C-247
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-212 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOPA' OUTLET HEADER VENT VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 23 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-248
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-212 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOPA' OUTLET HEADER VENT VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEE CONVAL DRAWING 10G2-105 REV B Evaluated by: O)A" Wing Ho Date: 10/10/12 Seth Baker 10/10/12 C-249
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-212 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOPA' OUTLET HEADER VENT VALVE Photos MG_4194 MG_4195 C-250
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-112 Equipment Class: (0) Other Equipment
Description:
ASFP COOLING PUMP NN01-D CASING VENT VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-251
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-112 Equipment Class: (0) Other Equipment
Description:
ASFP COOLING PUMP NN01-D CASING VENT VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-252
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-112 Equipment Class: (0) Other Equipment
Description:
ASFP COOLING PUMP NN01-D CASING VENT VALVE Photo Photo VG_1308 C-253
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-1266 Equipment Class: (0) Other Equipment
Description:
FUEL POOL MAKEUP ISOLATION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-254
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: LY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-1266 Equipment Class: (0) Other Equipment
Description:
FUEL POOL MAKEUP ISOLATION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
3" Globe Valve Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-255
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-1266 Equipment Class: (0) Other Equipment
Description:
FUEL POOL MAKEUP ISOLATION VALVE Photo 1258 C-256
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M-* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-19 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL COOLING OUTLET VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-257
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-19 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL COOLING OUTLET VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation C-1 302-251-5320-011 Dated 25 Sept 1984 See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-258
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: EIY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-19 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL COOLING OUTLET VALVE Photos MG_1264 MG_1265 C-259
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-2 Equipment Class: (0) Other Equipment
Description:
AUGMENTED SPENT FUEL POOL SYSTEM INLET VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-260
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-2 Equipment Class: (0) Other Equipment
Description:
AUGMENTED SPENT FUEL POOL SYSTEM INLET VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation C-1302-251-5320-011 Dated 25 Sept 1984 See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-261
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-2 Equipment Class: (0) Other Equipment
Description:
AUGMENTED SPENT FUEL POOL SYSTEM INLET VALVE Photos Photos MG_1300 MG_1302 C-262
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-3 Equipment Class: (0) Other Equipment
Description:
SFP COOLING PUMP (NN01-A) SUCTION ISOLATION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-263
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-3 Equipment Class: (0) Other Equipment
Description:
SFP COOLING PUMP (NN01-A) SUCTION ISOLATION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation C-1302-251-5320-011 Dated 25 Sept 1984 See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-264
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-3 Equipment Class: (0) Other Equipment
Description:
SFP COOLING PUMP (NN01-A) SUCTION ISOLATION VALVE Photo Photo MG_1251 C-265
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: EZ] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-47 Equipment Class: (0) Other Equipment
Description:
DRAIN FROM REACTOR WELL BACK TO FUEL POOL PUMPS Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-266
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-47 Equipment Class: (0) Other Equipment
Description:
DRAIN FROM REACTOR WELL BACK TO FUEL POOL PUMPS Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation C-1 302-251-5320-011 Dated 25 Sept 1984 See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-267
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-47 Equipment Class: (0) Other Equipment
Description:
DRAIN FROM REACTOR WELL BACK TO FUEL POOL PUMPS Photo 1249 C-268
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-74 Equipment Class: (0) Other Equipment
Description:
AUGMENTE FUEL POOL CLG PUMP NN01-D DISCHARGE VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-269
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-74 Equipment Class: (0) Other Equipment
Description:
AUGMENTE FUEL POOL CLG PUMP NN01-D DISCHARGE VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-270
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-74 Equipment Class: (0) Other Equipment
Description:
AUGMENTE FUEL POOL CLG PUMP NN01-D DISCHARGE VALVE Photos IMG_1296 IMG-1297 C-271
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-80 Equipment Class: (0) Other Equipment
Description:
P1-18-88 ISOLATION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-272
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-80 Equipment Class: (0) Other Equipment
Description:
P1-18-88 ISOLATION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-273
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: L N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-80 Equipment Class: (0) Other Equipment
Description:
P1-18-88 ISOLATION VALVE Photo IMG_1313 C-274
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: MI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-81 Equipment Class: (0) Other Equipment
Description:
PS-18-0080 ISOLATION ROOT VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-275
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-81 Equipment Class: (0) Other Equipment
Description:
PS-18-0080 ISOLATION ROOT VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-276
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-81 Equipment Class: (0) Other Equipment
Description:
PS-18-0080 ISOLATION ROOT VALVE Photo IMG 1306 C-277
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-88 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FPC SYSTEM VENT VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-278
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-88 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FPC SYSTEM VENT VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-279
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-88 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FPC SYSTEM VENT VALVE Photo IMG 1319 C-280
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-92 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL CLG THROTTLE VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-281
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-92 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL CLG THROTTLE VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Leakage is tagged.
In-line equipment.
See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 J 'W Seth Baker 10/10/12 C-282
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-I18-92 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL CLG THROTTLE VALVE Photos MG_1261 MG_1262 C-283
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-12 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP DISCHARGE VALVE(SYSTEM I)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-284
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-12 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP DISCHARGE VALVE(SYSTEM I)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
See Seismic Qualification SQ-OC-V-20-0012 Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-285
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-12 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP DISCHARGE VALVE(SYSTEM I)
Photo MG_0657 C-286
12QO108.80-R-O01, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
"A" CONTAINMENT ISO. VALVE - SYS. I Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-287
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
"A" CONTAINMENT ISO. VALVE - SYS. I Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Minor leakage.
See Seismic Qualification SQ-OC-V-20-0015 Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-288
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
"A"CONTAINMENT ISO. VALVE - SYS. I Photo 1MG_0655 C-289
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-3 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP "A"SUCTION VALVE FROM TORUS Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 19.00 ft, 18 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-290
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-3 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP "A" SUCTION VALVE FROM TORUS Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Drawing 2065-5 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-291
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-3 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP "A" SUCTION VALVE FROM TORUS Photos MG_1029 MG_1032 C-292
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-21-75 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CONTAINMENT ISOLATION FOR TORUS WATER CLEAN-UP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 19.00 ft, 19 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-293
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-21-75 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CONTAINMENT ISOLATION FOR TORUS WATER CLEAN-UP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Drawing W8321853 Rev A Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-294
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: r N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-21-75 Equipment Class: (8) Moto r-Operated and Solenoid-Operated Valves Equipment
Description:
CONTAIINMENT ISOLATION FOR TORUS WATER CLEAN-UP Photo AlG_1041 C-295
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-109 Equipment Class: (0) Other Equipment
Description:
EDGI PRIMING PUMP SUCTION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-296
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: ] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-109 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP SUCTION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 In-Line equipment Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-297
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-109 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP SUCTION VALVE Photos MG 1170 MG_1172 MG_1 173 C-298
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Fli N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-110 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP DISCHARGE VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-299
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-110 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP DISCHARGE VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-300
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-110 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP DISCHARGE VALVE Photos MG 1170 MG_1 172 MG_1173 C-301
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: rY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-2 Equipment Class: (0) Other Equipment
Description:
ISOLATION VALVE FOR TANK T-39-002 OUTLET Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 18.00 ft, 03 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-302
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-2 Equipment Class: (0) Other Equipment
Description:
ISOLATION VALVE FOR TANK T-39-002 OUTLET Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: Wing Ho Date: 10/10/12 Seth Baker 10/15/12 C-303
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-2 Equipment Class: (0) Other Equipment
Description:
ISOLATION VALVE FOR TANK T-39-002 OUTLET Photos IMUi.41b( IMG_4169 C-304
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 Equipment Class: (14) Distribution Panels Equipment
Description:
120V VITAL AC POWER PANEL 208/120V,3PH,4W,60HZ Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 10 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-305
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 4 Status: jT] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 Equipment Class: (14) Distribution Panels Equipment
Description:
120V VITAL AC POWER PANEL 208/120V,3PH,4W,60HZ Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification No. SQ-OC-VACP-1, Rev 0 Anchor bolts behind panel verified by touch.
Above panel is far enough away and has rigid enough support to preclude interaction.
Calculation C-1 302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-306
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 Equipment Class: (14) Distribution Panels Equipment
Description:
120V VITAL AC POWER PANEL 208/120V,3PH,4W,60HZ Photos MG_0929 MG_0931 C-307
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: EY- N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 XF Equipment Class: (4) Transformers Equipment
Description:
120V VITAL AC POWER PANEL TRANSFORMER 480/208/120V Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 10 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-308
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 XF Equipment Class: (4) Transformers Equipment
Description:
120V VITAL AC POWER PANEL TRANSFORMER 480/208/120V Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Equipment was verified as consistent with SQ-OC-VACP-1 XFMR, Rev. 0 Calculation C-1 302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-309
12Q0108.80-R-001, Rev. I Correspondence No.: RS-12-177 Sheet 3 of 3 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 XF Equipment Class: (4) Transformers Equipment
Description:
120V VITAL AC POWER PANEL TRANSFORMER 480/208/120V Photos IMUN UzU IMG_0921 C-310
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 Equipment Class: (14) Distribution Panels Equipment
Description:
120V VITAL AC POWER PANEL 208/120V,3PH,4W,60HZ SQUG SEWS EBASCO SERVICES INcORPORATED Two World Trace Center. New York. N.Y 10048 April 29, 1981 CPU Services Incorporated Attention: Mr. Leon Caribian 100 Interpace Parkway Parsippany, NJ 07054
Dear Leon:
Re: OYSTER CREEK NUCLEAR STATION FINAL SUBMITTAL OF MASONRY WALL EVALUATION CALCULATION BOOKS I am sending to you together with this letter,20 volumes of calculation books and 11 volumes of computer output. This will mark the end of our 0 involvement for the re-evaluation of the Safety-Related Concrete Walls as required by NRC IE Bulletin 80-11, Masonry Should you have any questions regarding the calculations and sketches, please do not hestitate to call. We will be glad to help.
