August 28, 2017

SUBJECT:

UPDATED INSPECTION PLAN FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000325/2017005 AND 05000324/2017005

Dear Mr. Gideon:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for the Brunswick Steam Electric Plant, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4609 with any questions you have regarding this letter.

Sincerely,

/RA/

Steven D. Rose, Chief

Reactor Projects Branch 4

Division of Reactor Projects

Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62

Enclosure:

Brunswick Inspection/Activity Plan (09/01/2016 - 06/30/2019)

cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000325/2017005 AND 05000324/2017005 August 28, 2017

DISTRIBUTION:

M. Kowal, RII S. Price, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)

ADAMS Accession No. ML OFFICE RII:DRP RII:DRP RII: DRP

NAME DJackson JDodson SRose

DATE 8/15/2017 8/15/2017 8/28/2017

OFFICIAL AGENCY RECORD 17240A207

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Brunswick Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 1 of 2 08/23/2017 14:06:47 MODS

- PLANT MODIFICATIONS INSPECTION

1, 2 IP Evaluations of Changes, Tests, and Experiments 7111117T 10/16/2017 10/20/2017 TI-191

- MITIGATING STRATEGIES

1, 2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 01/29/2018 02/02/2018 RP

- RAD HAZARDS AND TRANSPORTATION

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/05/2018 03/09/2018 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 03/05/2018 03/09/2018 ISI

- UNIT 1 IN-SERVICE INSPECTION

1 IP Inservice Inspection Activities - BWR 7111108G 03/12/2018 03/16/2018 EQI

- DESIGN BASES ASSURANCE INSPECTION (PROGR

1, 2 IP Design Bases Assurance Inspection (Programs)

7111121N 04/02/2018 04/06/2018 1, 2 IP Design Bases Assurance Inspection (Programs)

7111121N 04/23/2018 04/27/2018 1, 2 IP Design Bases Assurance Inspection (Programs)

7111121N 05/07/2018 05/11/2018 RP

- RP PUBLIC INSPECTION

1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/04/2018 06/08/2018 1, 2 IP Radiological Environmental Monitoring Program 71124.07 06/04/2018 06/08/2018 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 06/04/2018 06/08/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 06/04/2018 06/08/2018 HS

- TRIENNIAL HEAT SINK PERFORMANCE

1, 2 IP Heat Sink Performance 7111107T 07/09/2018 07/13/2018 EP

- EP EXERCISE

1, 2 IP Exercise Evaluation 7111401 07/30/2018 08/03/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 07/30/2018 08/03/2018 1, 2 IP Drill/Exercise Performance 71151-EP01 07/30/2018 08/03/2018 1, 2 IP ERO Readiness 71151-EP02 07/30/2018 08/03/2018 1, 2 IP Alert & Notification System Reliability 71151-EP03 07/30/2018 08/03/2018 OL EXAM

- INITIAL LICENSE EXAM PREP

1 BRUNSWICK / NOVEMBER 2018 INITIAL EXAM AT POWER FACILITIES V23519 10/29/2018 11/02/2018 OL EXAM

- INITIAL LICENSE EXAM

1 BRUNSWICK / NOVEMBER 2018 INITIAL EXAM AT POWER FACILITIES V23519 11/26/2018 12/07/2018 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION

1, 2 IP Problem Identification and Resolution 71152B 02/04/2019 02/08/2019 1, 2 IP Problem Identification and Resolution 71152B 02/18/2019 02/22/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Brunswick Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 2 of 2 08/23/2017 14:06:47 ISI

- UNIT 2 IN-SERVICE INSPECTION

2 IP Inservice Inspection Activities - BWR 7111108G 03/11/2019 03/15/2019 RP

- RP OCCUPATIONAL WEEK 1

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/11/2019 03/15/2019 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/11/2019 03/15/2019 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/11/2019 03/15/2019 1, 2 IP Occupational Dose Assessment 71124.04 03/11/2019 03/15/2019 1, 2 IP Radiation Monitoring Instrumentation 71124.05 03/11/2019 03/15/2019 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 03/11/2019 03/15/2019 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 03/11/2019 03/15/2019 RP

- RP OCCUPATIONAL WEEK 2

1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/08/2019 04/12/2019 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/08/2019 04/12/2019 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/08/2019 04/12/2019 1, 2 IP Occupational Dose Assessment 71124.04 04/08/2019 04/12/2019 1, 2 IP Radiation Monitoring Instrumentation 71124.05 04/08/2019 04/12/2019 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 04/08/2019 04/12/2019 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 04/08/2019 04/12/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.