ML20009C565

From kanterella
Revision as of 23:50, 27 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 81-021/03L-0:on 810611,found Visual Verification of Valve Motion & Limit Switch Not Performed During Refueling Outage for Valves Inaccessible During Normal Operation Per Iwv 3300 of 1974 ASME Code.Caused by Procedural Oversight
ML20009C565
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/10/1981
From: Lindberg P, Molzahn D
WISCONSIN PUBLIC SERVICE CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20009C561 List:
References
LER-81-021-03L, LER-81-21-3L, NUDOCS 8107210230
Download: ML20009C565 (1)


Text