Very truly yours, E Odar Assistant Chief Civil Engineer GW:dl cc: K D Chin C Wu C1302X322CA06 VOL 1, 19810427, REEVALUATION OF CONCRETE MASONRY WALL NRC IE BULLETIN 80-11 GENERAL C-311
Text
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: *-7 N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: ER18A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CORE SPRAY/AUTO DEPRESS'N SYSTEM RELAY LOGIC PANEL Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 12 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-87
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: ER18A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CORE SPRAY/AUTO DEPRESS'N SYSTEM RELAY LOGIC PANEL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-ER-18A Rev 1 Calculation C-1 302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-88
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: ER1 8A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CORE SPRAY/AUTO DEPRESS'N SYSTEM RELAY LOGIC PANEL Photos I_
MG 0907 MG_0908 MG_0910 C-89
12Q0O108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-56-4 Equipment Class: (9) Fans Equipment
Description:
"A" 480 SWGR RM SUPPLY FAN Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 14 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-90
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-56-4 Equipment Class: (9) Fans Equipment
Description:
"A" 480 SWGR RM SUPPLY FAN Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-FN-56-0004 Rev 00 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-91
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-56-4 Equipment Class: (9) Fans Equipment
Description:
"A" 480 SWGR RM SUPPLY FAN Photos MG_0981 MG_0982 C-92
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-1 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 16 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-93
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: MZ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-1 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-ER-732-092 Rev 00 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-94
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-1 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Photo IMG_1001 C-95
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M-j N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-2 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 16 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-96
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-2 Equipment Class: (9) Fans Equipment
Description:
UISS 1A2-460V TRANSFORMER COOLING FAN Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-ER-732-092 Rev 00 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-97
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-2 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Photo M1G_1002 C-98
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-3 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 16 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-99
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-3 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-ER-732-092 Rev 00 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-100
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-3 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Photo IG_1005 C-101
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: FYI N U Seismic Walkdown Checklist (SWC)
EquipmentlD No.: H-18-1C Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
AUGMENTED SPENT FUEL POOL HEAT EXCHANGER(NN02-C)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-102
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentlD No.: H-18-1C Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
AUGMENTED SPENT FUEL POOL HEAT EXCHANGER(NN02-C)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Augmented Spent Fuel Pool Cooling System Qualification. C-1 302-251-5320-009, Dated 6/11/1984.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-103
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: H-18-1C Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
AUGMENTED SPENT FUEL POOL HEAT EXCHANGER(NN02-C)
Photos MG 1246 MG_1247 MG_1 248 C-104
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: H-21-1A Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
CONTAINMENT SPRAY SYS HEAT EXCHANGER 1-1 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-105
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: H-21-1A Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
CONTAINMENT SPRAY SYS HEAT EXCHANGER 1-1 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Supports are consistent with Calculation C-1 302-241-E310-107 Rev 0 Surface Oxidation on Bolts at the Base Plates. The degraded bolts had previously been identified in 2000 and is being tracked by IR 1403183. Gusset plates were added to the Heat Exchanger base to make up for the deficient bolts. The gusset plate modifications are detailed in Calculation C-1302-241-E310-107 Rev 0 Movable security barrier adjacent to the Heat Exchanger is chained to the column and chalked.
See Seismic Qualification SQ-OC-H-21-001A Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-106
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: H-2 1-1A Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
CONTAINMENT SPRAY SYS HEAT EXCHANGER 1-1 Photos MG 0704 MG_0706 MG_0711 MG_0720 C-107
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 4 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IP-4 Equipment Class: (14) Distribution Panels Equipment
Description:
120VAC INSTRUMENT PANEL 4 - 208/120V,3PH,4W Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 12 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-108
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IP-4 Equipment Class: (14) Distribution Panels Equipment
Description:
120VAC INSTRUMENT PANEL 4 - 208/120V,3PH,4W Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-IP-4, Rev 000 Verification of anchorage by feeling bolts in Unistrut Calculation C-1302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-109
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IP-4 Equipment Class: (14) Distribution Panels Equipment
Description:
120VAC INSTRUMENT PANEL 4 - 208/120V,3PH,4W Photos MG 0883 MG_0884 MG_0885 C-110
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IP-4 Equipment Class: (14) Distribution Panels Equipment
Description:
120VAC INSTRUMENT PANEL 4 - 208/120V,3PH,4W SQUGSEWS SQUG SEWS EBASCO TWO SERVICES INCORPORATED WOrd TNado Cenler.NewYork.N.Y. 0G045 E CC 4
April 29, 1981 CPU Services Incorporated Attention: Mr. Leon Caribian 100 Interpace Parkway Parsippany, NJ 07054
Dear Leon:
Re: OYSTER CREEK NUCLEAR STATION FINAL SUBMITTAL OF MASONRY WALL EVALUATION CALCULATION BOOKS I am sending to you together with this letter,20 volumes of calculation books and 11 volumes of computer output. This will mark the end of our 0 involvement for the re-evaluation of the Safety-Related Concrete Masonry Walls as required by NRC IE Bulletin 80-11.
Should you have any questions regarding the calculations and sketches, please do not hestitate to call. We will be glad to help.
Very truly yours, E Odar Assistant Chief Civil Engineer GW:dl cc: K D Chin G Wu C1302X322CA06 VOL 1, 19810427, REEVALUATION OF CONCRETE MASONRY WALL NRC IE BULLETIN 80-11 GENERAL C-111
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IT-4A Equipment Class: (4) Transformers Equipment
Description:
TRANSFORMER FROM MCC 1A2-460V TO IP-4 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 12 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-112
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IT-4A Equipment Class: (4) Transformers Equipment
Description:
TRANSFORMER FROM MCC 1A2-460V TO IP-4 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-IT-4A Rev 0 Calculation C-1302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-113
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 4 Status: M-i N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IT-4A Equipment Class: (4) Transformers Equipment
Description:
TRANSFORMER FROM MCC 1A2-460V TO IP-4 Photos I
MG_0888 MG_0891 MG_0893 C-114
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 4 of 4 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IT-4A Equipment Class: (4) Transformers Equipment
Description:
TRANSFORMER FROM MCC 1A2-460V TO IP-4 SQUG SEW EBASCO SERVICES INCORPORATED Tvo World Tade Cerer. New York. N.Y 10048 4
April 29, 1981 GPU Services Incorporated Attention: Mr. Leon Garibian 100 Interpace Parkway Parsippany, NJ 07054
Dear Leon:
Re: OYSTER CREEK NUCLEAR STATION FINAL SUBMITTAL OF MASONRY WALL EVALUATION CALCULATION BOOKS I am sending to you together with this letter, 20 volumes of calculation books and 11 volumes of computer output. This will mark the end of our involvement for the re-evaluation of the Safety-Related Concrete Masonry Walls as required by NRC IE Bulletin 80-11.
Should you have any questions regarding the calculations and sketches, please do not hestitate to call. We will be glad to help.
Very truly yours, E Odar '/
Assistant Chief Civil Engineer GW:dl cc: K D Chiu G Wo C1302X322CA06 VOL 1, 19810427, REEVALUATION OF CONCRETE MASONRY WALL NRC IE BULLETIN 80-11 GENERAL C-115
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [7] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LI-18-170 Equipment Class: (18) Instruments on Racks Equipment
Description:
SKIMMER SURGE TANK'A'FUEL POOL LEVEL INDICATOR Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 119.00 ft, 20 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-116
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LI-1 8-170 Equipment Class: (18) Instruments on Racks Equipment
Description:
SKIMMER SURGE TANK'A'FUEL POOL LEVEL INDICATOR Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-Line/Free Standing See VM-OC-0157 Rev 4 Dresser Part Number 60-1379AS-021 15 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-117
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LI-1 8-170 Equipment Class: (18) Instruments on Racks Equipment
Description:
SKIMMER SURGE TANK'A'FUEL POOL LEVEL INDICATOR Photo MG_1229 MG_1231 C-118
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LIS-RE0018A Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW LEVEL INDICATING SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-119
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LIS-RE0018A Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW LEVEL INDICATING SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-120
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LIS-RE0018C Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW LEVEL INDICATING SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-121
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LIS-RE0018C Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW LEVEL INDICATING SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-122
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-53B Equipment Class: (18) Instruments on Racks Equipment
Description:
SPENT FUEL POOL LOW WATER LEVEL SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 119.00 ft, 20 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-123
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-53B Equipment Class: (18) Instruments on Racks Equipment
Description:
SPENT FUEL POOL LOW WATER LEVEL SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See VM-OC-5740 Rev 1 Mercoid PG-3-P1 Evaluated by: / Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-124
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: E-i N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-53B Equipment Class: (18) Instruments on Racks Equipment
Description:
SPENT FUEL POOL LOW WATER LEVEL SWITCH Photos MG_1237 MG_1238 C-125
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-1OB Equipment Class: (0) Other Equipment
Description:
LO-LO LEVEL (START NORMAL PUMP) ON TANK T-39-003 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-126
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-10B Equipment Class: (0) Other Equipment
Description:
LO-LO LEVEL (START NORMAL PUMP) ON TANK T-39-003 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 In-Line equipment Evaluated by: / Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-127
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-10B Equipment Class: (0) Other Equipment
Description:
LO-LO LEVEL (START NORMAL PUMP) ON TANK T-39-003 Photo 1MG_1 141 C-128
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-10C Equipment Class: (0) Other Equipment
Description:
HI-HI LEVEL(PUMP CUT-OFF) ON TANK T-39-003 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-129
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-1OC Equipment Class: (0) Other Equipment
Description:
HI-HI LEVEL(PUMP CUT-OFF) ON TANK T-39-003 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 In-Line equipment Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-130
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-10C Equipment Class: (0) Other Equipment
Description:
HI-HI LEVEL(PUMP CUT-OFF) ON TANK T-39-003 Photo IMG_1141 C-131
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LSP-1A2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
LOCAL SHUTDOWN PANEL- USS 1A2 PUMP/BREAKER CONTROL Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 16 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-132
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LSP-1A2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
LOCAL SHUTDOWN PANEL- USS 1A2 PUMP/BREAKER CONTROL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-LSP-1A2 Rev 02 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-133
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LSP-1A2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
LOCAL SHUTDOWN PANEL- USS 1A2 PUMP/BREAKER CONTROL Photos Photos MG 1009 MG 1010 MG_1011 MG_1015 C-134
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LT-RE0005B Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW WATER LEVEL REACTOR SCRAM Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 17 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-135
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LT-RE0005B Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW WATER LEVEL REACTOR SCRAM Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK02 Rev 00 Horizontal Hairline linear indications (Cracks) on Drywell exterior behind RK02. Acceptable per review of the guidelines of ACI-349 guidelines.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-136
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: M-39-1 Equipment Class: (17) Engine-Generators Equipment
Description:
EMERGENCY DIESEL GENERATOR #1 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-137
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [f N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: M-39-1 Equipment Class: (17) Engine-Generators Equipment
Description:
EMERGENCY DIESEL GENERATOR #1 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 C-1302-157-5320-006, Rev. 0 qualifies the unanchored Diesels.
