IR 05000324/2021401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000324/2021401 and 05000325/2021401
ML21271A343
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/28/2021
From: Jannette Worosilo
NRC/RGN-II/DRS/PSB2
To: Krakuszeski J
Duke Energy Progress
References
IR 2021401
Download: ML21271A343 (9)


Text

September 28, 2021

SUBJECT:

BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000324/2021401 AND 05000325/2021401

Dear Mr. Krakuszeski:

On September 16, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000324 and 05000325

License Numbers:

DPR-62 and DPR-71

Report Numbers:

05000324/2021401 and 05000325/2021401

Enterprise Identifier: I-2021-401-0039

Licensee:

Duke Energy Progress, LLC

Facility:

Brunswick Steam Electric Plant, Units 1 and 2

Location:

Southport, NC

Inspection Dates:

September 13, 2021 to September 16, 2021

Inspectors:

J. Brown, Senior Physical Security Inspector

R. Patterson, Physical Security Inspector

J. Wallo, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Brunswick Steam Electric Plant,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1)

  • Tier I: All Requirements
  • Tier II: (02.05 a-c, 02.06, 02.07 a-h)
  • Tier III: (02.08)

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program through completion of the following elements:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: (02.09 a, b, 02.11 a-c, 02.12 a, 02.13 a)
  • Tier III: (02.14, 02.15 a-c)

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

===procedure elements:

Security Training===

(1)

  • Tier I: All Requirements
  • Tier II: (02.05 a, - d, 02.06 a -b)
  • Tier III: (02.012 a - b, 02.13 a-c)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) Since the last NRC inspection of this program area, Security Plan Revision 15 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2),that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) Unit 1 (August 2020 through August 2021)

Unit 2 (August 2020 through August 2021)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On September 16, 2021, the inspectors presented the security baseline inspection results to Mr. Sam Santaniello and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

297862

2319416

2322325

Procedures

AD-SY-ALL-0210

Site Access Controls

Revision 6

AD-SY-ALL-0215

Security Search and Entry Processing

Revision 6

AD-SY-BNP-0205 SOCA/EWAS Operations and Additional Measures

Revision 1

71130.04

Corrective Action

Documents

298987

2306691

2310718

2319830

2350296

2365219

2369711

2370037

Procedures

AD-SY-ALL-0580

Weapons Maintenance, Testing, and Accountability

Revision 6

AD-SY-ALL-0610

Nuclear Security Equipment Maintenance Program

Revision 0

AD-SY-ALL-0620

Testing and Inspection of Perimeter Intrusion Detection

Systems (PIDS)

Revision 0

AD-SY-ALL-0625

Security Owner Controlled Area (SOCA) Surveillance

Systems Maintenance and Testing

Revision 2

AD-SY-ALL-0630

Testing and Maintenance of Security Communications

Equipment

Revision 2

AD-SY-ALL-0640

Testing and Inspection of Security Search Equipment

Revision 0

AD-SY-ALL-0650

Physical Barrier Access Control System Testing and

Inspection

Revision 0

AD-SY-BNP-0600 Testing and Inspection of (BNP) Security Equipment and

Barriers

Revision 1

Self-Assessments 2021-BNP-SEC-

Nuclear Oversight-Audit Brunswick Physical Security

February 25,

21

71130.07

Corrective Action

Documents

299013

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Procedures

AD-SY-ALL-0510

Security Program Systematic Approach to Training

Revision 5

AD-SY-ALL-0520

Security Training

Revision 6

AD-SY-ALL-0524

Security On-The-Job Training (OJT) and Task Performance

Evaluation (TPE)

Revision 1

71130.09

Procedures

Physical Security

Plan (PSP)

Revision 15

71151

Procedures

AD-PI-ALL-0700

Performance Indicators

Revision 4