Independent Spent Fuel Storage Facility - Submittal of 2017 Annual Radiological Environmental Operating Report
ML18134A042
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/09/2018
From: Bates A
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML18134A032 List:
References
Download: ML18134A042 (2)


Text

- - - - - - - - - - --

SOUTHERN CALIFORNIA Al Bates Manager EDISON'~ . Regulatory Affairs &

An EDISON lN1'ERNATlONAL Company Nuclear Oversight 10 CFR 50.36a May 9, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-206, 50-361, 50-362 and 72-41 2017 Annual Radiological Environmental Operating Report San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3 and Independent Spent Fuel Storage Facility

Dear Sir or Madam:

As required by San Onofre Nuclear Generating Station (SONGS) Unit 1 Permanently Defueled Technical Specification (TS) Section D6.9.1.3 and SONGS Units 2 and 3 Permanently Defueled TS Section 5.7.1.2, "Annual Radiological Environmental Operating Report," Southern California Edison (SCE) is submitting the 2017 Annual Radiological Environmental Operating Report (AREOR) for SONGS Units 1, 2 and 3. The AREOR covers the operation of SONGS during January 1, 2017 through December 31, 2017 and includes summaries, interpretations, and analyses of trends of the results of the Radiological Environmental Monitoring Program (REMP).

In addition, the AREOR includes the results for direct radiation monitoring near the Independent Spent Fuel Storage Installation.

This letter does not contain any commitments.

If you have any questions or require additional information, please contact me at (949) 368-6945.

Enclosure:

2017 San Onofre Nuclear Generating Station Annual Radiological Environmental Operating Report cc: K. M. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 W. C. Allen, NRC Project Manager, SONGS ISFSI R. K Lupo, California Department of Public Health

Enclosure 2017 San Onofre Nuclear Generating Station Annual Radiological Environmental Operating Report

SOUTHERN CALIFORNIA Al Bates Manager EDISON'~ . Regulatory Affairs &

An EDISON lN1'ERNATlONAL Company Nuclear Oversight 10 CFR 50.36a May 9, 2018 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Subject:

Docket Nos. 50-206, 50-361, 50-362 and 72-41 2017 Annual Radiological Environmental Operating Report San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3 and Independent Spent Fuel Storage Facility

Dear Sir or Madam:

As required by San Onofre Nuclear Generating Station (SONGS) Unit 1 Permanently Defueled Technical Specification (TS) Section D6.9.1.3 and SONGS Units 2 and 3 Permanently Defueled TS Section 5.7.1.2, "Annual Radiological Environmental Operating Report," Southern California Edison (SCE) is submitting the 2017 Annual Radiological Environmental Operating Report (AREOR) for SONGS Units 1, 2 and 3. The AREOR covers the operation of SONGS during January 1, 2017 through December 31, 2017 and includes summaries, interpretations, and analyses of trends of the results of the Radiological Environmental Monitoring Program (REMP).

In addition, the AREOR includes the results for direct radiation monitoring near the Independent Spent Fuel Storage Installation.

This letter does not contain any commitments.

If you have any questions or require additional information, please contact me at (949) 368-6945.

Enclosure:

2017 San Onofre Nuclear Generating Station Annual Radiological Environmental Operating Report cc: K. M. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 W. C. Allen, NRC Project Manager, SONGS ISFSI R. K Lupo, California Department of Public Health

Enclosure 2017 San Onofre Nuclear Generating Station Annual Radiological Environmental Operating Report