Base Corrosion is being tracked by the Plant.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-138
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: M-39-1 Equipment Class: (17) Engine-Generators Equipment
Description:
EMERGENCY DIESEL GENERATOR #1 Photo IMG_1134 C-139
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: P-18-1B Equipment Class: (5) Horizontal Pumps Equipment
Description:
SPENT FUEL POOL COOLING PUMP (NN01-B)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-140
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-18-16 Equipment Class: (5) Horizontal Pumps Equipment
Description:
SPENT FUEL POOL COOLING PUMP (NN01-B)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See drawing W-65107-R4 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-141
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-1 8-1 B Equipment Class: (5) Horizontal Pumps Equipment
Description:
SPENT FUEL POOL COOLING PUMP (NN01-B)
Photo MG_1255 C-142
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-18-1C Equipment Class: (5) Horizontal Pumps Equipment
Description:
AUGMENTED SPENT FUEL POOL PUMP (NN01-C)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-143
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: P-18-1C Equipment Class: (5) Horizontal Pumps Equipment
Description:
AUGMENTED SPENT FUEL POOL PUMP (NN01-C)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Augmented Spent Fuel Pool Cooling System Qualification. C-1302-251-5320-008, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-144
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-18-1C Equipment Class: (5) Horizontal Pumps Equipment
Description:
AUGMENTED SPENT FUEL POOL PUMP (NN01-C)
Photos MG 1290 MG_1291 MG_1293 C-145
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP NZ01-A Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 19.00 ft, 18 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-146
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP NZ01-A Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Drawing X-8X21AL86X6-A See Drawing 4074-5 Sheet 2 See Seismic Qualification SQ-OC-P-20-001A Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-147
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: - N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP NZ01-A Photos MG 1021 MG_1023 MG_1024 C-148
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A (NZ01A)
Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP "A" - SYS. I Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 19.00 ft, 18 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-149
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A (NZ01A)
Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP "A" - SYS. I Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Drawing X-8X21AL86X6-A See Drawing 4074-5 Sheet 2 See Seismic Qualification SQ-OC-P-20-001A Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-150
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A (NZ01A)
Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP "A" - SYS. I Photos Mn 10391 MG_1023 MG_1024 C-151
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-2A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY BOOSTER PUMP NZ03-A Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-152
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-2A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY BOOSTER PUMP NZ03-A Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-P-20-002A Rev 1 Anchorage details shown on drawing 4074-4 Rev. 4 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-153
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-2A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY BOOSTER PUMP NZ03-A Photos MG 0663 MG_0670 MG_0671 C-154
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: I- N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-3-3A Equipment Class: (6) Vertical Pumps Equipment
Description:
EMERGENCY SERVICE WATER PUMP 1-1 (52A)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): IS, 6.00 ft, 04 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-155
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-3-3A Equipment Class: (6) Vertical Pumps Equipment
Description:
EMERGENCY SERVICE WATER PUMP 1-1 (52A)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Proximity to handrail is not a seismic interaction issue due to the relatively low mass of the handrail.
See Seismic Qualification No. SQ-OC-P-3-003A Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-156
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-3-3A Equipment Class: (6) Vertical Pumps Equipment
Description:
EMERGENCY SERVICE WATER PUMP 1-1 (52A)
Photos P-3-3A
- Ii I MG_1215 MG_1217 MG_1221 C-157
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-13 Equipment Class: (5) Horizontal Pumps Equipment
Description:
FUEL OIL PUMP TO DAY TANK T-39-3 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-158
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-13 Equipment Class: (5) Horizontal Pumps Equipment
Description:
FUEL OIL PUMP TO DAY TANK T-39-3 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-159
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-13 Equipment Class: (5) Horizontal Pumps Equipment
Description:
FUEL OIL PUMP TO DAY TANK T-39-3 Photos MG_1175 MG_1178 C-160
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-17 Equipment Class: (5) Horizontal Pumps Equipment
Description:
DIESEL GENERATOR UNIT #1 ENGINE DRIVEN FUEL PUMP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-161
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-17 Equipment Class: (5) Horizontal Pumps Equipment
Description:
DIESEL GENERATOR UNIT #1 ENGINE DRIVEN FUEL PUMP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-162
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: L-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-17 Equipment Class: (5) Horizontal Pumps Equipment
Description:
DIESEL GENERATOR UNIT #1 ENGINE DRIVEN FUEL PUMP Photo 1MG_1161 C-163
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-19 Equipment Class: (5) Horizontal Pumps Equipment
Description:
M-39-1 LEFT BEARING COOLING WATER PUMP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors'? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-164
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-19 Equipment Class: (5) Horizontal Pumps Equipment
Description:
M-39-1 LEFT BEARING COOLING WATER PUMP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 In-Line equipment Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-165
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-19 Equipment Class: (5) Horizontal Pumps Equipment
Description:
M-39-1 LEFT BEARING COOLING WATER PUMP Photos MG_1166 MG_1167 C-166
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-25 Equipment Class: (5) Horizontal Pumps Equipment
Description:
AC TURBO LUBE OIL PUMP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 02 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-167
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-25 Equipment Class: (5) Horizontal Pumps Equipment
Description:
AC TURBO LUBE OIL PUMP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification No. SQ-OC-M-39-002 Oil leak is Yellow tagged.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-168
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-25 Equipment Class: (5) Horizontal Pumps Equipment
Description:
AC TURBO LUBE OIL PUMP Photo IG_1205 C-169
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: IiZ] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P1-18-82 Equipment Class: (18) Instruments on Racks Equipment
Description:
AUGMENTED SFP COOLING PMP NN01-C DISCHARGE PRESSURE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-170
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P1-18-82 Equipment Class: (18) Instruments on Racks Equipment
Description:
AUGMENTED SFP COOLING PMP NN01-C DISCHARGE PRESSURE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments US Guage CO. Figure 1980 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-171
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P1-18-82 Equipment Class: (18) Instr uments on Racks Equipment
Description:
AUGMEI` *ITED SFP COOLING PMP NN01-C DISCHARGE PRESSURE Photos MG_1315 MG_1316 C-172
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\06-15 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-173
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\06-15 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 J- Seth Baker 10/10/12 C-174
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: L N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\06-15 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Photo
-IMG_0752 C-175
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\26-03 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-176
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\26-03 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-177
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\26-03 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Photos MG_0778 C-178
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-1 Equipment Class: (4) Transformers Equipment
Description:
480/120VAC TRANSFORMER TO PROTECTION SYS PANELS 1&2 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): TB, 36.00 ft, 24 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-179
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-1 Equipment Class: (4) Transformers Equipment
Description:
480/120VAC TRANSFORMER TO PROTECTION SYS PANELS 1&2 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-180
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-I Equipment Class: (4) Transformers Equipment
Description:
480/120VAC TRANSFORMER TO PROTECTION SYS PANELS 1&2 Photos MG_1103 MG_1106 C-181
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-1 8-79 Equipment Class: (18) Instruments on Racks Equipment
Description:
ASFP COOLING PUMP NN01-C LOW SUCTION PRESSURE TRIP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-182
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-18-79 Equipment Class: (18) Instruments on Racks Equipment
Description:
ASFP COOLING PUMP NN01-C LOW SUCTION PRESSURE TRIP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments B070 BARKSDALE CONTROL MODEL D1T-M18SS Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-183
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: F] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-1 8-79 Equipment Class: (18) Instruments on Racks Equipment
Description:
ASFP COOLING PUMP NNO1-C LOW SUCTION PRESSURE TRIP Photo MG_1304 C-184
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-IA0083A Equipment Class: (18) Instruments on Racks Equipment
Description:
EMRV NR108A HIGH PRESSURE SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-185
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-IA0083A Equipment Class: (18) Instruments on Racks Equipment
Description:
EMRV NR108A HIGH PRESSURE SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/15/12 J Seth Baker 10/15/12 C-186
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-IA0083C Equipment Class: (18) Instruments on Racks Equipment
Description:
EMRV NR108C HIGH PRESSURE SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 17 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-187
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: [-Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-IA0083C Equipment Class: (18) Instruments on Racks Equipment
Description:
EMRV NR108C HIGH PRESSURE SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK02 Rev 00 Horizontal Hairline linear indications (Cracks) on Drywell exterior behind RK02. Acceptable per review of the guidelines of ACI-349 guidelines.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-188
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RE0017A Equipment Class: (18) Instruments on Racks Equipment
Description:
LOW REACTOR PRESS. SWITCH READIES CORE SPRAY VALVES Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-189
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M-* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RE0017A Equipment Class: (18) Instruments on Racks Equipment
Description:
LOW REACTOR PRESS. SWITCH READIES CORE SPRAY VALVES Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-190
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RV0046A Equipment Class: (18) Instruments on Racks Equipment
Description:
DRYWELL HIGH PRESSURE SWITCH-AUTO STARTS PUMPS Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-191
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RV0046A Equipment Class: (18) Instruments on Racks Equipment
Description:
DRYWELL HIGH PRESSURE SWITCH-AUTO STARTS PUMPS Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQUG SEWS (SQ-OC-RK03) Rev 000 See Seismic Qualification SQ-OC-PS-RV0046A Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-192
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: r N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RV0046A Equipment Class: (18) Instruments on Racks Equipment
Description:
DRYWELL HIGH PRESSURE SWITCH-AUTO STARTS PUMPS Photo IMG-0685 C-193
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-1 Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR PROTECTION SYSTEM 1A,2A INSTRUMENT RACK A,B Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-194
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: [Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-1 Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR PROTECTION SYSTEM 1A,2A INSTRUMENT RACK A,B Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-195
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-3 Equipment Class: (18) Instruments on Racks Equipment
Description:
INSTRUMENT RACK RECIRC'N PUMP REACTOR PROTECTION Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-196
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [-* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-3 Equipment Class: (18) Instruments on Racks Equipment
Description:
INSTRUMENT RACK RECIRCN PUMP REACTOR PROTECTION Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQUG SEWS (SQ-OC-RK03) Rev 000 Missing bolt is addressed in SQUG SEWS (SQ-OC-RK03) and determined to be seismically adequate in the current configuration.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-197
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-3 Equipment Class: (18) Instruments on Racks Equipment
Description:
INSTRUMENT RACK RECIRCN PUMP REACTOR PROTECTION Photos MG 0679 MG_0680 MG_0694 C-198
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: ROTARY INVERTER\AC Equipment Class: (13) Motor-Generators Equipment
Description:
AC GENERATOR FOR 120V AC SUPPLY FOR CIP-3 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): OB, 35.00 ft, 05 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-199
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: ]-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: ROTARY INVERTER\AC Equipment Class: (13) Motor-Generators Equipment
Description:
AC GENERATOR FOR 120V AC SUPPLY FOR CIP-3 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Horizontal restraint modification is consistent with SQUG SEWS and drawings identified within SEWS.
