MONTHYEARML24212A0372024-08-0707 August 2024 Summary of July 23, 2024, Teleconference with Wolf Creek Nuclear Operating Corporation Regarding Wolf Creek Generating Station, Unit 1, Amendment No. 237, Allowing the Use of Portable Lighting ML24088A3122024-04-0101 April 2024 Summary of March 25, 2024, Teleconference with Wolf Creek Nuclear Operating Corporation Regarding Revised Safety Evaluation for Wolf Creek Generating Station Unit 1, Amendment No. 237, Allowing the Use of Portable Lighting ML23303A2182023-11-0606 November 2023 Summary of October 16, 2023, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regarding a License Amendment Request to Adopt TSTF-505 for Wolf Creek Generating Station, Unit 1 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22011A0862022-01-11011 January 2022 Summary of January 10, 2022, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regarding a License Amendment Request to Use Portable Lighting for Wolf Creek Generating Station, Unit 1 ML21333A1312021-12-0707 December 2021 Summary of Meeting with Wolf Creek Nuclear Operating Corporation Diesel Generator Completion Time License Amendment Request for Wolf Creek Generating Station ML21200A1102021-07-21021 July 2021 Summary of July 13, 2021, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regarding a Temporary Emergency Preparedness Exercise Exemption Request ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21127A1322021-05-11011 May 2021 Summary of April 16, 2021, Conference Call with Representatives of Wolf Creek Generating Station Regarding the Spring 2021 Steam Generator Tube Inspections ML20332A0422020-12-0101 December 2020 Summary of November 19, 2020, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation an Emergency Response Organization Staffing License Amendment Request ML20332A0462020-11-30030 November 2020 Summary of November 18, 2020, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation a Risk-Informed Generic Safety Issue (GSI)-191 License Amendment Request ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19143A4182019-05-21021 May 2019 Summary of Public Meeting with Wolf Creek Nuclear Operation Corporation ML19140A4742019-05-20020 May 2019 Closed Meeting with Wolf Creek Nuclear Operating Corporation to Conduct a Mediation Session Regarding Falsification of Documentation Associated with Licensee Maintenance Activities ML18313A2542018-11-16016 November 2018 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation Regarding License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses for Wolf Creek Generating Station ML17276B4892017-10-23023 October 2017 9/25/17 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation Regarding the Proposed LAR for Change in Emergency Plan Staff Augmentation Response Times for Wolf Creek Generating Station (CAC No. MG0174; EPID L-2017-LRM-001 ML16271A4822016-09-27027 September 2016 Summary of Regulatory Conference to Discuss Safety Significance of Wolf Creek Generating Station Emergency Generator Excitation Diode Apparent Violation ML16250A1652016-09-0909 September 2016 8/25/16 Summary of Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Amendment Request to Transition to Westinghouse Analyses Methodologies and Alternate Source Term at Wolf Creek Generating Station ML16243A5132016-09-0101 September 2016 Summary of August 25, 2016, Public Meeting with Wolf Creek Nuclear Operating Corporation and Amerenue Regarding a Proposed Application for a New Technical Specification for the Class 1E Electrical Equipment Air Conditioning System (MF8118 a ML16106A1742016-04-22022 April 2016 Summary of Meeting with Wolf Creek Nuclear Operating Company to Discuss the Generic Safety Issue (GSI)-191 Testing Plan/Fiber Penetration and Head Loss Testing Approach for Wolf Creek Generating Station ML15182A0952015-06-30030 June 2015 Summary of Annual Assessment Meeting with Wolf Creek Nuclear Operating Corporation (WCNOC) Regarding Wolf Creek Generating Station 2014 Performance ML14188C4812014-07-0707 July 2014 Summary of Annual Assessment Meeting with Wolf Creek Generating Station ML14134A1842014-05-14014 May 2014 Summary of Public Meeting to Discuss an Apparent Violation Identified at Wolf Creek Generating Station ML14038A3852014-02-0606 February 2014 1/22/2014 - Summary of Public Meeting to Discuss Corrective Actions Implemented to Address the Chilling Effect Letter ML13221A2152013-08-12012 August 2013 7/30/2013 - Summary of Preapplication Meeting with Wolf Creek Nuclear Operating Company to Discuss Proposed Transition to Westinghouse Methodologies for Core Design and Non-LOCA Safety Analyses at Wolf Creek Generating Station ML13221A2132013-08-12012 August 2013 8/7/2013 - Summary of Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13121A4892013-05-0101 