ML19329B580

From kanterella
Revision as of 15:15, 6 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
RO NP-32-77-08:on 770717,decay Heat Stop Check Valve Leaked When Core Flood Isolation Valve Opened,Allowing Water from Core Flood Tank to Reverse Flow Into Decay Heat Piping. Caused by Component Failure.Rcs Depressurized & Cooled Down
ML19329B580
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/28/1977
From: Batch S, Lingenfelter J
TOLEDO EDISON CO.
To:
Shared Package
ML19329B509 List:
References
NUDOCS 8002050715
Download: ML19329B580 (5)


Text