See Seismic Qualification No. SQ-OC-ROTARY INVERTER\AC Nearby masonry block Wall is braced. Calculation C-1302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-200
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: ROTARY INVERTER\AC Equipment Class: (13) Motor-Generators Equipment
Description:
AC GENERATOR FOR 120V AC SUPPLY FOR CIP-3 Photos MG 1113 MG 1115 MG_1116 MG_1118 C-201
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-202
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: MI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-203
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: L N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Photo IMG-0755 C-204
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-205
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1 302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-206
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Photo IMG-0762 C-207
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 2) (South)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-208
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: 1-Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 2) (South)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-209
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 2) (South)
Photo AG_0817 C-210
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: r] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-07 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 3) (South)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-211
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-07 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 3) (South)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
See Calculation's C-1 302-225-E310-049, Rev. 0 and C-1 302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-212
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-07 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 3) (South)
Photo IMG-0802 C-213
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-214
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-215
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (North)
Photo IMG_0756 C-216
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: i-l N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (South)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-217
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: MI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (South)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-218
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Ml N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (South)
Photo OG_0822 C-219
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-220
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-221
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121 \06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Photo MG_0760 C-222
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-223
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1 302-225-E310-049, Rev. 0 and C-1 302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-224
12Q0108.80-R-OO1, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Photo
.IMG-0763 C-225
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-2 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR FUEL OIL STORAGE TANK Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 18.00 ft, 03 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-226
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 4 Status: F-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-2 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR FUEL OIL STORAGE TANK Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-T-39-002 Rev 1 Evaluated by: 01T'HO Wing Ho Date: 10/10/12 j Seth Baker 10/10/12 C-227
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-2 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR FUEL OIL STORAGE TANK Photos MG_4172 MG_4174 C-228
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 4 of 4 Status: r] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-2 Equipment Class: (21) Tanks and Heat Exchangers Pni inmanf I-ac,-rinfinn-DIESEL GENERATOR FUEL OIL STORAGE TANK Mr. 4175 MG_4178 MG_4179 C-229
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-3 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR UNIT #1 FUEL OIL DAY TANK Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-230
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-3 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR UNIT #1 FUEL OIL DAY TANK Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 J 'le Seth Baker 10/10/12 C-231
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-3 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR UNIT #1 FUEL OIL DAY TANK Photos MG_1137 MG_1138 C-232
12Q0108.80-R-O01, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-5 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
M-39-1 COOLING WATER TANK Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-233
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-5 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
M-39-1 COOLING WATER TANK Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-234
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-5 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
M-39-1 COOLING WATER TANK Photos MG 1153 MG_1155 MG_1157 C-235
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: TI-18-267 Equipment Class: (19) Temperature Sensors Equipment
Description:
ASFP HEAT EXCHANGER NN02C OUTLET TEMPERATURE Project: Oyster Creek SWEL Location (BIdg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-236
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: TI-18-267 Equipment Class: (19) Temperature Sensors Equipment
Description:
ASFP HEAT EXCHANGER NN02C OUTLET TEMPERATURE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-237
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: TI- 18-267 Equipment Class: (19) Temperature Sensors Equipment
Description:
ASFP HEAT EXCHANGER NN02C OUTLET TEMPERATURE Photo MiG_1294 C-238
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: MZ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-120 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SOUTH SCRAM DISCHARGE HDR VENT VALVE(NC53-A)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-239
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-120 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SOUTH SCRAM DISCHARGE HDR VENT VALVE(NC53-A)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments The Valve is Consistant with BS&B Service Instruction Manual for Diaphram Control Valves NS 106 page 2 See Seismic Qualification SQ-OC-V-15-0120 Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-240
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-120 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SOUTH SCRAM DISCHARGE HDR VENT VALVE(NC53-A)
Photo MG_0834 C-241
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-133 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
NORTH SCRAM DISCHG VOLUME DRAIN VALVE(NC52-A)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-242
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-133 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
NORTH SCRAM DISCHG VOLUME DRAIN VALVE(NC52-A)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments The Valve is Consistant with Flowserve Drawing 94-16252 Rev D See Seismic Qualification SQ-OC-V-15-0133 Rev 0 RTD for V-6-2917 touches valve V-1 5-133. Not an operability issue due to the relative low mass od V-6-2917 and the brass piping which is highly ductile. IR 01403039 Documents- Seismic interaction between valves V-15-133 and V-6-2917.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-243
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 5-133 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
NORTH SCRAM DISCHG VOLUME DRAIN VALVE(NC52-A)
Photos MG 0714 MG_0715 MG_0716 C-244
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Mul N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-1 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOP A PUMP SUCTION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 38.00 ft, 22 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-245
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-1 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOP 'A' PUMP SUCTION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Drawing 93-14360 Rev c Evaluated by: Wing Ho Date: 10/10/12 Seth Baker 10/10/12 C-246
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-1 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOP A PUMP SUCTION VALVE Photos MG_4182 MG_4183 MG_4184 C-247
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-212 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOPA' OUTLET HEADER VENT VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 23 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-248
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-212 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOPA' OUTLET HEADER VENT VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEE CONVAL DRAWING 10G2-105 REV B Evaluated by: O)A" Wing Ho Date: 10/10/12 Seth Baker 10/10/12 C-249
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-212 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOPA' OUTLET HEADER VENT VALVE Photos MG_4194 MG_4195 C-250
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-112 Equipment Class: (0) Other Equipment
Description:
ASFP COOLING PUMP NN01-D CASING VENT VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-251
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-112 Equipment Class: (0) Other Equipment
Description:
ASFP COOLING PUMP NN01-D CASING VENT VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-252
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-112 Equipment Class: (0) Other Equipment
Description:
ASFP COOLING PUMP NN01-D CASING VENT VALVE Photo Photo VG_1308 C-253
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-1266 Equipment Class: (0) Other Equipment
Description:
FUEL POOL MAKEUP ISOLATION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-254
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: LY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-1266 Equipment Class: (0) Other Equipment
Description:
FUEL POOL MAKEUP ISOLATION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
3" Globe Valve Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-255
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-1266 Equipment Class: (0) Other Equipment
Description:
FUEL POOL MAKEUP ISOLATION VALVE Photo 1258 C-256
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M-* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-19 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL COOLING OUTLET VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-257
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-19 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL COOLING OUTLET VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation C-1 302-251-5320-011 Dated 25 Sept 1984 See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-258
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: EIY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-19 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL COOLING OUTLET VALVE Photos MG_1264 MG_1265 C-259
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-2 Equipment Class: (0) Other Equipment
Description:
AUGMENTED SPENT FUEL POOL SYSTEM INLET VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-260
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-2 Equipment Class: (0) Other Equipment
Description:
AUGMENTED SPENT FUEL POOL SYSTEM INLET VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation C-1302-251-5320-011 Dated 25 Sept 1984 See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-261
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-2 Equipment Class: (0) Other Equipment
Description:
AUGMENTED SPENT FUEL POOL SYSTEM INLET VALVE Photos Photos MG_1300 MG_1302 C-262
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-3 Equipment Class: (0) Other Equipment
Description:
SFP COOLING PUMP (NN01-A) SUCTION ISOLATION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-263
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-3 Equipment Class: (0) Other Equipment
Description:
SFP COOLING PUMP (NN01-A) SUCTION ISOLATION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation C-1302-251-5320-011 Dated 25 Sept 1984 See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-264
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-3 Equipment Class: (0) Other Equipment
Description:
SFP COOLING PUMP (NN01-A) SUCTION ISOLATION VALVE Photo Photo MG_1251 C-265
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: EZ] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-47 Equipment Class: (0) Other Equipment
Description:
DRAIN FROM REACTOR WELL BACK TO FUEL POOL PUMPS Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-266
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-47 Equipment Class: (0) Other Equipment
Description:
DRAIN FROM REACTOR WELL BACK TO FUEL POOL PUMPS Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation C-1 302-251-5320-011 Dated 25 Sept 1984 See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-267
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-47 Equipment Class: (0) Other Equipment
Description:
DRAIN FROM REACTOR WELL BACK TO FUEL POOL PUMPS Photo 1249 C-268
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-74 Equipment Class: (0) Other Equipment
Description:
AUGMENTE FUEL POOL CLG PUMP NN01-D DISCHARGE VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-269
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-74 Equipment Class: (0) Other Equipment
Description:
AUGMENTE FUEL POOL CLG PUMP NN01-D DISCHARGE VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-270
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-74 Equipment Class: (0) Other Equipment
Description:
AUGMENTE FUEL POOL CLG PUMP NN01-D DISCHARGE VALVE Photos IMG_1296 IMG-1297 C-271
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-80 Equipment Class: (0) Other Equipment
Description:
P1-18-88 ISOLATION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-272
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-80 Equipment Class: (0) Other Equipment
Description:
P1-18-88 ISOLATION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-273
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: L N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-80 Equipment Class: (0) Other Equipment
Description:
P1-18-88 ISOLATION VALVE Photo IMG_1313 C-274
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: MI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-81 Equipment Class: (0) Other Equipment
Description:
PS-18-0080 ISOLATION ROOT VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-275
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-81 Equipment Class: (0) Other Equipment
Description:
PS-18-0080 ISOLATION ROOT VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-276
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-81 Equipment Class: (0) Other Equipment
Description:
PS-18-0080 ISOLATION ROOT VALVE Photo IMG 1306 C-277
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-88 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FPC SYSTEM VENT VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-278
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-88 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FPC SYSTEM VENT VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-279
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-88 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FPC SYSTEM VENT VALVE Photo IMG 1319 C-280
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-92 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL CLG THROTTLE VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-281
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-92 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL CLG THROTTLE VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Leakage is tagged.
In-line equipment.
See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 J 'W Seth Baker 10/10/12 C-282
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-I18-92 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL CLG THROTTLE VALVE Photos MG_1261 MG_1262 C-283
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-12 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP DISCHARGE VALVE(SYSTEM I)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-284
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-12 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP DISCHARGE VALVE(SYSTEM I)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
See Seismic Qualification SQ-OC-V-20-0012 Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-285
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-12 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP DISCHARGE VALVE(SYSTEM I)
Photo MG_0657 C-286
12QO108.80-R-O01, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
"A" CONTAINMENT ISO. VALVE - SYS. I Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-287
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
"A" CONTAINMENT ISO. VALVE - SYS. I Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Minor leakage.