May 2013 End of Cycle Meeting Summary 4-18-13 ML13077A0732013-04-0101 April 2013 Summary of 2/28/13 and 3/11/13 Conference Calls with Licensee and Its Contractors Ongoing Steam Generator Tube Inspection Activities During Refueling Outage 19 ML12355A6922012-12-20020 December 2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corp Re Improved Station Performance ML12276A2652012-11-0101 November 2012 Meeting Summary with Wolf Creek Nuclear Operating Corporation to Discuss Transition from Current to NRC-Approved Westinghouse Methodologies for Performing the Core Design and Non-LOCA Safety Analysis at Wolf Creek ML12191A1742012-07-0909 July 2012 6/25/2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML12191A1462012-07-0606 July 2012 6/26/2012 - Summary of Public Meeting to Discuss Performance of Wolf Creek Nuclear Operating Corporation ML13246A3802012-05-0808 May 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Tuesday, May 8, 2012 ML1207601012012-03-16016 March 2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML13246A3782012-02-16016 February 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Thursday, February 16, 2012 ML13246A3772012-01-31031 January 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Tuesday, January 31, 2012 ML13246A3762012-01-23023 January 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Monday, January 23, 2012 ML12011A1012012-01-19019 January 2012 Summary of Meeting with NEI and to Address Di&C Issues ML13246A3742012-01-17017 January 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Tuesday, January 17, 2012 ML1110104292011-04-11011 April 2011 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Wolf Creek Generating Station Performance for the NRC Inspection Period Ending December 31, 2010 ML1024506282010-09-0202 September 2010 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML1013404892010-05-14014 May 2010 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Wolf Creek Generating Station Performance for the NRC Inspection Period from January 1 Through December 31, 2009 ML0933805662009-12-17017 December 2009 Summary of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 Sent 7/31/2009 and 8/27/2009, Respectively ML0933702032009-12-0303 December 2009 Summary of Public Meeting for Wolf Creek Generating Station ML0924607142009-09-28028 September 2009 Summary of Meeting with Union Electric Co., and Wolf Creek, to Discuss Draft Requests for Additional Information on GL 2004-02 for Callaway, Unit 1, and Wolf Creek ML0911205282009-04-21021 April 2009 Summary of Annual Performance Assessment Meeting for Wolf Creek Generating Station ML0902102062009-01-23023 January 2009 Summary of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Changes to Post Fire Shutdown Unresolved Items Analysis Methods Pre-Application for Wolf Creek Generating Station ML0829607972008-10-22022 October 2008 Summary of Meeting with Wolf Creek, Discussing Several Initiatives Being Implemented to Improve Plant Performance ML0817706682008-06-25025 June 2008 Summary of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Several Initiatives That Were Being Implemented to Improve Plant Performance at Wolf Creek ML0813606472008-06-10010 June 2008 05/01/2008-Summary of Public Meeting on Safety Evaluation Report with Open Items Regarding the Wolf Creek Generating Station License Renewal Review 2024-08-07
[Table view] Category:Memoranda
MONTHYEARML23179A2132023-07-0505 July 2023 Approval for Credit for the Wolf Creek Generating Station Operational Safety Review Team to the Baseline Inspection Samples/Hours ML22165A0882022-06-14014 June 2022 Information Request, Security IR 2022403 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21309A5482021-11-15015 November 2021 NSIR Staff Review of the Wolf Creek Generating Stations Security Plan Training & Qualification Plan & Safeguards Contingency Plan for the Verification of ASM EA 20 091 Incorporation ML21243A4492021-09-0202 September 2021 ISFSI Technical Assistance Request - Review of Physical Security Plan ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML17019A2912017-01-19019 January 2017 Notice of Closed Regulatory Conference with Wolf Creek Generating Station ML17019A2932017-01-19019 January 2017 Notice of Closed Regulatory Conference with Wolf Creek Generating Station ML16064A1872016-03-0404 March 2016 Closed Pre-Decisional Enforcement Conference with Wolf Creek Nuclear Operating Corporation ML15251A0092015-09-11011 September 2015 Review of Revision 28 to the Updated Safety Analysis Report ML15015A1712015-01-0808 January 2015 Focused Baseline Inspection at the Wolf Creek Site for a Major Essential Service Water Modification ML14197A3442014-07-25025 July 2014 Review of Revision 27 to the Updated Safety Analysis