Updated Inspection Plan NRC Inspection Report 05000325/2017005 and 05000324/2017005
ML17240A207
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/28/2017
From: Steven Rose
NRC/RGN-II/DRP/RPB4
To: William Gideon
Progress Energy Carolinas
References
Download: ML17240A207 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ust 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000325/2017005 AND 05000324/2017005

Dear Mr. Gideon:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for the Brunswick Steam Electric Plant, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4609 with any questions you have regarding this letter.

Sincerely,

/RA/

Steven D. Rose, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62 Enclosure:

Brunswick Inspection/Activity Plan (09/01/2016 - 06/30/2019)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000325/2017005 AND 05000324/2017005 August 28, 2017 DISTRIBUTION:

M. Kowal, RII S. Price, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)

ADAMS Accession No. ML17240A207 OFFICE RII:DRP RII:DRP RII: DRP NAME DJackson JDodson SRose DATE 8/15/2017 8/15/2017 8/28/2017 OFFICIAL AGENCY RECORD

Page 1 of 2 Brunswick 08/23/2017 14:06:47 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site MODS - PLANT MODIFICATIONS INSPECTION 2 1, 2 10/16/2017 10/20/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments TI-191 - MITIGATING STRATEGIES 3 1, 2 01/29/2018 02/02/2018 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 RP - RAD HAZARDS AND TRANSPORTATION 2 1, 2 03/05/2018 03/09/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/05/2018 03/09/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 03/12/2018 03/16/2018 IP 7111108G Inservice Inspection Activities - BWR EQI - DESIGN BASES ASSURANCE INSPECTION (PROGR 3 1, 2 04/02/2018 04/06/2018 IP 7111121N Design Bases Assurance Inspection (Programs)

1, 2 04/23/2018 04/27/2018 IP 7111121N Design Bases Assurance Inspection (Programs)

1, 2 05/07/2018 05/11/2018 IP 7111121N Design Bases Assurance Inspection (Programs)

RP - RP PUBLIC INSPECTION 2 1, 2 06/04/2018 06/08/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/04/2018 06/08/2018 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 06/04/2018 06/08/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 06/04/2018 06/08/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 07/09/2018 07/13/2018 IP 7111107T Heat Sink Performance EP - EP EXERCISE 8 1, 2 07/30/2018 08/03/2018 IP 7111401 Exercise Evaluation 1, 2 07/30/2018 08/03/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 07/30/2018 08/03/2018 IP 71151-EP01 Drill/Exercise Performance 1, 2 07/30/2018 08/03/2018 IP 71151-EP02 ERO Readiness 1, 2 07/30/2018 08/03/2018 IP 71151-EP03 Alert & Notification System Reliability OL EXAM - INITIAL LICENSE EXAM PREP 3 1 10/29/2018 11/02/2018 V23519 BRUNSWICK / NOVEMBER 2018 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL LICENSE EXAM 3 1 11/26/2018 12/07/2018 V23519 BRUNSWICK / NOVEMBER 2018 INITIAL EXAM AT POWER FACILITIES PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 02/04/2019 02/08/2019 IP 71152B Problem Identification and Resolution 1, 2 02/18/2019 02/22/2019 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Brunswick 08/23/2017 14:06:47 Inspection / Activity Plan Report 22 09/01/2017 - 06/30/2019 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 03/11/2019 03/15/2019 IP 7111108G Inservice Inspection Activities - BWR RP - RP OCCUPATIONAL WEEK 1 2 1, 2 03/11/2019 03/15/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/11/2019 03/15/2019 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 03/11/2019 03/15/2019 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/11/2019 03/15/2019 IP 71124.04 Occupational Dose Assessment 1, 2 03/11/2019 03/15/2019 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 03/11/2019 03/15/2019 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 03/11/2019 03/15/2019 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences RP - RP OCCUPATIONAL WEEK 2 3 1, 2 04/08/2019 04/12/2019 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 04/08/2019 04/12/2019 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 04/08/2019 04/12/2019 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/08/2019 04/12/2019 IP 71124.04 Occupational Dose Assessment 1, 2 04/08/2019 04/12/2019 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 04/08/2019 04/12/2019 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 04/08/2019 04/12/2019 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.