See Seismic Qualification SQ-OC-V-20-0015 Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-288
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
"A"CONTAINMENT ISO. VALVE - SYS. I Photo 1MG_0655 C-289
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-3 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP "A"SUCTION VALVE FROM TORUS Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 19.00 ft, 18 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-290
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-3 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP "A" SUCTION VALVE FROM TORUS Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Drawing 2065-5 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-291
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-3 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP "A" SUCTION VALVE FROM TORUS Photos MG_1029 MG_1032 C-292
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-21-75 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CONTAINMENT ISOLATION FOR TORUS WATER CLEAN-UP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 19.00 ft, 19 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-293
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-21-75 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CONTAINMENT ISOLATION FOR TORUS WATER CLEAN-UP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Drawing W8321853 Rev A Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-294
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: r N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-21-75 Equipment Class: (8) Moto r-Operated and Solenoid-Operated Valves Equipment
Description:
CONTAIINMENT ISOLATION FOR TORUS WATER CLEAN-UP Photo AlG_1041 C-295
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-109 Equipment Class: (0) Other Equipment
Description:
EDGI PRIMING PUMP SUCTION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-296
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: ] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-109 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP SUCTION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 In-Line equipment Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-297
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-109 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP SUCTION VALVE Photos MG 1170 MG_1172 MG_1 173 C-298
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Fli N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-110 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP DISCHARGE VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-299
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-110 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP DISCHARGE VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-300
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-110 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP DISCHARGE VALVE Photos MG 1170 MG_1 172 MG_1173 C-301
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: rY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-2 Equipment Class: (0) Other Equipment
Description:
ISOLATION VALVE FOR TANK T-39-002 OUTLET Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 18.00 ft, 03 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-302
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-2 Equipment Class: (0) Other Equipment
Description:
ISOLATION VALVE FOR TANK T-39-002 OUTLET Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: Wing Ho Date: 10/10/12 Seth Baker 10/15/12 C-303
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-2 Equipment Class: (0) Other Equipment
Description:
ISOLATION VALVE FOR TANK T-39-002 OUTLET Photos IMUi.41b( IMG_4169 C-304
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 Equipment Class: (14) Distribution Panels Equipment
Description:
120V VITAL AC POWER PANEL 208/120V,3PH,4W,60HZ Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 10 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-305
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 4 Status: jT] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 Equipment Class: (14) Distribution Panels Equipment
Description:
120V VITAL AC POWER PANEL 208/120V,3PH,4W,60HZ Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification No. SQ-OC-VACP-1, Rev 0 Anchor bolts behind panel verified by touch.
Above panel is far enough away and has rigid enough support to preclude interaction.
Calculation C-1 302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-306
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 Equipment Class: (14) Distribution Panels Equipment
Description:
120V VITAL AC POWER PANEL 208/120V,3PH,4W,60HZ Photos MG_0929 MG_0931 C-307
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: EY- N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 XF Equipment Class: (4) Transformers Equipment
Description:
120V VITAL AC POWER PANEL TRANSFORMER 480/208/120V Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 10 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-308
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 XF Equipment Class: (4) Transformers Equipment
Description:
120V VITAL AC POWER PANEL TRANSFORMER 480/208/120V Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Equipment was verified as consistent with SQ-OC-VACP-1 XFMR, Rev. 0 Calculation C-1 302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-309
12Q0108.80-R-001, Rev. I Correspondence No.: RS-12-177 Sheet 3 of 3 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 XF Equipment Class: (4) Transformers Equipment
Description:
120V VITAL AC POWER PANEL TRANSFORMER 480/208/120V Photos IMUN UzU IMG_0921 C-310
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 Equipment Class: (14) Distribution Panels Equipment
Description:
120V VITAL AC POWER PANEL 208/120V,3PH,4W,60HZ SQUG SEWS EBASCO SERVICES INcORPORATED Two World Trace Center. New York. N.Y 10048 April 29, 1981 CPU Services Incorporated Attention: Mr. Leon Caribian 100 Interpace Parkway Parsippany, NJ 07054
Dear Leon:
Re: OYSTER CREEK NUCLEAR STATION FINAL SUBMITTAL OF MASONRY WALL EVALUATION CALCULATION BOOKS I am sending to you together with this letter,20 volumes of calculation books and 11 volumes of computer output. This will mark the end of our 0 involvement for the re-evaluation of the Safety-Related Concrete Walls as required by NRC IE Bulletin 80-11, Masonry Should you have any questions regarding the calculations and sketches, please do not hestitate to call. We will be glad to help.
Very truly yours, E Odar Assistant Chief Civil Engineer GW:dl cc: K D Chin C Wu C1302X322CA06 VOL 1, 19810427, REEVALUATION OF CONCRETE MASONRY WALL NRC IE BULLETIN 80-11 GENERAL C-311
Text
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: *-7 N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: ER18A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CORE SPRAY/AUTO DEPRESS'N SYSTEM RELAY LOGIC PANEL Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 12 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-87
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: ER18A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CORE SPRAY/AUTO DEPRESS'N SYSTEM RELAY LOGIC PANEL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-ER-18A Rev 1 Calculation C-1 302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-88
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: ER1 8A Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
CORE SPRAY/AUTO DEPRESS'N SYSTEM RELAY LOGIC PANEL Photos I_
MG 0907 MG_0908 MG_0910 C-89
12Q0O108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-56-4 Equipment Class: (9) Fans Equipment
Description:
"A" 480 SWGR RM SUPPLY FAN Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 14 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-90
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-56-4 Equipment Class: (9) Fans Equipment
Description:
"A" 480 SWGR RM SUPPLY FAN Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-FN-56-0004 Rev 00 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-91
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-56-4 Equipment Class: (9) Fans Equipment
Description:
"A" 480 SWGR RM SUPPLY FAN Photos MG_0981 MG_0982 C-92
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-1 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 16 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-93
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: MZ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-1 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-ER-732-092 Rev 00 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-94
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-1 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Photo IMG_1001 C-95
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M-j N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-2 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 16 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-96
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-2 Equipment Class: (9) Fans Equipment
Description:
UISS 1A2-460V TRANSFORMER COOLING FAN Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-ER-732-092 Rev 00 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-97
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-2 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Photo M1G_1002 C-98
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-3 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 16 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-99
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-3 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-ER-732-092 Rev 00 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-100
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: FN-732-3 Equipment Class: (9) Fans Equipment
Description:
USS 1A2-460V TRANSFORMER COOLING FAN Photo IG_1005 C-101
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: FYI N U Seismic Walkdown Checklist (SWC)
EquipmentlD No.: H-18-1C Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
AUGMENTED SPENT FUEL POOL HEAT EXCHANGER(NN02-C)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-102
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentlD No.: H-18-1C Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
AUGMENTED SPENT FUEL POOL HEAT EXCHANGER(NN02-C)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Augmented Spent Fuel Pool Cooling System Qualification. C-1 302-251-5320-009, Dated 6/11/1984.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-103
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: H-18-1C Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
AUGMENTED SPENT FUEL POOL HEAT EXCHANGER(NN02-C)
Photos MG 1246 MG_1247 MG_1 248 C-104
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: H-21-1A Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
CONTAINMENT SPRAY SYS HEAT EXCHANGER 1-1 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-105
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: H-21-1A Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
CONTAINMENT SPRAY SYS HEAT EXCHANGER 1-1 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Supports are consistent with Calculation C-1 302-241-E310-107 Rev 0 Surface Oxidation on Bolts at the Base Plates. The degraded bolts had previously been identified in 2000 and is being tracked by IR 1403183. Gusset plates were added to the Heat Exchanger base to make up for the deficient bolts. The gusset plate modifications are detailed in Calculation C-1302-241-E310-107 Rev 0 Movable security barrier adjacent to the Heat Exchanger is chained to the column and chalked.
See Seismic Qualification SQ-OC-H-21-001A Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-106
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: H-2 1-1A Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
CONTAINMENT SPRAY SYS HEAT EXCHANGER 1-1 Photos MG 0704 MG_0706 MG_0711 MG_0720 C-107
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 4 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IP-4 Equipment Class: (14) Distribution Panels Equipment
Description:
120VAC INSTRUMENT PANEL 4 - 208/120V,3PH,4W Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 12 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-108
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IP-4 Equipment Class: (14) Distribution Panels Equipment
Description:
120VAC INSTRUMENT PANEL 4 - 208/120V,3PH,4W Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-IP-4, Rev 000 Verification of anchorage by feeling bolts in Unistrut Calculation C-1302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-109
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IP-4 Equipment Class: (14) Distribution Panels Equipment
Description:
120VAC INSTRUMENT PANEL 4 - 208/120V,3PH,4W Photos MG 0883 MG_0884 MG_0885 C-110
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IP-4 Equipment Class: (14) Distribution Panels Equipment
Description:
120VAC INSTRUMENT PANEL 4 - 208/120V,3PH,4W SQUGSEWS SQUG SEWS EBASCO TWO SERVICES INCORPORATED WOrd TNado Cenler.NewYork.N.Y. 0G045 E CC 4
April 29, 1981 CPU Services Incorporated Attention: Mr. Leon Caribian 100 Interpace Parkway Parsippany, NJ 07054
Dear Leon:
Re: OYSTER CREEK NUCLEAR STATION FINAL SUBMITTAL OF MASONRY WALL EVALUATION CALCULATION BOOKS I am sending to you together with this letter,20 volumes of calculation books and 11 volumes of computer output. This will mark the end of our 0 involvement for the re-evaluation of the Safety-Related Concrete Masonry Walls as required by NRC IE Bulletin 80-11.
Should you have any questions regarding the calculations and sketches, please do not hestitate to call. We will be glad to help.
Very truly yours, E Odar Assistant Chief Civil Engineer GW:dl cc: K D Chin G Wu C1302X322CA06 VOL 1, 19810427, REEVALUATION OF CONCRETE MASONRY WALL NRC IE BULLETIN 80-11 GENERAL C-111
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IT-4A Equipment Class: (4) Transformers Equipment
Description:
TRANSFORMER FROM MCC 1A2-460V TO IP-4 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 12 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-112
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IT-4A Equipment Class: (4) Transformers Equipment
Description:
TRANSFORMER FROM MCC 1A2-460V TO IP-4 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-IT-4A Rev 0 Calculation C-1302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-113
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 4 Status: M-i N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IT-4A Equipment Class: (4) Transformers Equipment
Description:
TRANSFORMER FROM MCC 1A2-460V TO IP-4 Photos I
MG_0888 MG_0891 MG_0893 C-114
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 4 of 4 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: IT-4A Equipment Class: (4) Transformers Equipment
Description:
TRANSFORMER FROM MCC 1A2-460V TO IP-4 SQUG SEW EBASCO SERVICES INCORPORATED Tvo World Tade Cerer. New York. N.Y 10048 4
April 29, 1981 GPU Services Incorporated Attention: Mr. Leon Garibian 100 Interpace Parkway Parsippany, NJ 07054
Dear Leon:
Re: OYSTER CREEK NUCLEAR STATION FINAL SUBMITTAL OF MASONRY WALL EVALUATION CALCULATION BOOKS I am sending to you together with this letter, 20 volumes of calculation books and 11 volumes of computer output. This will mark the end of our involvement for the re-evaluation of the Safety-Related Concrete Masonry Walls as required by NRC IE Bulletin 80-11.
Should you have any questions regarding the calculations and sketches, please do not hestitate to call. We will be glad to help.
