IR 05000324/2024401
| ML24289A046 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 10/15/2024 |
| From: | Jannette Worosilo Division of Reactor Safety II |
| To: | Santaniello S Duke Energy Progress |
| References | |
| IR 2024401 | |
| Download: ML24289A046 (7) | |
Text
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1&2 - SECURITY BASELINE INSPECTION REPORT 05000324/2024401 AND 05000325/2024401
Dear Sam Santaniello:
On October 10, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Brunswick Steam Electric Plant, Units 1&2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000324 and 05000325 License Nos. DPR-62 and DPR-71
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000324 and 05000325
License Numbers:
Report Numbers:
05000324/2024401 and 05000325/2024401
Enterprise Identifier:
I-2024-401-0058
Licensee:
Duke Energy Progress, LLC
Facility:
Brunswick Steam Electric Plant, Units 1&2
Location:
Southport, NC
Inspection Dates:
October 07, 2024 to October 10, 2024
Inspectors:
J. Justice, Senior Physical Security Inspector
Approved By:
Jannette G. Worosilo, Chief
Nuclear Security Branch
Division of Fuels, Radiological Safety, and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Brunswick Steam Electric Plant,
Units 1&2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
inspection elements: Access Control
(1)
- Tier I: All Requirements
- Tier II: 02.06(b,c), 02.07(a), 02.08 (a,b,e,f,g,h)
- Tier III: 02.09
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
procedure elements: Security Plan Changes
- (1) Since the last NRC baseline inspection of this program area, Security Plan Revision 16 was implemented based on Brunswick Nuclear Plant's evaluation, and in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspector conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those changes. Therefore, the changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)
- (1) October 2023 - September
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 10, 2024, the inspectors presented the security baseline inspection results to Sam Santaniello and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
2515838
2520466
Procedures
0AOP-40.0
Security Events
Rev. 37
Procedures
AD-SY-ALL-0110
Protection of Information Related to Nuclear Security
Rev. 10
Procedures
AD-SY-ALL-0210
Site Access Controls
Rev 9
Procedures
AD-SY-ALL-0215
Security Search and Entry Processing
Rev. 14
Procedures
AD-SY-ALL-0240
Security Key and Lock Control
Rev. 3
Procedures
AD-SY-BNP-0205
SOCA/EWAS Operations and Additional Measures
Rev. 2
Procedures
AD-SY-BNP-0260
Security Compensatory Measures
Rev. 3
Procedures
CSD-SY-BNP-
215-01
(BNP) Security Search and Entry Processing
Rev. 12
Self-Assessments 02488963
24 USNRC Baseline Readiness Assessment - BNP
Security
08/15/2024
Self-Assessments 2024-BNP-SEC-
PR-01
Nuclear Oversight - Performance Review Brunswick Physical
Security
2/26/2024
Procedures
Brunswick Steam Electric Plant Physical Security Plan
Rev. 16
71151
Procedures
AD-PI-ALL-0700
Performance Indicators
Rev. 6
71151
Procedures
AD-SY-ALL-0150
Reporting Safeguards, Security, and Fitness for Duty Events
Rev. 8