IR 05000324/2017302
ML17354B215 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 12/12/2017 |
From: | Eugene Guthrie Division of Reactor Safety II |
To: | Hicks J Duke Energy Progress |
References | |
IR 2017302 | |
Download: ML17354B215 (2) | |
Similar Documents at Brunswick | |
---|---|
Category:Letter
MONTHYEARIR 05000324/20230112023-12-26026 December 2023
[Table view]NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) ML22230D0692022-08-22022 August 2022 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220102022-06-27027 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 ML22119A1352022-05-0909 May 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000325/2022403; 05000324/2022403 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22102A0502022-04-11011 April 2022 301 Corporate Notification Letter IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 ML22035A1262022-02-0909 February 2022 Withdrawal of Exemption Request from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.d (EPID L-2021-LLE-0055 (COVID-19)) ML21354A5032022-01-24024 January 2022 Requested Exemption from 10 CFR 50, Appendix E, Section IV.F.2.D Not Required (EPID L-2021-LLE-0055 (COVID-19)) ML22018A1842022-01-18018 January 2022 Notification of Brunswick Steam Electric Plant, Units 1 & 2 - Design Bases Assurance Inspection - U.S. Nuclear Regulatory Inspection Report 05000324/2022010 and 05000325/2022010 ML21348A7192021-12-21021 December 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times 2023-09-25 Category:License-Operator MONTHYEARML23065A0702023-03-0606 March 2023
[Table view]Bru 2022301 2B Exam Administrative Items IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21034A6212021-02-0303 February 2021 301 2B (Normal Release) Exam Administrative Items ML21034A6222021-02-0303 February 2021 301 2A Exam Administrative Items (2 Year Delayed Release) ML21034A6252021-02-0303 February 2021 301 2A Exam Final Items (2 Year Delayed Release) ML21015A0162021-01-15015 January 2021 301 1A Final RO Written Exam (2-Year Delayed Release) ML21015A0202021-01-15015 January 2021 301 1A Final SRO Written Exam (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20339A4052020-11-30030 November 2020 Operator Licensing Examination Approval 05000325/2020301 and 05000324/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2282019-04-25025 April 2019 Exam 2019-301, Exam Administrative Items (Normal Release) ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML19004A3402019-01-0303 January 2019 Operator Licensing Examination Approval 05000325/2019301 and 05000324/2019301 ML18239A4532018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2D)- Delay Release 2 Yrs ML18239A4522018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML18239A4482018-08-27027 August 2018 302 Exam Final Items (ADAMS-2B)- Delay Release 2 Yrs ML18239A4462018-08-27027 August 2018 302 Examination Draft Items (ADAMS-2A)- Delay Release 2 Yrs RA-18-0049, Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-3012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 IR 05000324/20183012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 ML18110A3212018-04-16016 April 2018 March 2018 - Brunswick NRC Generic Fundamentals Examination Results ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination IR 05000324/20173022017-12-12012 December 2017 (Retake) Operator Licensing Examination Approval 05000325/2017302 and 05000324/2017302 ML17298B1732017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Administrative Items ML17298B1312017-10-25025 October 2017 05000325/2017-301 and 05000324/2017-301 Exam Draft Items ML17298B1612017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Final Items ML17263A6222017-09-20020 September 2017 Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments 05000325/2017301 and 05000324/2017301 Post Exam Comments ML17263A6012017-09-20020 September 2017 Final RO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17263A6042017-08-0808 August 2017 Final SRO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17201B5072017-07-18018 