Very truly yours, E Odar '/
Assistant Chief Civil Engineer GW:dl cc: K D Chiu G Wo C1302X322CA06 VOL 1, 19810427, REEVALUATION OF CONCRETE MASONRY WALL NRC IE BULLETIN 80-11 GENERAL C-115
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [7] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LI-18-170 Equipment Class: (18) Instruments on Racks Equipment
Description:
SKIMMER SURGE TANK'A'FUEL POOL LEVEL INDICATOR Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 119.00 ft, 20 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-116
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LI-1 8-170 Equipment Class: (18) Instruments on Racks Equipment
Description:
SKIMMER SURGE TANK'A'FUEL POOL LEVEL INDICATOR Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-Line/Free Standing See VM-OC-0157 Rev 4 Dresser Part Number 60-1379AS-021 15 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-117
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LI-1 8-170 Equipment Class: (18) Instruments on Racks Equipment
Description:
SKIMMER SURGE TANK'A'FUEL POOL LEVEL INDICATOR Photo MG_1229 MG_1231 C-118
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LIS-RE0018A Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW LEVEL INDICATING SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-119
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LIS-RE0018A Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW LEVEL INDICATING SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-120
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LIS-RE0018C Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW LEVEL INDICATING SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-121
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LIS-RE0018C Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW LEVEL INDICATING SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-122
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-53B Equipment Class: (18) Instruments on Racks Equipment
Description:
SPENT FUEL POOL LOW WATER LEVEL SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 119.00 ft, 20 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-123
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-53B Equipment Class: (18) Instruments on Racks Equipment
Description:
SPENT FUEL POOL LOW WATER LEVEL SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See VM-OC-5740 Rev 1 Mercoid PG-3-P1 Evaluated by: / Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-124
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: E-i N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-53B Equipment Class: (18) Instruments on Racks Equipment
Description:
SPENT FUEL POOL LOW WATER LEVEL SWITCH Photos MG_1237 MG_1238 C-125
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-1OB Equipment Class: (0) Other Equipment
Description:
LO-LO LEVEL (START NORMAL PUMP) ON TANK T-39-003 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-126
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-10B Equipment Class: (0) Other Equipment
Description:
LO-LO LEVEL (START NORMAL PUMP) ON TANK T-39-003 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 In-Line equipment Evaluated by: / Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-127
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-10B Equipment Class: (0) Other Equipment
Description:
LO-LO LEVEL (START NORMAL PUMP) ON TANK T-39-003 Photo 1MG_1 141 C-128
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-10C Equipment Class: (0) Other Equipment
Description:
HI-HI LEVEL(PUMP CUT-OFF) ON TANK T-39-003 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-129
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-1OC Equipment Class: (0) Other Equipment
Description:
HI-HI LEVEL(PUMP CUT-OFF) ON TANK T-39-003 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 In-Line equipment Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-130
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LS-862-10C Equipment Class: (0) Other Equipment
Description:
HI-HI LEVEL(PUMP CUT-OFF) ON TANK T-39-003 Photo IMG_1141 C-131
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LSP-1A2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
LOCAL SHUTDOWN PANEL- USS 1A2 PUMP/BREAKER CONTROL Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 16 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-132
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LSP-1A2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
LOCAL SHUTDOWN PANEL- USS 1A2 PUMP/BREAKER CONTROL Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-LSP-1A2 Rev 02 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-133
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LSP-1A2 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
Description:
LOCAL SHUTDOWN PANEL- USS 1A2 PUMP/BREAKER CONTROL Photos Photos MG 1009 MG 1010 MG_1011 MG_1015 C-134
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LT-RE0005B Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW WATER LEVEL REACTOR SCRAM Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 17 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-135
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: LT-RE0005B Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR VESSEL LOW WATER LEVEL REACTOR SCRAM Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK02 Rev 00 Horizontal Hairline linear indications (Cracks) on Drywell exterior behind RK02. Acceptable per review of the guidelines of ACI-349 guidelines.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-136
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: M-39-1 Equipment Class: (17) Engine-Generators Equipment
Description:
EMERGENCY DIESEL GENERATOR #1 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-137
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [f N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: M-39-1 Equipment Class: (17) Engine-Generators Equipment
Description:
EMERGENCY DIESEL GENERATOR #1 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 C-1302-157-5320-006, Rev. 0 qualifies the unanchored Diesels.
Base Corrosion is being tracked by the Plant.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-138
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: M-39-1 Equipment Class: (17) Engine-Generators Equipment
Description:
EMERGENCY DIESEL GENERATOR #1 Photo IMG_1134 C-139
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: P-18-1B Equipment Class: (5) Horizontal Pumps Equipment
Description:
SPENT FUEL POOL COOLING PUMP (NN01-B)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-140
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-18-16 Equipment Class: (5) Horizontal Pumps Equipment
Description:
SPENT FUEL POOL COOLING PUMP (NN01-B)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See drawing W-65107-R4 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-141
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-1 8-1 B Equipment Class: (5) Horizontal Pumps Equipment
Description:
SPENT FUEL POOL COOLING PUMP (NN01-B)
Photo MG_1255 C-142
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-18-1C Equipment Class: (5) Horizontal Pumps Equipment
Description:
AUGMENTED SPENT FUEL POOL PUMP (NN01-C)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-143
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
EquipmentID No.: P-18-1C Equipment Class: (5) Horizontal Pumps Equipment
Description:
AUGMENTED SPENT FUEL POOL PUMP (NN01-C)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Augmented Spent Fuel Pool Cooling System Qualification. C-1302-251-5320-008, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-144
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-18-1C Equipment Class: (5) Horizontal Pumps Equipment
Description:
AUGMENTED SPENT FUEL POOL PUMP (NN01-C)
Photos MG 1290 MG_1291 MG_1293 C-145
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP NZ01-A Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 19.00 ft, 18 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-146
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP NZ01-A Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Drawing X-8X21AL86X6-A See Drawing 4074-5 Sheet 2 See Seismic Qualification SQ-OC-P-20-001A Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-147
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: - N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP NZ01-A Photos MG 1021 MG_1023 MG_1024 C-148
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A (NZ01A)
Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP "A" - SYS. I Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 19.00 ft, 18 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-149
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A (NZ01A)
Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP "A" - SYS. I Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Drawing X-8X21AL86X6-A See Drawing 4074-5 Sheet 2 See Seismic Qualification SQ-OC-P-20-001A Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-150
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-1A (NZ01A)
Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY PUMP "A" - SYS. I Photos Mn 10391 MG_1023 MG_1024 C-151
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-2A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY BOOSTER PUMP NZ03-A Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-152
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-2A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY BOOSTER PUMP NZ03-A Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-P-20-002A Rev 1 Anchorage details shown on drawing 4074-4 Rev. 4 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-153
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-20-2A Equipment Class: (5) Horizontal Pumps Equipment
Description:
CORE SPRAY BOOSTER PUMP NZ03-A Photos MG 0663 MG_0670 MG_0671 C-154
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: I- N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-3-3A Equipment Class: (6) Vertical Pumps Equipment
Description:
EMERGENCY SERVICE WATER PUMP 1-1 (52A)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): IS, 6.00 ft, 04 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-155
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-3-3A Equipment Class: (6) Vertical Pumps Equipment
Description:
EMERGENCY SERVICE WATER PUMP 1-1 (52A)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Proximity to handrail is not a seismic interaction issue due to the relatively low mass of the handrail.
See Seismic Qualification No. SQ-OC-P-3-003A Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-156
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-3-3A Equipment Class: (6) Vertical Pumps Equipment
Description:
EMERGENCY SERVICE WATER PUMP 1-1 (52A)
Photos P-3-3A
- Ii I MG_1215 MG_1217 MG_1221 C-157
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-13 Equipment Class: (5) Horizontal Pumps Equipment
Description:
FUEL OIL PUMP TO DAY TANK T-39-3 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-158
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-13 Equipment Class: (5) Horizontal Pumps Equipment
Description:
FUEL OIL PUMP TO DAY TANK T-39-3 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-159
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-13 Equipment Class: (5) Horizontal Pumps Equipment
Description:
FUEL OIL PUMP TO DAY TANK T-39-3 Photos MG_1175 MG_1178 C-160
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-17 Equipment Class: (5) Horizontal Pumps Equipment
Description:
DIESEL GENERATOR UNIT #1 ENGINE DRIVEN FUEL PUMP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-161
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-17 Equipment Class: (5) Horizontal Pumps Equipment
Description:
DIESEL GENERATOR UNIT #1 ENGINE DRIVEN FUEL PUMP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-162
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: L-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-17 Equipment Class: (5) Horizontal Pumps Equipment
Description:
DIESEL GENERATOR UNIT #1 ENGINE DRIVEN FUEL PUMP Photo 1MG_1161 C-163
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-19 Equipment Class: (5) Horizontal Pumps Equipment
Description:
M-39-1 LEFT BEARING COOLING WATER PUMP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors'? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-164
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-19 Equipment Class: (5) Horizontal Pumps Equipment
Description:
M-39-1 LEFT BEARING COOLING WATER PUMP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 In-Line equipment Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-165
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-19 Equipment Class: (5) Horizontal Pumps Equipment
Description:
M-39-1 LEFT BEARING COOLING WATER PUMP Photos MG_1166 MG_1167 C-166
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-25 Equipment Class: (5) Horizontal Pumps Equipment
Description:
AC TURBO LUBE OIL PUMP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 02 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-167
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-25 Equipment Class: (5) Horizontal Pumps Equipment
Description:
AC TURBO LUBE OIL PUMP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification No. SQ-OC-M-39-002 Oil leak is Yellow tagged.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-168
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P-39-25 Equipment Class: (5) Horizontal Pumps Equipment
Description:
AC TURBO LUBE OIL PUMP Photo IG_1205 C-169
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: IiZ] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P1-18-82 Equipment Class: (18) Instruments on Racks Equipment
Description:
AUGMENTED SFP COOLING PMP NN01-C DISCHARGE PRESSURE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-170
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P1-18-82 Equipment Class: (18) Instruments on Racks Equipment
Description:
AUGMENTED SFP COOLING PMP NN01-C DISCHARGE PRESSURE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments US Guage CO. Figure 1980 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-171
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: P1-18-82 Equipment Class: (18) Instr uments on Racks Equipment
Description:
AUGMEI` *ITED SFP COOLING PMP NN01-C DISCHARGE PRESSURE Photos MG_1315 MG_1316 C-172
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\06-15 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-173
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\06-15 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 J- Seth Baker 10/10/12 C-174
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: L N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\06-15 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Photo
-IMG_0752 C-175
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\26-03 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-176
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\26-03 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-177
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PI-305-131\26-03 Equipment Class: (0) Other Equipment
Description:
ACCUMULATORS GAS PRESSURE INDICATOR Photos MG_0778 C-178
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-1 Equipment Class: (4) Transformers Equipment
Description:
480/120VAC TRANSFORMER TO PROTECTION SYS PANELS 1&2 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): TB, 36.00 ft, 24 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-179
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-1 Equipment Class: (4) Transformers Equipment
Description:
480/120VAC TRANSFORMER TO PROTECTION SYS PANELS 1&2 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-180
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-I Equipment Class: (4) Transformers Equipment
Description:
480/120VAC TRANSFORMER TO PROTECTION SYS PANELS 1&2 Photos MG_1103 MG_1106 C-181
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-1 8-79 Equipment Class: (18) Instruments on Racks Equipment