Report ML13204A2432013-07-24024 July 2013 Notice of Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13109A2342013-07-12012 July 2013 Safety Evaluation Regarding Wolf Creek Generating Station - Loss of Offsite Power and Augmented Inspection, Issue for Resolution 2012-004 ML13179A1012013-07-0909 July 2013 7/30/13 Notice of Forthcoming Preapplication Meeting with Wolf Creek Nuclear Operating Company to Discuss Proposed Transition to Westinghouse Methodologies for Core Design and Non-LOCA Safety Analyses at Wolf Creek Generating Station ML13093A0592013-04-0202 April 2013 Public Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Performance Assessment Results for Wolf Creek Generating Station for 2012 ML13078A1552013-03-20020 March 2013 License Amendment Request to Change Diesel Generator Surveillance Requirements ML12249A0292012-09-0606 September 2012 9/20/12 Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Transition from Current to NRC-Approved Westinghouse Methodologies for Performing the Core Design and Non-LOCA Safety Wolf Creek Station ML1222602142012-08-16016 August 2012 Iolb Evaluation of Ifr 2012-04 Relating to Wolf Creek Loss of Offsite Power and Notification of Unusual Event ML12011A1012012-01-19019 January 2012 Summary of Meeting with NEI and to Address Di&C Issues ML1101106702011-02-0707 February 2011 Fire Protection Safety Evaluation Input for Wolf Creek Generating Station Regarding License Amendment Request for Deviation from the Fire Protection Program Requirements ML1006010322010-03-0101 March 2010 Cy 2009 Baseline Inspection Completion ML0929300152009-10-20020 October 2009 Revised Notice of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 ML0928003162009-10-16016 October 2009 Notice of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 Sent 7/31/0209 and 8/27/2009, Respectively ML0925404602009-09-10010 September 2009 Summary of Phone Call with Industry to Issues Related to Eccentricity of the Steam Generator Tube-to-Tubesheet Joints in the Finite Element Model Used for the Technical Basis of the Permanent Alternate Repair Criteria License Amendment Requ ML0920306202009-07-31031 July 2009 Notice of Forthcoming Conference Call with Union Electric Company and Wolf Creek Nuclear Operating Company Re Draft Requests for Additional Information on Generic Letter 2004-02 for Callaway Plant and Wolf Creek Creek Generating Station ML0917002962009-07-30030 July 2009 Issuance of Amendment 183, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation, to Extend the Surveillance Frequency on ESFAS Slave Relays from 92 Days to 18 Months ML0835705252008-12-24024 December 2008 Meeting Notice, Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Pre-Application of Post-fire Safe Shutdown Issues at Wolf Creek ML0829405182008-11-10010 November 2008 Renewal of Full-Power Operating License for the Wolf Creek Generating Station, Unit 1 ML0813006882008-05-0909 May 2008 03/05/2008 Meeting Minutes of Subcommittee on Plant License Renewal Regarding Wolf Creek Generating Station ML0812001002008-04-29029 April 2008 End of Cycle Meeting with Wolf Creek Nuclear Operation Corporation IR 05000482/20080072008-04-24024 April 2008 IR 05000482-08-007, on 01/15/2008 - 03/13/2008, Wolf Creek Generating Station, NRC Special Inspection ML0810805452008-04-18018 April 2008 05/01/2008-Notice of Forthcoming Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Safety Evaluation Report Open Items Related to Metal Fatigue Analyses for License Renewal ML0807904692008-04-10010 April 2008 Summary of Teleconference with Wolf Creek Nuclear Operating Corporation, Ameren Union Electric Company for Callaway Plant, and Performance Contracting, Inc. Containment Sump Head Loss Testing ML0802500852008-03-26026 March 2008 Summary of Second Conference Call Held on January 16, 2008, with PWR Licensees on New Temporary License Amendment Needed for Steam Generator Tube Inspections in Spring 2008 Refueling Outages ML0807404192008-03-14014 March 2008 Assessment of Inspections of Dissimilar Metal Butt Welds in a Retired Pressurizer ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0807304562008-03-13013 March 2008 Cy 2007 Baseline Inspection Completion ML0804503232008-03-0303 March 2008 Summary of Third Conference Call Held with Pressurized-Water Reactor Licensees on Status of NRC Review of License Amendment Requests for Steam Generator Tube Inspections ML0807300242008-02-22022 February 2008 Status Report and Proposed Agenda for the ACRS Subcommittee on March 5, 2008 Related to the License Renewal Application of Wolf Creek Generating Stations Unit 1 ML0804504682008-02-19019 February 2008 Federal Register Notice Regarding the Meeting of the ACRS Subcommittee on Wolf Creek Plant License Renewal Application, March 5, 2008 