July 2017 Operator Licensing Written Examination Approval 050003252017301 and 050003242017301 ML17181A3862017-06-30030 June 2017 Exam Draft Items 2A - Delay Release ML17181A3952017-06-30030 June 2017 Exam Final Items 2B - Delay Release ML17181A4012017-06-30030 June 2017 Exam Administrative Items 2C - Delay Release ML17181A3342017-06-30030 June 2017 Brunswick 2015301 ADAMS 2D - Exam Admin Items ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17012A3042017-01-27027 January 2017 Final RO Written Exam - Delay Release 2 Yrs ML17017A3852017-01-27027 January 2017 Final SRO Written Exam - Delay Release 2 Years ML17017A3892017-01-27027 January 2017 Post-Exam Comment - Delay Release 2 Yrs ML16334A5322016-11-21021 November 2016 Operator Licensing Written Examination Approval 05000325/2016301 and 05000324/2016301 ML16007A2122016-01-0707 January 2016 Initial Exam 2015-301 Post Exam Comments BSEP 15-0105, Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments2015-12-21021 December 2015 Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments BSEP 15-0018, Updated Information Regarding Operator Licensing Examinations2015-03-0505 March 2015 Updated Information Regarding Operator Licensing Examinations ML14350A1732014-12-16016 December 2014 Initial Exam 2014-301 Final Administrative JPMs ML14350A1682014-12-16016 December 2014 Initial Exam 2014-301 Final Simulator In-Plant JPMs ML14350A1612014-12-16016 December 2014 Initial Exam 2014-301 Final Simulator Scenarios ML14350A1582014-12-16016 December 2014 Initial Exam 2014-301 Final Administrative Documents ML14350A1552014-12-16016 December 2014 Initial Exam 2014-301 Draft Administrative JPMs 2023-03-06 Category:Part 55 Examination Related Material MONTHYEARML23065A0702023-03-0606 March 2023
[Table view]Bru 2022301 2B Exam Administrative Items IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21034A6222021-02-0303 February 2021 301 2A Exam Administrative Items (2 Year Delayed Release) ML21034A6252021-02-0303 February 2021 301 2A Exam Final Items (2 Year Delayed Release) ML21034A6212021-02-0303 February 2021 301 2B (Normal Release) Exam Administrative Items ML21015A0202021-01-15015 January 2021 301 1A Final SRO Written Exam (2-Year Delayed Release) ML21015A0162021-01-15015 January 2021 301 1A Final RO Written Exam (2-Year Delayed Release) ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20339A4052020-11-30030 November 2020 Operator Licensing Examination Approval 05000325/2020301 and 05000324/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations RA-19-0237, Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Catawba Station, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19115A2282019-04-25025 April 2019 Exam 2019-301, Exam Administrative Items (Normal Release) ML19004A3402019-01-0303 January 2019 Operator Licensing Examination Approval 05000325/2019301 and 05000324/2019301 ML18239A4462018-08-27027 August 2018 302 Examination Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML18239A4522018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2C)- Delay Release 2 Yrs ML18239A4532018-08-27027 August 2018 302 Exam Administrative Items (ADAMS-2D)- Delay Release 2 Yrs ML18239A4482018-08-27027 August 2018 302 Exam Final Items (ADAMS-2B)- Delay Release 2 Yrs RA-18-0049, Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-3012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 IR 05000324/20183012018-06-25025 June 2018 Operating Test Outline, Written Examination Outline, and Reference Materials for Licensed Operator Initial Examination 50-325/2018-301 and 50-324/2018-301 ML18110A3212018-04-16016 April 2018 March 2018 - Brunswick NRC Generic Fundamentals Examination Results BSEP 17-0121, Post-Examination Documentation and Comments for Operator Retake Initial Examination2017-12-14014 December 2017 Post-Examination Documentation and Comments for Operator Retake Initial Examination IR 05000324/20173022017-12-12012 December 2017 (Retake) Operator Licensing Examination Approval 05000325/2017302 and 05000324/2017302 