IR 05000324/2017404

From kanterella
Revision as of 03:17, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
U.S. NRC Security Inspection Report 05000325/2017404 and 05000324/2017404
ML17137A283
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/17/2017
From: James Shehee
Division of Reactor Safety II
To: Stephanie West
Progress Energy Carolinas
References
IR 2017404
Download: ML17137A283 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 17, 2017 Mr. Scott West Manager - Security Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461 SUBJECT: BRUNSWICK STEAM ELECTRIC PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000325/2017404 AND 05000324/2017404

Dear Mr. West:

On April 27, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Brunswick Steam Electric Plant, Units 1 and 2, and discussed the results of this inspection with Mr. R. Gideon and other members of your staff. The results of this inspection are documented in the enclosed report.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements; this violation was determined to be green under the Physical Protection Significance Determination Process. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violations or the significance of these violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region II; the Director, Office of Enforcement, and the NRC resident inspector at the Brunswick Steam Electric Plant.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region II; and the NRC resident inspector at the Brunswick Steam Electric Plant.

This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for withholding.

However, the material enclosed herein contains Security-Related information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA Otis Smith FOR/

James C. Shehee, Acting Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-325 and 50-324 License Nos. DPR-71 and DPR-62 Enclosure:

IR 05000325/2017404 and 05000324/2017404 w/Attachment: Supplementary Info (OUO)

cc: (See page 3) cc:

Mr. Lee Grzeck Manager - Regulatory Affairs Brunswick Steam Electric Plant P.O. Box 10429 Southport, NC 28461-0429

`

Mr. Edward T. ONeil General Manager, Nuclear Protective Services Duke Energy Corporation 526 South Church Street Charlotte, NC 28202 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRS/PSB2 RII:DRP SIGNATURE JPT via email JOB via email OXS for SDR NAME J. Tornow J. Brown J. Shehee S. Rose DATE 5/ 12/ /2017 5/ 12 /2017 5/ ./2017 5/ /017 E-MAIL COPY YES NO YES NO YES NO YES NO