ML0803603712008-02-0707 February 2008 Advisory Sub-Committee on Reactor Safeguards Review of the Wolf Creek Generating Station, License Renewal Application - Safety Evaluation Report with Open Items ML0800901542008-01-22022 January 2008 Summary of Conference Call Held with PWR Licensees on the Temporary License Amendment Needed for Steam Generator Tube Inspections in Spring 2008 Refueling Outages ML0733103642007-11-27027 November 2007 Revised Notice of Meeting with Wolf Creek Nuclear Operating Corp, to Discuss NRC Staff'S Request for Information on Licensee'S Supplemental Letter Dated September 27, 2007, to the Application Dated February 21, 2006, to Revise TS 5.5.9 ML0733101982007-11-27027 November 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation, to Discuss NRC Staff'S Request for Additional Information on Licensee'S Proposed Main Steam and Feedwater Isolation System Modification in Its Application Dated March 14, 2007 ML0732500032007-11-21021 November 2007 Memo to Thomas G. Hiltz Key Issues for Discussion for November 28, 2007 Meeting on Steam Generator Tube Inspection License Amendment (Tac MD0197) ML0730901272007-11-0808 November 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss NRC Staff'S Request for Additional Information on Licensee'S Supplemental Letter to Letter Dated September 27, 2007, to Application Dated February 21, 2006 ML0727000542007-10-0202 October 2007 Summary of Telephone Conference Call Held on 9/26/07, Between the U.S. NRC and Wolf Creek Nuclear Operating Corporation, Concerning Draft Requests for Additional Information Pertaining to the Wolf Creek Generating Station, Unit 1, LRA 2023-07-05
[Table view] |
Text
May 14, 2007 MEMORANDUM TO: Robert Hardies, Chief Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research FROM: Mauricio Gutierrez, General Engineer /RA/
Component Integrity Branch Division of Fuel, Engineering, and Radiological Research Office of Nuclear Regulatory Research
SUBJECT:
SUMMARY
OF THE MAY 1, 2007, CATEGORY 2 PUBLIC MEETING BETWEEN THE NUCLEAR REGULATORY COMMISSION STAFF AND THE EXPERT PANEL FOR THE WOLF CREEK ADVANCED FINITE ELEMENT ANALYSES (FEA)
On May 1, 2007, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a Category 2 public meeting with industry representatives at Dominion Engineering, Incorporated in Reston, VA. A list of attendees, the industry presentation, and the NRC presentation are enclosed. The meeting was one of a series of meetings being held between industry representatives and NRC staff to discuss the industrys advanced finite element fracture mechanics analysis program undertaken to address NRC staffs question concerning the likelihood that rupture may occur in some cases without prior evidence of leakage in pressurizer nozzle welds susceptible to primary water stress corrosion cracking.
The meeting specifically addressed weld residual stress inputs and validation. Industry representatives presented information regarding nozzle-to-safe end geometries and dimensions, loads, and past weld residual stress model results for the proposed Phase II advanced FEA calculations (see Enclosure 2). NRC staff and its contractor, the Engineering Mechanics Corporation of Columbus, followed by presenting weld residual stress profiles developed under past NRC programs (Enclosure 3). It was noted that results from both parties provided similar results although the analytical approaches may differ. The participants also began discussing the development of a list of weld residual stress (WRS) distribution cases that the industry will need to calculate in the context of the overall analysis matrix. The list of analysis cases primarily will be composed of reported weld repairs. Since records of fabrication and repair histories do not necessarily represent all welding and rework performed, the cases discussed may need to be amplified by either additional cases or sensitivity studies on some of the parameters or both.
CONTACT: Mauricio R. Gutierrez, RES/DFERR 301-415-1122
R. Hardies The meeting concluded with discussions on the differences between validation and benchmarking of weld residual stress model results. No members of the public were present at the meeting. The information discussed was non-proprietary. Please direct any inquiries to me at 301-415-1122 or mrg3@nrc.gov.
Enclosures:
- 1. List of Attendees
- 2. Dominion Engineering Presentation
- 3. Engineering Mechanics Corporation of Columbus Presentation
R. Hardies The meeting concluded with discussions on the differences between validation and benchmarking of weld residual stress model results. No members of the public were present at the meeting. The information discussed was non-proprietary. Please direct any inquiries to me at 301-415-1122 or mrg3@nrc.gov.
