December 2004 Monthly Operating Report Kewaunee Nuclear Power Plant
ML050190245
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 01/12/2005
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-05-003
Download: ML050190245 (3)


Text

Committed to Nudear Exel e 5 Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC January 12, 2005 NRC-05-003 TS 6.9.a.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 Monthly Operating Report In accordance with Technical Specification 6.9.a.3., enclosed is the Monthly Operating Report for December 2004 for the Kewaunee Nuclear Power Plant.

Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region ll, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center N490 Highway 42

  • Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560 5e-- ' -)(

UNIT SHUTDOWNS DOCKET NO. 50-305 UNIT NAME Kewaunee DATE January 12,2005 COMPLETED BY Mary Anderson TELEPHONE (920) 388-8453 REPORTING PERIOD December, 2004 METHOD AE NO DATE Type Type DURATION (o. REASON2 O SHUTTING CAUSE/CORRECTIVE ACTIONS DOWN REACTOR 3 Continuation/conclusion of Cycle XXVI-XXVII Refueling Outage.

5 12/01/04 S 79.83 C 4 G-1 was closed at 0750 on 12/04.

100% power was reached at 2114 on 12/14.

(1) (2) (3)

F: Forced Reason: Method:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & License Examination Continuation F - Administrative 5 - Load Reductions G - Operational Error (Explain) 9 - Other H - Other (Explain)

SUMMARY

The unit continues to operate at 100%, steady state power.

OPERATING DATA REPORT DOCKET NO. 50-305 Notes:

UNIT NAME Kewaunee Unit continues to operate at 100%

steady state power.

DATE January 12, 2005 COMPLETED Mary Anderson BY TELEPHONE (920) 388-8453 REPORTING PERIOD December, 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 574
2. MAXIMUM DEPENDABLE CAPACITY (MWE- 556 NET)

YEAR-TO-MONTH DATE CUMULATIVE

3. NUMBER OF HOURS REACTOR WAS CRITICAL 703.3 7115.8 228535.5
4. NUMBER OF HOURS GENERATOR WAS ON LINE 664.2 7050.3 226237.3
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 10.0
6. NET ELECTRICAL ENERGY (MWH) 326962 3873882 113675241