| Q | CCA | Title |
---|
05000324/FIN-2016003-01 | 2016Q3 | H.8 | Failure to Implement Risk Management Actions during Elevated Risk |
05000324/FIN-2016003-02 | 2016Q3 | H.5 | Inadequate Procedure to Perform Preventive Maintenance on the HPCI Auxiliary Oil Pump Motor Overload Relay |
05000324/FIN-2016003-03 | 2016Q3 | H.11 | Inadequate Procedure for the 2B RHRSW Subsystem Operability Test |
05000324/FIN-2016003-06 | 2016Q3 | | Tornado Missile Vulnerability Results in Condition Prohibited by Technical Specifications |
05000324/FIN-2016004-01 | 2016Q4 | | Failure to Submit a Licensee Event Report for a Condition Prohibited by Technical Specification |
05000324/FIN-2017007-01 | 2017Q1 | P.2 | Failure to Correct a Nonfunctional Fire Door |
05000324/FIN-2017001-01 | 2017Q1 | H.2 | Nonfunctional Sprinklers in the Service Water Building Without Compensatory Measures |
05000324/FIN-2017001-02 | 2017Q1 | H.4 | Failure to Control a Temporary Fire Ignition Source Near the Unit 2 Standby Liquid Control Pump Motor and Cables |
05000324/FIN-2017001-03 | 2017Q1 | H.6 | Failure to Install Flood Barrier Seals Around the EDG 2 Four -Day Fuel Oil Tank Vents |
05000324/FIN-2017001-04 | 2017Q1 | P.3 | Failure to Enter the Technical Specification for an Inoperable 1D Control Room Air Conditioning Unit |
05000325/FIN-2017009-01 | 2017Q2 | | Inoperability of EDG1 due to Cyclic Fatigue Failure of Hydraulic Fuel Rack Control |
05000324/FIN-2017404-01 | 2017Q2 | | Security |
05000324/FIN-2017002-01 | 2017Q2 | | Implementation of EGM 11- 003, Revision 3, Enforcement Guidance Memorandum on Dispositioning Boiling Water Reactor Licensee Noncompliance with Technical Specification Containment Requirements During Operations with a Potential for Draining the Reactor Vessel |