Description:
ASFP COOLING PUMP NN01-C LOW SUCTION PRESSURE TRIP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-182
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-18-79 Equipment Class: (18) Instruments on Racks Equipment
Description:
ASFP COOLING PUMP NN01-C LOW SUCTION PRESSURE TRIP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments B070 BARKSDALE CONTROL MODEL D1T-M18SS Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-183
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: F] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-1 8-79 Equipment Class: (18) Instruments on Racks Equipment
Description:
ASFP COOLING PUMP NNO1-C LOW SUCTION PRESSURE TRIP Photo MG_1304 C-184
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-IA0083A Equipment Class: (18) Instruments on Racks Equipment
Description:
EMRV NR108A HIGH PRESSURE SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-185
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-IA0083A Equipment Class: (18) Instruments on Racks Equipment
Description:
EMRV NR108A HIGH PRESSURE SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/15/12 J Seth Baker 10/15/12 C-186
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-IA0083C Equipment Class: (18) Instruments on Racks Equipment
Description:
EMRV NR108C HIGH PRESSURE SWITCH Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 17 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-187
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: [-Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-IA0083C Equipment Class: (18) Instruments on Racks Equipment
Description:
EMRV NR108C HIGH PRESSURE SWITCH Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK02 Rev 00 Horizontal Hairline linear indications (Cracks) on Drywell exterior behind RK02. Acceptable per review of the guidelines of ACI-349 guidelines.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-188
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RE0017A Equipment Class: (18) Instruments on Racks Equipment
Description:
LOW REACTOR PRESS. SWITCH READIES CORE SPRAY VALVES Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-189
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: M-* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RE0017A Equipment Class: (18) Instruments on Racks Equipment
Description:
LOW REACTOR PRESS. SWITCH READIES CORE SPRAY VALVES Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-190
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RV0046A Equipment Class: (18) Instruments on Racks Equipment
Description:
DRYWELL HIGH PRESSURE SWITCH-AUTO STARTS PUMPS Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-191
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RV0046A Equipment Class: (18) Instruments on Racks Equipment
Description:
DRYWELL HIGH PRESSURE SWITCH-AUTO STARTS PUMPS Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQUG SEWS (SQ-OC-RK03) Rev 000 See Seismic Qualification SQ-OC-PS-RV0046A Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-192
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: r N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: PS-RV0046A Equipment Class: (18) Instruments on Racks Equipment
Description:
DRYWELL HIGH PRESSURE SWITCH-AUTO STARTS PUMPS Photo IMG-0685 C-193
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 2 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-1 Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR PROTECTION SYSTEM 1A,2A INSTRUMENT RACK A,B Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 15 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-194
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 2 Status: [Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-1 Equipment Class: (18) Instruments on Racks Equipment
Description:
REACTOR PROTECTION SYSTEM 1A,2A INSTRUMENT RACK A,B Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-RK01 Rev 02 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-195
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-3 Equipment Class: (18) Instruments on Racks Equipment
Description:
INSTRUMENT RACK RECIRC'N PUMP REACTOR PROTECTION Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-196
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [-* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-3 Equipment Class: (18) Instruments on Racks Equipment
Description:
INSTRUMENT RACK RECIRCN PUMP REACTOR PROTECTION Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQUG SEWS (SQ-OC-RK03) Rev 000 Missing bolt is addressed in SQUG SEWS (SQ-OC-RK03) and determined to be seismically adequate in the current configuration.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-197
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: RK-3 Equipment Class: (18) Instruments on Racks Equipment
Description:
INSTRUMENT RACK RECIRCN PUMP REACTOR PROTECTION Photos MG 0679 MG_0680 MG_0694 C-198
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: ROTARY INVERTER\AC Equipment Class: (13) Motor-Generators Equipment
Description:
AC GENERATOR FOR 120V AC SUPPLY FOR CIP-3 Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): OB, 35.00 ft, 05 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-199
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: ]-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: ROTARY INVERTER\AC Equipment Class: (13) Motor-Generators Equipment
Description:
AC GENERATOR FOR 120V AC SUPPLY FOR CIP-3 Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Horizontal restraint modification is consistent with SQUG SEWS and drawings identified within SEWS.
See Seismic Qualification No. SQ-OC-ROTARY INVERTER\AC Nearby masonry block Wall is braced. Calculation C-1302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-200
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: ROTARY INVERTER\AC Equipment Class: (13) Motor-Generators Equipment
Description:
AC GENERATOR FOR 120V AC SUPPLY FOR CIP-3 Photos MG 1113 MG 1115 MG_1116 MG_1118 C-201
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-202
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: MI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-203
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: L N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Photo IMG-0755 C-204
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-205
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1 302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-206
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE (North)
Photo IMG-0762 C-207
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 2) (South)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-208
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: 1-Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 2) (South)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-209
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 2) (South)
Photo AG_0817 C-210
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: r] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-07 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 3) (South)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-211
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-07 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 3) (South)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
See Calculation's C-1 302-225-E310-049, Rev. 0 and C-1 302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-212
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-117\30-07 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CHANNEL I SCRAM AIR PILOT SOLENOID VALVE(GROUP 3) (South)
Photo IMG-0802 C-213
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-214
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-215
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (North)
Photo IMG_0756 C-216
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: i-l N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (South)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-217
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: MI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (South)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-218
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Ml N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-120\30-03 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL WITHDRAW SOLENOID VALVE (South)
Photo OG_0822 C-219
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-220
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1302-225-E310-049, Rev. 0 and C-1302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-221
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121 \06-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Photo MG_0760 C-222
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-223
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation's C-1 302-225-E310-049, Rev. 0 and C-1 302-225-E310-050, Rev. 0 SQ-OC-HCU-305-XX-XX, Rev 1 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-224
12Q0108.80-R-OO1, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: SO-305-121\06-19 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
DIRECTIONAL FLOW CONTROL INSERT SOLENOID VALVE (North)
Photo
.IMG-0763 C-225
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-2 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR FUEL OIL STORAGE TANK Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 18.00 ft, 03 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-226
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 4 Status: F-Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-2 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR FUEL OIL STORAGE TANK Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification SQ-OC-T-39-002 Rev 1 Evaluated by: 01T'HO Wing Ho Date: 10/10/12 j Seth Baker 10/10/12 C-227
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 4 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-2 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR FUEL OIL STORAGE TANK Photos MG_4172 MG_4174 C-228
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 4 of 4 Status: r] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-2 Equipment Class: (21) Tanks and Heat Exchangers Pni inmanf I-ac,-rinfinn-DIESEL GENERATOR FUEL OIL STORAGE TANK Mr. 4175 MG_4178 MG_4179 C-229
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-3 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR UNIT #1 FUEL OIL DAY TANK Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-230
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-3 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR UNIT #1 FUEL OIL DAY TANK Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 J 'le Seth Baker 10/10/12 C-231
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-3 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
DIESEL GENERATOR UNIT #1 FUEL OIL DAY TANK Photos MG_1137 MG_1138 C-232
12Q0108.80-R-O01, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-5 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
M-39-1 COOLING WATER TANK Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-233
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-5 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
M-39-1 COOLING WATER TANK Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-234
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: T-39-5 Equipment Class: (21) Tanks and Heat Exchangers Equipment
Description:
M-39-1 COOLING WATER TANK Photos MG 1153 MG_1155 MG_1157 C-235
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: TI-18-267 Equipment Class: (19) Temperature Sensors Equipment
Description:
ASFP HEAT EXCHANGER NN02C OUTLET TEMPERATURE Project: Oyster Creek SWEL Location (BIdg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-236
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: TI-18-267 Equipment Class: (19) Temperature Sensors Equipment
Description:
ASFP HEAT EXCHANGER NN02C OUTLET TEMPERATURE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-237
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: TI- 18-267 Equipment Class: (19) Temperature Sensors Equipment
Description:
ASFP HEAT EXCHANGER NN02C OUTLET TEMPERATURE Photo MiG_1294 C-238
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: MZ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-120 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SOUTH SCRAM DISCHARGE HDR VENT VALVE(NC53-A)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 08 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-239
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Mi N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-120 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SOUTH SCRAM DISCHARGE HDR VENT VALVE(NC53-A)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments The Valve is Consistant with BS&B Service Instruction Manual for Diaphram Control Valves NS 106 page 2 See Seismic Qualification SQ-OC-V-15-0120 Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-240
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-120 Equipment Class: (7) Fluid-Operated Valves Equipment
Description:
SOUTH SCRAM DISCHARGE HDR VENT VALVE(NC53-A)
Photo MG_0834 C-241
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-133 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
NORTH SCRAM DISCHG VOLUME DRAIN VALVE(NC52-A)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 13 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-242
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-15-133 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
NORTH SCRAM DISCHG VOLUME DRAIN VALVE(NC52-A)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments The Valve is Consistant with Flowserve Drawing 94-16252 Rev D See Seismic Qualification SQ-OC-V-15-0133 Rev 0 RTD for V-6-2917 touches valve V-1 5-133. Not an operability issue due to the relative low mass od V-6-2917 and the brass piping which is highly ductile. IR 01403039 Documents- Seismic interaction between valves V-15-133 and V-6-2917.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-243
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 5-133 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
NORTH SCRAM DISCHG VOLUME DRAIN VALVE(NC52-A)
Photos MG 0714 MG_0715 MG_0716 C-244
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Mul N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-1 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOP A PUMP SUCTION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 38.00 ft, 22 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-245
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-1 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOP 'A' PUMP SUCTION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Drawing 93-14360 Rev c Evaluated by: Wing Ho Date: 10/10/12 Seth Baker 10/10/12 C-246
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-1 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOP A PUMP SUCTION VALVE Photos MG_4182 MG_4183 MG_4184 C-247
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-212 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOPA' OUTLET HEADER VENT VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 23 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-248
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-212 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOPA' OUTLET HEADER VENT VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEE CONVAL DRAWING 10G2-105 REV B Evaluated by: O)A" Wing Ho Date: 10/10/12 Seth Baker 10/10/12 C-249
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-17-212 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
SDC LOOPA' OUTLET HEADER VENT VALVE Photos MG_4194 MG_4195 C-250
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-112 Equipment Class: (0) Other Equipment
Description:
ASFP COOLING PUMP NN01-D CASING VENT VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-251
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-112 Equipment Class: (0) Other Equipment
Description:
