Forwards Page 2 of Encl to 790105 Ltr from Gh Fischer of Sc Electric & Gas to PT Allen of Central Electrical Power Cooperative.Ltr Was Appended to Former'S Response to Latter'S Reply Brief
ML19274E933
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/08/1979
From: Rader R
CONNER, MOORE & CORBER
To: Stephens C
NRC OFFICE OF THE SECRETARY (SECY)
References
NUDOCS 7906050156
Download: ML19274E933 (2)


Text

. . . . ..

-

-

. _

7 ~ , .,

LAW OF7 ICES Coxsta. Moons & ConBER 1747 PENNSYLVANI A AVENU E, N. W.

T aov s. COMM E R. J B. WASIIINGTON. D. C. 20006 ancE A.MoonE,JB?

nonza? J.commum Maa E J. WETTE REAR?t

-

now i.oJ m i..uv. J . May 8, 1979

" , " " ' , * ",^ " " , " raoa>.22 2soo

-.............. g c , m ,o o . . . . . ,o,, m.

/

Mr. Chase Stephens x g ,

-

Docketing and Service Section 3 Office of the Secretary  % $ Ay*~ a#

'

United States Nuclear Regulatory /, j Commission Washington, D. C. 20555 el C)

In the Matter of South Carolina Electric & Gas Company (Virgil C. Sur.er Nuclear Power Plant, Units 1 and 2)

Docket No. 50-395A

Dear Mr. Stephens:

In our recently submitted " Response of South Carolina Electric & Gas Company to the Reply Brief of Central Electric Power Cooperative, Inc. ," we inadvertently omitted page two of the attachment to the letter dated January 5, 1979, from George H. Fischer of SCE&G to P. T. Allen of Central Electric, which was appended to our Response.

Sincerely, Y h Robert M. Rader RMR:dr Attachment cc: All Parties

..

7906 05016b K

-

-

services to CEPCO such as:

1) Dispatch, control and maintenance of unit,
2) Supply supplemental capacity and energy-requirements to the extent possible to firm up CEPCO's load demand requirements to her member cooperatives presently served by SCE&G.

.

3) Provide backup reserve capacity.
4) Wheel CEPCO's load demand requirements to the extent possible, to all their delivery points.
5) Transact the exchange of capacity and energy between CEPCO and SCE&G from generating capacity subject to this arrangement under Rate Schedules filed with and approved by the Federal Energy I

Regulatory Commission.

The transactions outlined hereunder would commence

"

upon the date of commercial operation of the jointly-owned unit.

os

/  %

C$$N C