ML17298B1312017-10-25025 October 2017 05000325/2017-301 and 05000324/2017-301 Exam Draft Items ML17298B1732017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Administrative Items ML17298B1612017-10-25025 October 2017 05000325/2017-301 and 324/2017-301 Exam Final Items ML17263A6222017-09-20020 September 2017 Reactor Operator and Senior Reactor Operator License Post-Examination Documentation and Comments 05000325/2017301 and 05000324/2017301 Post Exam Comments ML17263A6012017-09-20020 September 2017 Final RO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17263A6042017-08-0808 August 2017 Final SRO Written as Given and Answer Sheet - Delay Release 2 Yrs ML17201B5072017-07-18018 July 2017 Operator Licensing Written Examination Approval 050003252017301 and 050003242017301 ML17181A4012017-06-30030 June 2017 Exam Administrative Items 2C - Delay Release ML17181A3952017-06-30030 June 2017 Exam Final Items 2B - Delay Release ML17181A3862017-06-30030 June 2017 Exam Draft Items 2A - Delay Release ML17181A3342017-06-30030 June 2017 Brunswick 2015301 ADAMS 2D - Exam Admin Items ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML17012A3042017-01-27027 January 2017 Final RO Written Exam - Delay Release 2 Yrs ML17017A3852017-01-27027 January 2017 Final SRO Written Exam - Delay Release 2 Years ML17017A3892017-01-27027 January 2017 Post-Exam Comment - Delay Release 2 Yrs ML16334A5322016-11-21021 November 2016 Operator Licensing Written Examination Approval 05000325/2016301 and 05000324/2016301 ML16007A2122016-01-0707 January 2016 Initial Exam 2015-301 Post Exam Comments BSEP 15-0018, Updated Information Regarding Operator Licensing Examinations2015-03-0505 March 2015 Updated Information Regarding Operator Licensing Examinations ML14350A1612014-12-16016 December 2014 Initial Exam 2014-301 Final Simulator Scenarios ML14350A1732014-12-16016 December 2014 Initial Exam 2014-301 Final Administrative JPMs ML14350A1682014-12-16016 December 2014 Initial Exam 2014-301 Final Simulator In-Plant JPMs ML14350A1582014-12-16016 December 2014 Initial Exam 2014-301 Final Administrative Documents ML14350A1552014-12-16016 December 2014 Initial Exam 2014-301 Draft Administrative JPMs ML14350A1372014-12-16016 December 2014 Initial Exam 2014-301 Draft Simulator In-plant JPMs ML14350A1342014-12-16016 December 2014 Initial Exam 2014-301 Draft Simulator Scenarios ML14350A1312014-12-16016 December 2014 Initial Exam 2014-301 Draft SRO Written Exam ML14350A1252014-12-16016 December 2014 Initial Exam 2014-301 Draft RO Written Exam ML14350A1242014-12-11011 December 2014 Initial Exam 2014-301 Draft Administrative Documents 2023-03-06 |
Inspection Report - Brunswick - 2017302 (Operator Exams) | |
---|---|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ber 12, 2017
SUBJECT:
BRUNSWICK NUCLEAR POWER PLANT - (RETAKE) OPERATOR LICENSING EXAMINATION APPROVAL 05000325/2017302 AND 05000324/2017302
Dear Mr. Hicks:
The purpose of this letter is to confirm the final arrangements for the upcoming retake operator licensing examination at the Brunswick Nuclear Power Plant.
The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examination. The NRC staff will administer the operating test during the week of December 11, 2017. The list of the applicants approved to take the examination has been provided to Mr. Mark Similey, Operations Training Manager. The examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of Revision 11 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 404-997-4662.
Please contact your Chief Examiner, Daniel Bacon, at 404-997-4518, if you have questions or identify any errors or changes in the license level (reactor operator or senior reactor operator) or type of examination (partial or complete written examination or operating test, or both) specified for each applicant approved to take the examination.
Sincerely,
/RA/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS SIGNATURE JCV DXB2 EFG NAME JVINCENT DBACON EGUTHRIE DATE 12/12/2017 12/12 /2017 12/12/2017 E-MAIL COPY? YES NO YES NO YES NO