Enclosures:
- 1. List of Attendees
- 2. Dominion Engineering Presentation
- 3. Engineering Mechanics Corporation of Columbus Presentation DISTRIBUTION:
ME R/F DFERR R/F OAR in ADAMS? (Y or N) Y ADAMS ACCESSION NO: PKG ML071360367 TEMPLATE NO. NRC- 001 Publicly Available? (Y or N) Y DATE OF RELEASE TO PUBLIC: 05/15/07 SENSITIVE? N To receive a copy of this document, indicate in the box: C = Copy without attachment/enclosure E" = Copy with attachment/enclosure N" = No copy OFFICE RES/DFERR/CIB RES/DFERR/CIB RES/DFERR/CIB SUNSI REVIEW Originator NAME M. Gutierrez A. Csontos /RA/ Shah R. Hardies M. Gutierrez Malik for DATE 05/14/07 05/14/07 05/14/07 05/14/07 OFFICE SUNSI REVIEW Branch Chief NAME R. Hardies DATE 05/14/07 OFFICIAL RECORD COPY
DISTRIBUTION FOR
SUMMARY
OF CATEGORY 2 PUBLIC MEETING WITH THE EXPERT PANEL FOR THE WOLF CREEK ADVANCED FEA ANALYSES Date: 05/15/07 PUBLIC PSPB Reading File RidsNrrAdro RidsNrrDpr RidsNrrDprPspb RidsNrrPMTMensah RidsNrrLADBaxley RidsOpaMail MMurphy RidsNrrDciCpnb ESullivan JGrobe MEvans WBateman TChan TLupold RHardies MKhanna ACsantos Ssheng MGutierrez PMNS RJasinski RidsOgcMailCenter RidsAcrsAcnwMailCenter Receptionist (OWFN and TWFN)
RidsNrrDe
Nuclear Regulatory Commission Meeting with the Expert Panel for Wolf Creek Finite Element Analysis May 1, 2007 U.S. NUCLEAR REGULATORY COMMISSION Edmund Sullivan Aladar Csontos Simon Sheng Tim Lupold Dave Rudland (NRC Contractor)
Mauricio Gutierrez INDUSTRY Ken Yoon, AREVA NP Craig Harrington, EPRI Glenn White, DEI Jean Collin, DEI John Broussard, DEI Tim Gilman, Structural Integrity Doug Killian, AREVA (on telephone)
Pete Riccardella, SIA Warren Bamford, Westinghouse Brandon Jenewein, South Texas Project Nuclear Operating Company (STPNOC)
Craig Younger, STPNOC Suryakant Patel, STPNOC Richard Hall, Exelon Rudy Giil, RPL Wayne Harrison, STPNOC Enclosure 1
cc:
Mr. Anthony Pietrangelo, Vice President Mr. Alexander Marion, Executive Director Regulatory Affairs Nuclear Operations & Engineering Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 arp@nei.org am@nei.org Mr. Jack Roe, Director Mr. Jay Thayer, Vice President Operations Support Nuclear Operations Nuclear Energy Institute Nuclear Energy Institute 1776 I Street, NW, Suite 400 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Washington, DC 20006-3708 jwr@nei.org jkt@nei.org Mr. Charles B. Brinkman Mr. John Butler, Director Washington Operations Safety-Focused Regulation ABB-Combustion Engineering, Inc. Nuclear Energy Institute 12300 Twinbrook Parkway, Suite 330 1776 I Street, NW, Suite 400 Rockville, MD 20852 Washington, DC 20006-3708 brinkmcb@westinghouse.com jcb@nei.org Mr. Gary L. Vine, Executive Director Mr. James H. Riley, Director Federal and Industry Activities, Nuclear Engineering Sector Nuclear Energy Institute EPRI 1776 I Street, NW 2000 L Street, NW, Suite 805 Washington, DC 20006-3708 Washington, DC 20036 jhr@nei.org gvine@epri.com Mr. David J. Modeen Mr. James Gresham, Manager Vice President and Chief Nuclear Officer Regulatory Compliance and Plant Licensing EPRI Westinghouse Electric Company 1300 W. T. Harris Boulevard P.O. Box 355 Charlotte, NC 28262-8550 Pittsburgh, PA 15230-0355 dmodeen@epri.com greshaja@westinghouse.com Mr. John Gaertner Ms. Barbara Lewis EPRI Assistant Editor 1300 W.T. Harris Boulevard Platts, Principal Editorial Office Charlotte, NC 28262-8550 1200 G St., N.W., Suite 1100 jgaertner@epri.com Washington, DC 20005 Barbara_lewis@platts.com Ms. Rosa Yang EPRI Mr. Gary Welsh 3412 Hillview Avenue Institute of Nuclear Power Operations Palo Alto, CA 94304-1338 Suite 100 ryang@epri.com 700 Galleria Parkway, SE Atlanta, GA 30339-5957 welshgc@inpo.org
Mr. Kenneth Huffman EPRI 1300 W. T. Harris Boulevard Charlotte, NC 28262-8550 khuffman@epri.com