Public Meeting Summaries on the Duane Arnold Frequently Asked Question (FAQ) Appeal Meeting on November 14, 2007, and the Reactor Oversight Process Meeting Held on December 5, 2007
ML080070527
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/10/2008
From: Jacqueline Thompson
NRC/NRR/ADRO/DIRS/IPAB
To: James Anderson
NRC/NRR/ADRO/DIRS/IPAB
Thompson J, NRR/DIRS/IPAB 415-1011
Shared Package
ML080070543 List:
References
Download: ML080070527 (8)


Text

January 10, 2008 MEMORANDUM TO: James W. Andersen, Chief Performance Assessment Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM: John Thompson, Senior Reactor Operations Engineer Performance Assessment Branch/RA/

Division of Inspection and Regional Support Office of Nuclear Reactor Regulation

SUBJECT:

PUBLIC MEETING SUMMARIES ON THE DUANE ARNOLD FREQUENTLY ASKED QUESTION (FAQ) APPEAL MEETING ON NOVEMBER 14, 2007, AND THE REACTOR OVERSIGHT PROCESS MEETING HELD ON DECEMBER 5, 2007 On November 14, 2007, the staff hosted a performance indicator frequently asked question (FAQ) appeal meeting. The subject of the meeting was on the unplanned reactor scram performance indicator and a reactor scram at the Duane Arnold facility. The attendance list for the November 14, 2007, meeting is contained in Enclosure 1. The agenda for the meeting is contained in Enclosure 2.

During the meeting, the Nuclear Energy Institute (NEI) presented the industry position on the performance indicator guidance contained in NEI 99-02, Regulatory Assessment Performance Indicator Guideline, and how it related to the Duane Arnold event (Enclosure 5). The licensee then discussed the scram event, the circumstances leading up to the event, and their view of the guidance (Enclosure 6). The licensee concluded that based on their interpretation, the scram should not count toward the indicator. The staff then presented its views on the event and guidance, concluding that the scram should count towards the indicator (Enclosure 7).

After several questions, the meeting concluded and the Director, Division of Inspection and Regional Support (DIRS) stated that he would make his decision prior to the December 5, 2007, Reactor Oversight Process (ROP) Working Group public meeting.

On December 5, 2007, the staff hosted the monthly ROP Working Group public meeting. The attendance list for the December 5, 2007, meeting is contained in Enclosure 3. The agenda for the meeting is contained in Enclosure 4.

CONTACT: John Thompson, DIRS/NRR 301-415-1011

J. Andersen Discussions by the meeting attendees included the safety culture lessons learned and the status of the NRC cross-cutting issue task force effort, a revision to Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program, double-counting performance indicators and inspection findings in the ROP Action Matrix, and the Operating Experience Smart Sample (OpESS) pilot program (Enclosure 8). During the discussion of safety culture, the staff discussed some of its early observations, possible changes in guidance, and solicited additional input from the industry on the enhancements in this area (Enclosure 9).

Meeting attendees then discussed the status of current NRC initiatives regarding the significant determination process (SDP) appeal process, several Public Radiation Cornerstone SDP changes, ROP realignment, and Regulatory Issue Summary (RIS) 2007-021, Adherence to Licensed Power Limits.

Meeting attendees also discussed the status of the staffs lessons learned review of Mitigating Systems Performance Index (MSPI) experience, which is being performed by an NRC contractor. The staff also discussed possible changes to the performance indicator guidance, specifically, the unplanned scrams performance indicator, the unplanned power changes indicator, and MSPI based on recent FAQ decisions.

The attendees then discussed open performance indicator frequently asked questions (FAQs).

The staff provided the Director of the Division of Inspection and Regional Support (DIRS) decision regarding FAQ 71.0 (Duane Arnold unplanned scram). The Director ruled that after weighing the arguments presented by staff and industry on November 14, 2007, that the scram on March 18, 2007, should count towards the indicator (see appeal decision wording in , FAQ Log).

The status of the open draft FAQs are as follows:

TempNo. PI Topic Status Plant/ Co.

70.0 MSPI Blown Fuse on Diesel Final Decision Ft. Calhoun 71.0 1E01 Chemistry Excursion Appeal Decision - Final Duane Arnold 71.1 1E03 Environmental Condition Final Decision FitzPatrick Downpower 72.0 EP03 Siren Activation Final Decision D.C. Cook 74.0 MSPI PRA Model Revision Final Decision La Salle 75.0 IE01 Manual Shutdown to Repair Valve Introduced Perry 75.1 IE01/IE03 Power Runback due to Recirc Pump Introduced Perry Motor Fault and Subsequent Manual Shutdown 75.2 IE03 Appx 5% Unplanned Power Change Introduced Perry during Shutdown to Repair Valve The NRC staff and industry reached final agreement on FAQs 70.0, 71.1, 72.0, and 74.0. FAQ 75.0, 75.1, and 75.2 were all introduced and are all associated with events at the Perry plant.