ASFP COOLING PUMP NN01-D CASING VENT VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-252
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-112 Equipment Class: (0) Other Equipment
Description:
ASFP COOLING PUMP NN01-D CASING VENT VALVE Photo Photo VG_1308 C-253
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-1266 Equipment Class: (0) Other Equipment
Description:
FUEL POOL MAKEUP ISOLATION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-254
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: LY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-1266 Equipment Class: (0) Other Equipment
Description:
FUEL POOL MAKEUP ISOLATION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
3" Globe Valve Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-255
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-1266 Equipment Class: (0) Other Equipment
Description:
FUEL POOL MAKEUP ISOLATION VALVE Photo 1258 C-256
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M-* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-19 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL COOLING OUTLET VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-257
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-19 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL COOLING OUTLET VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation C-1 302-251-5320-011 Dated 25 Sept 1984 See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-258
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: EIY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-19 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL COOLING OUTLET VALVE Photos MG_1264 MG_1265 C-259
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-2 Equipment Class: (0) Other Equipment
Description:
AUGMENTED SPENT FUEL POOL SYSTEM INLET VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-260
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-2 Equipment Class: (0) Other Equipment
Description:
AUGMENTED SPENT FUEL POOL SYSTEM INLET VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation C-1302-251-5320-011 Dated 25 Sept 1984 See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-261
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-2 Equipment Class: (0) Other Equipment
Description:
AUGMENTED SPENT FUEL POOL SYSTEM INLET VALVE Photos Photos MG_1300 MG_1302 C-262
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-3 Equipment Class: (0) Other Equipment
Description:
SFP COOLING PUMP (NN01-A) SUCTION ISOLATION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-263
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-3 Equipment Class: (0) Other Equipment
Description:
SFP COOLING PUMP (NN01-A) SUCTION ISOLATION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation C-1302-251-5320-011 Dated 25 Sept 1984 See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-264
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-3 Equipment Class: (0) Other Equipment
Description:
SFP COOLING PUMP (NN01-A) SUCTION ISOLATION VALVE Photo Photo MG_1251 C-265
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: EZ] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-47 Equipment Class: (0) Other Equipment
Description:
DRAIN FROM REACTOR WELL BACK TO FUEL POOL PUMPS Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-266
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-47 Equipment Class: (0) Other Equipment
Description:
DRAIN FROM REACTOR WELL BACK TO FUEL POOL PUMPS Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Calculation C-1 302-251-5320-011 Dated 25 Sept 1984 See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-267
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-47 Equipment Class: (0) Other Equipment
Description:
DRAIN FROM REACTOR WELL BACK TO FUEL POOL PUMPS Photo 1249 C-268
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-74 Equipment Class: (0) Other Equipment
Description:
AUGMENTE FUEL POOL CLG PUMP NN01-D DISCHARGE VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-269
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-74 Equipment Class: (0) Other Equipment
Description:
AUGMENTE FUEL POOL CLG PUMP NN01-D DISCHARGE VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-270
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-74 Equipment Class: (0) Other Equipment
Description:
AUGMENTE FUEL POOL CLG PUMP NN01-D DISCHARGE VALVE Photos IMG_1296 IMG-1297 C-271
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-80 Equipment Class: (0) Other Equipment
Description:
P1-18-88 ISOLATION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-272
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-80 Equipment Class: (0) Other Equipment
Description:
P1-18-88 ISOLATION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-273
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: L N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-80 Equipment Class: (0) Other Equipment
Description:
P1-18-88 ISOLATION VALVE Photo IMG_1313 C-274
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: MI N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-81 Equipment Class: (0) Other Equipment
Description:
PS-18-0080 ISOLATION ROOT VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-275
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: [* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-81 Equipment Class: (0) Other Equipment
Description:
PS-18-0080 ISOLATION ROOT VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-276
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-81 Equipment Class: (0) Other Equipment
Description:
PS-18-0080 ISOLATION ROOT VALVE Photo IMG 1306 C-277
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: [ N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-88 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FPC SYSTEM VENT VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-278
12QO108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-88 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FPC SYSTEM VENT VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-279
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-18-88 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FPC SYSTEM VENT VALVE Photo IMG 1319 C-280
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-92 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL CLG THROTTLE VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 75.00 ft, 21 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-281
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-1 8-92 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL CLG THROTTLE VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Leakage is tagged.
In-line equipment.
See calculation C-1 302-255-E310-005, Rev 000 Evaluated by: Mark Etre Date: 10/10/12 J 'W Seth Baker 10/10/12 C-282
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: [M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-I18-92 Equipment Class: (0) Other Equipment
Description:
AUGMENTED FUEL POOL CLG THROTTLE VALVE Photos MG_1261 MG_1262 C-283
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-12 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP DISCHARGE VALVE(SYSTEM I)
Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-284
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-12 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP DISCHARGE VALVE(SYSTEM I)
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments In-line equipment.
See Seismic Qualification SQ-OC-V-20-0012 Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-285
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-12 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP DISCHARGE VALVE(SYSTEM I)
Photo MG_0657 C-286
12QO108.80-R-O01, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
"A" CONTAINMENT ISO. VALVE - SYS. I Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 51.00 ft, 06 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-287
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
"A" CONTAINMENT ISO. VALVE - SYS. I Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Minor leakage.
See Seismic Qualification SQ-OC-V-20-0015 Rev 0 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-288
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-15 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
"A"CONTAINMENT ISO. VALVE - SYS. I Photo 1MG_0655 C-289
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-3 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP "A"SUCTION VALVE FROM TORUS Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 19.00 ft, 18 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-290
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-3 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP "A" SUCTION VALVE FROM TORUS Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Drawing 2065-5 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-291
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-20-3 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CORE SPRAY PUMP "A" SUCTION VALVE FROM TORUS Photos MG_1029 MG_1032 C-292
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-21-75 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CONTAINMENT ISOLATION FOR TORUS WATER CLEAN-UP Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 19.00 ft, 19 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-293
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-21-75 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
Description:
CONTAINMENT ISOLATION FOR TORUS WATER CLEAN-UP Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Drawing W8321853 Rev A Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-294
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: r N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-21-75 Equipment Class: (8) Moto r-Operated and Solenoid-Operated Valves Equipment
Description:
CONTAIINMENT ISOLATION FOR TORUS WATER CLEAN-UP Photo AlG_1041 C-295
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-109 Equipment Class: (0) Other Equipment
Description:
EDGI PRIMING PUMP SUCTION VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-296
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: ] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-109 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP SUCTION VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 In-Line equipment Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-297
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M-I N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-109 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP SUCTION VALVE Photos MG 1170 MG_1172 MG_1 173 C-298
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: Fli N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-110 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP DISCHARGE VALVE Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 23.00 ft, 01 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-299
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-110 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP DISCHARGE VALVE Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See SQ-OC-M-39-001 Rev 06 Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-300
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-110 Equipment Class: (0) Other Equipment
Description:
EDG1 PRIMING PUMP DISCHARGE VALVE Photos MG 1170 MG_1 172 MG_1173 C-301
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: rY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-2 Equipment Class: (0) Other Equipment
Description:
ISOLATION VALVE FOR TANK T-39-002 OUTLET Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): DG BLDG, 18.00 ft, 03 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Not Applicable
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Not Applicable
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Not Applicable
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-302
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: F N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-2 Equipment Class: (0) Other Equipment
Description:
ISOLATION VALVE FOR TANK T-39-002 OUTLET Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: Wing Ho Date: 10/10/12 Seth Baker 10/15/12 C-303
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: V-39-2 Equipment Class: (0) Other Equipment
Description:
ISOLATION VALVE FOR TANK T-39-002 OUTLET Photos IMUi.41b( IMG_4169 C-304
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 Equipment Class: (14) Distribution Panels Equipment
Description:
120V VITAL AC POWER PANEL 208/120V,3PH,4W,60HZ Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 10 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-305
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 4 Status: jT] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 Equipment Class: (14) Distribution Panels Equipment
Description:
120V VITAL AC POWER PANEL 208/120V,3PH,4W,60HZ Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments See Seismic Qualification No. SQ-OC-VACP-1, Rev 0 Anchor bolts behind panel verified by touch.
Above panel is far enough away and has rigid enough support to preclude interaction.
Calculation C-1 302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/10/12 Seth Baker 10/10/12 C-306
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 3 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 Equipment Class: (14) Distribution Panels Equipment
Description:
120V VITAL AC POWER PANEL 208/120V,3PH,4W,60HZ Photos MG_0929 MG_0931 C-307
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 1 of 3 Status: EY- N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 XF Equipment Class: (4) Transformers Equipment
Description:
120V VITAL AC POWER PANEL TRANSFORMER 480/208/120V Project: Oyster Creek SWEL Location (Bldg, Elev, Room/Area): RB, 23.00 ft, 10 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
- 5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-308
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 2 of 3 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 XF Equipment Class: (4) Transformers Equipment
Description:
120V VITAL AC POWER PANEL TRANSFORMER 480/208/120V Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures? Yes
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? Yes
- 10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?
Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Equipment was verified as consistent with SQ-OC-VACP-1 XFMR, Rev. 0 Calculation C-1 302X-322C-A06 qualifies the Oyster Creek safety-related masonry walls for seismic to address NRC IE Bulletin 80-11.
Evaluated by: Mark Etre Date: 10/15/12 Seth Baker 10/15/12 C-309
12Q0108.80-R-001, Rev. I Correspondence No.: RS-12-177 Sheet 3 of 3 Status: FY] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 XF Equipment Class: (4) Transformers Equipment
Description:
120V VITAL AC POWER PANEL TRANSFORMER 480/208/120V Photos IMUN UzU IMG_0921 C-310
12Q0108.80-R-001, Rev. 1 Correspondence No.: RS-12-177 Sheet 4 of 4 Status: M N U Seismic Walkdown Checklist (SWC)
Equipment ID No.: VACP-1 Equipment Class: (14) Distribution Panels Equipment
Description:
120V VITAL AC POWER PANEL 208/120V,3PH,4W,60HZ SQUG SEWS EBASCO SERVICES INcORPORATED Two World Trace Center. New York. N.Y 10048 April 29, 1981 CPU Services Incorporated Attention: Mr. Leon Caribian 100 Interpace Parkway Parsippany, NJ 07054
Dear Leon:
Re: OYSTER CREEK NUCLEAR STATION FINAL SUBMITTAL OF MASONRY WALL EVALUATION CALCULATION BOOKS I am sending to you together with this letter,20 volumes of calculation books and 11 volumes of computer output. This will mark the end of our 0 involvement for the re-evaluation of the Safety-Related Concrete Walls as required by NRC IE Bulletin 80-11, Masonry Should you have any questions regarding the calculations and sketches, please do not hestitate to call. We will be glad to help.
Very truly yours, E Odar Assistant Chief Civil Engineer GW:dl cc: K D Chin C Wu C1302X322CA06 VOL 1, 19810427, REEVALUATION OF CONCRETE MASONRY WALL NRC IE BULLETIN 80-11 GENERAL C-311