MEMORANDUM TO:
Francis Peduzzi, Chief Inspection and Oversight Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards FROM:
Alison L. Rivera, Chief Materials Security Branch Division of Physical and Cyber Security Policy Office of Nuclear Security and Incident Response
SUBJECT:
STAFF REVIEW OF THE WOLF CREEK GENERATING STATION SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN, FOR THE VERIFICATION OF ASM (EA-20-091) INCORPORATION (CAC NO. 001027)
The staff has completed its review of Wolf Creek Generating Station Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, (PSP).
Based on our review, we find the submitted PSP to be acceptable and the Wolf Creek PSP has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55, and the Additional Security Measures imposed by NRC Order EA-20-091.
A physical security inspection (IR No. 07200079/2021401) was completed on October 21, 2021 which verified the PSP successfully meets the objectives outlined in IP 81311. Based on staffs observations, the Wolf Creek Generating Station PSP has met the performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation, Section 73.55 and the Additional Security Measures (ASMs) imposed by the NRC.
Docket No. 50-482, 72-79 CONTACT: Douglas Garner, Materials Security Branch 301-287-0929 November 15, 2021 Signed by Rivera, Alison on 11/15/21
Memo ML21309A548 OFFICE NSIR/DPCP/MSB NSIR/DPCP/MSB NAME DGarner ARivera DATE Nov 10, 2021 Nov 15, 2021