J. Andersen The date for the next meeting of the ROP Working Group is January 16, 2008.

Enclosures:

1. Attendance List - November 14, 2007
2. Agenda - November 14, 2007
3. Attendance List - December 5, 2007
4. Agenda - December 5, 2007
5. NEI Presentation from November 14, 2007
6. Licensee Presentation from November 14, 2007
7. NRC Staff Presentation from November 14, 2007
8. Operating Experience Smart Sample Web Page Information
9. NRC Staff Safety Culture Lessons Learned
10. FAQ Log, dated 12/07

J. Andersen The date for the next meeting of the ROP Working Group is January 16, 2008.

Enclosures:

1. Attendance List - November 14, 2007
2. Agenda - November 14, 2007
3. Attendance List - December 5, 2007
4. Agenda - December 5, 2007
5. NEI Presentation from November 14, 2007
6. Licensee Presentation from November 14, 2007
7. NRC Staff Presentation from November 14, 2007
8. Operating Experience Smart Sample Web Page Information
9. NRC Staff Safety Culture Lessons Learned
10. FAQ Log, dated 12/07 Accession Number: Package - ML080070543; Memo - ML080070527; Enclosures - ML080080534 OFFICE NRR/DIRS/IPAB NRR/DIRS/IPAB NAME JThompson JAndersen DATE 01/10/08 01/10/08 OFFICIAL RECORD COPY DISTRIBUTION:

PUBLIC DRoberts ABoland AVegel AHowell GShear CCasto CPederson DLew DChamberlain HChristensen ISchoenfeld JShea JClifford KKennedy SWest MGamberoni RCaniano DDube IPAB PAppignani IRIB

ATTENDANCE LIST DUANE ARNOLD APPEAL ROP PUBLIC MEETING November 14, 2007 NAME AFFILIATION 1 John Butler NEI 2 Julie Keys NEI 3 Jim Andersen NRC 4 Jim Peschel FPL 5 Bob Murrell FPL 6 Don Hickman NRC 7 Fred Brown NRC Enclosure 1 1 of 1

APPEAL MEETING AGENDA FOR FREQUENTLY ASKED QUESTION 71.0, CHEMICAL EXCURSION FOLLOWED BY A PLANT SHUTDOWN FOR THE DUANE ARNOLD STATION November 14, 2007 2:00 - 3:30 p.m.

2:00 - 2:05 p.m. Introductions and Explanation of FAQ Appeal Process (Appendix E to NEI 99-02) 2:05 - 2:30 p.m. Overview of FAQ 71.0, Duane Arnold Licensee Discussion 2:30 - 2:55 p.m. NRC Staff Discussion 2:55 - 3:15 p.m. Questions and Clarifications 3:15 - 3:25 p.m. Public Comments 3:25 - 3:30 p.m. Final Comments 3:30 p.m. Adjourn Enclosure 2 1 of 1

ATTENDANCE LIST INDUSTRY/STAFF ROP PUBLIC MEETING December 5, 2007 NAME AFFILIATION 1 John Butler NEI 2 Julie Keys NEI 3 Lenny Sueper NMC 4 Al Haeger Exelon 5 Duane Kanitz STARS 6 Don Olson Dominion 7 Robin Ritzman FENOC 8 Fred Mashburn TVA 9 Kay Nicholson Duke 10 Tim Kolb NRC 11 Bryan Ford Entergy 12 Steven Vaughn NRC 13 Isabelle Schoenfeld NRC 14 George Lapinsky NRC 15 Jim Peschel FPL 16 Bob Murrell FPL 17 Mark King NRC 18 Donna Wright NRC 19 Eva Brown NRC 20 Dave Allsopp NRC 21 Carlos Sisco Winston and Strawn 22 James Andersen NRC 23 John Thompson NRC 24 Jenny Weil McGraw Hill 25 Bob Gramm NRC 26 Glen Masters INPO 27 Ken Heffner PGN 28 Dave Midlik Southern Nuclear 29 Patrick Baranowsky ERIN 30 Don Dube NRC Enclosure 3 1 of 1

ROP WORKING GROUP PUBLIC MEETING AGENDA December 5, 2007 9:00 a.m. - 4:00 p.m.

Commissions Hearing Room Bridge: 1-800-638-8081, Passcode 8891#

9:00 - 9:05 a.m. Introduction and Purpose of Meeting 9:05 - 09:20 a.m. Discussion of Performance Assessment Branch Topics

1. Safety Culture (task force status)
2. Double-counting in the Action Matrix
3. Revision to IMC 0305
4. Other Reactor Inspection Branch Topics (topics continued from last 09:20 - 10:30 a.m.

meeting)

$ Regulatory Issue Summary (RIS) 2007-21 (update)

$ Significant Determination Process (SDP) appeal process (status)

$ ROP Realignment (status)

$ SDP changes in the Public Radiation Cornerstone (status) 10:30 - 10:45 a.m. Public Input Discussion of Performance Indicator Topics 10:45 - 12:00 p.m.

$ MSPI Unavailability Reviews

$ NEI 99-02 potential guidance changes

$ Other 12:00 - 1:00 p.m. Lunch 1:00 - 2:30 p.m. Discussion of Open and New PI Frequently Asked Questions (FAQs)

The latest draft FAQs are located on the public web at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/draft_faqs.pdf This list is subject to change the day before the meeting based on availability of new draft FAQs provided by the Nuclear Energy Institute (NEI) 2:30 - 2:45 p.m. Public Input 2:45 - 3:15 p.m. Continuation Discussion of Open and New PI FAQs Maintenance Rule 3:15 - 3:35 p.m.

1. Maintenance Rule (status) 3:35 - 3:45 p.m. Future Meeting Dates, ROP Working Group Action List Status and Future Topics Public Input 3:45 - 4:00 p.m.

Meeting To Adjourn Following Public Input Enclosure 4 Page 1 of 1