IR 05000324/2017006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 - NRC Inspection Reports 05000325/2017006 and 05000324/2017006, 05000325/2017402 and 05000324/2017402, 05000325/2017501 and 05000324/2017501
ML18059A220
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/28/2018
From: Steven Rose
NRC/RGN-II
To: William Gideon
Duke Energy Progress
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18059A220 (6)


Text

UNITED STATES uary 28, 2018

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORTS 05000325/2017006 AND 05000324/2017006, 05000325/2017402 AND 05000324/2017402, 05000325/2017501 AND 05000324/2017501

Dear Mr. Gideon:

The NRC has completed its end-of-cycle performance assessment of Brunswick Steam Electric Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017, through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Brunswick Steam Electric Plant, Units 1 and 2 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 404-997-4609 with any questions you have regarding this letter.

Sincerely,

/RA/

Steven D. Rose, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62 Enclosure:

Brunswick Inspection/Activity Plan cc Distribution via ListServ SUBJECT: ANNUAL ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000325/2017006 AND 05000324/2017006, 05000325/2017402 AND 05000324/2017402, 05000325/2017501 AND 05000324/2017501 February 28, 2018 DISTRIBUTION:

M. Kowal, RII S. Price, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)

ADAMS Accession No. ML18059A220 OFFICE RII:DRP RII:DRP RII:DRP RII:DRP NAME DJackson JDodson WDeschaine SRose DATE 2/23/2018 2/27/2018 2/27/2018 2/26/2018 OFFICIAL AGENCY RECORD

IP 22 Inspection Activity Plan Report Brunswick 03/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count RAD HAZARDS AND TRANSPORTATION 2 1, 2 03/05/2018 03/09/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/05/2018 03/09/2018 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation UNIT 1 IN-SERVICE INSPECTION 1 1 03/12/2018 03/16/2018 IP 71111.08G 000701 Inservice Inspection Activities - BWR DESIGN BASES ASSURANCE INSPECTION (PROGRAM) 3 1, 2 04/23/2018 04/27/2018 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

1, 2 05/07/2018 05/11/2018 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

RP PUBLIC INSPECTION 2 1, 2 06/04/2018 06/08/2018 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 06/04/2018 06/08/2018 IP 71124.07 000731 Radiological Environmental Monitoring Program 1, 2 06/04/2018 06/08/2018 IP 71151 000746 Performance Indicator Verification FORCE-ON-FORCE PLANNING & EXERCISE WEEKS 7 1, 2 06/25/2018 06/29/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 07/16/2018 07/20/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing TRIENNIAL HEAT SINK PERFORMANCE 1 1, 2 07/09/2018 07/13/2018 IP 71111.07T 000700 Heat Sink Performance -Triennial EP EXERCISE 5 1, 2 07/30/2018 08/03/2018 IP 71114.01 000716 Exercise Evaluation 1, 2 07/30/2018 08/03/2018 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 07/30/2018 08/03/2018 IP 71151 001397 Performance Indicator Verification CYBER SECURITY 2 1, 2 08/06/2018 08/10/2018 IP 71130.10P 000741 Cyber Security 1, 2 08/20/2018 08/24/2018 IP 71130.10P 000741 Cyber Security BRUNSWICK REQUAL INSPECTION 2 1, 2 09/10/2018 09/14/2018 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial This report does not include INPO and OUTAGE activities. Page 1 of 3 This report shows only on-site and announced inspection procedures.

Enclosure

IP 22 Inspection Activity Plan Report BRUNSWICK INITIAL LICENSE EXAM 5 1, 2 10/22/2018 10/26/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 11/26/2018 12/07/2018 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

DUKE CORP AA/FFD/SGI SECURITY INSPECTION 2 1, 2 11/05/2018 11/09/2018 IP 71130.01 000733 Access Authorization 1, 2 11/05/2018 11/09/2018 IP 71130.06 000738 Protection of Safeguards Information 1, 2 11/05/2018 11/09/2018 IP 71130.08 000740 Fitness For Duty Program SECURITY BASELINE INSPECTION 2 1, 2 11/26/2018 11/30/2018 IP 71130.01 000733 Access Authorization 1, 2 11/26/2018 11/30/2018 IP 71130.02 000734 Access Control 1, 2 11/26/2018 11/30/2018 IP 71130.06 000738 Protection of Safeguards Information 1, 2 11/26/2018 11/30/2018 IP 71130.08 000740 Fitness For Duty Program 1, 2 11/26/2018 11/30/2018 IP 71151 001338 Performance Indicator Verification UNIT 2 IN-SERVICE INSPECTION 1 2 03/11/2019 03/15/2019 IP 71111.08G 000701 Inservice Inspection Activities - BWR RP OCCUPATIONAL WEEK 1 2 1, 2 03/11/2019 03/15/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/11/2019 03/15/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 03/11/2019 03/15/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 03/11/2019 03/15/2019 IP 71124.04 000729 Occupational Dose Assessment 1, 2 03/11/2019 03/15/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 03/11/2019 03/15/2019 IP 71151 000746 Performance Indicator Verification RP OCCUPATIONAL WEEK 2 3 1, 2 04/01/2019 04/05/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 04/01/2019 04/05/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 04/01/2019 04/05/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 04/01/2019 04/05/2019 IP 71124.04 000729 Occupational Dose Assessment 1, 2 04/01/2019 04/05/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 04/01/2019 04/05/2019 IP 71151 000746 Performance Indicator Verification SECURITY BASELINE INSPECTION 2 1, 2 04/15/2019 04/19/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 04/15/2019 04/19/2019 IP 71130.07 000739 Security Training PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 05/06/2019 05/10/2019 IP 71152B 000747 Problem Identification and Resolution 1, 2 05/20/2019 05/24/2019 IP 71152B 000747 Problem Identification and Resolution This report does not include INPO and OUTAGE activities. Page 2 of 3 This report shows only on-site and announced inspection procedures.

Enclosure

IP 22 Inspection Activity Plan Report DESIGN BASES ASSURANCE INSPECTION (TEAM) 6 1, 2 07/29/2019 08/02/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1, 2 08/19/2019 08/23/2019 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

SECURITY BASELINE INSPECTION 3 1, 2 10/21/2019 10/25/2019 IP 71130.02 000734 Access Control 1, 2 10/21/2019 10/25/2019 IP 71130.05 000737 Protective Strategy Evaluation This report does not include INPO and OUTAGE activities. Page 3 of 3 This report shows only on-site and announced inspection procedures.

Enclosure