IR 05000315/2006501
ML062210277 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 08/07/2006 |
From: | Pederson C Division of Reactor Safety II |
To: | Nazar M Indiana Michigan Power Co |
References | |
EA-06-177 IR-06-501 | |
Download: ML062210277 (15) | |
Text
August 7, 2006EA-06-177 Mr. M. NazarSenior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman, MI 49106SUBJECT:D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCYPREPAREDNESS INSPECTION REPORT 05000315/2006501(DRS);
Dear Mr. Nazar:
This refers to the inspection conducted May 1 through August 1, 2006, at the D. C. CookNuclear Power Plant (D. C. Cook) facility and in the NRC Region III offices. The purpose of theinspection was to review emergency action level and emergency plan changes, and to follow up on the Unresolved Item No.05000316/2004006-04, "Potential Decrease in Effectiveness of the Steam Generator Secondary Side Release Emergency Action Level." The enclosed report presents the results of this inspection. This inspection was an examination of activities conducted under your license as they relate tosafety and compliance, with the Commission's rules and regulations, and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.Based on the results of this inspection, an apparent violation was identified and is beingconsidered for escalated enforcement action, in accordance with the NRC Enforcement Policy.The current Enforcement Policy is included on the NRC's Web site at www.nrc.gov; selectWhat We Do , Enforcement , then Enforcement Policy. The apparent violation of 10 CFR50.54(q) and 10 CFR 50.47(b)(4), involved changes made to a D. C. Cook emergency planemergency action level (EAL), which appeared to have resulted in a decrease in the effectiveness of the plan. Specifically, on April 16, 2003, D. C. Cook changed the previously NRC approved EAL scheme. The change was associated with the Fission Product Barrier Matrix EAL for a loss of containment barrier due to a steam generator secondary side release, and involved the inclusion of a non-conservative criteria for a release to the environment to occur for at least 30 minutes before meeting this EAL. As changed, the EAL appeared to reduce the number of classifiable events (General Emergency, Site Area Emergency, and Unusual Event) by M. Nazar-2-excluding those events which resulted in release durations to the environment for events of30 minutes or less. This addition of the time criteria could also delay the declaration of an event until the 30 minutes had been reached. The NRC regulations in 10 CFR 50.54(q) permit alicensee to make emergency plan changes without NRC approval only if the changes do notdecrease the effectiveness of the plan.The circumstances surrounding this apparent violation, the significance of the issue, and theneed for lasting and effective corrective actions, were discussed with members of your staff during a telephone exit on August 1, 2006. As a result, it may not be necessary to conduct a predecisional enforcement conference in order to enable the NRC to make an enforcementdecision.Before the NRC makes its enforcement decision, we are providing you an opportunity to either:(1) respond to the apparent violation addressed in this inspection report within 30 days of the date of this letter, or (2) request a predecisional enforcement conference. If a conference is held, it will be open for public observation. The NRC will also issue a press release toannounce the conference. Please contact Kenneth Riemer at 630-829-9757 within 7 days of the date of this letter to notify the NRC of your intended response.If you choose to provide a written response, it should be clearly marked as a "Response to AnApparent Violation in Inspection Report Nos. 05000315/2006501; 05000316/2006501; EA-06-177" and should include for the apparent violation: (1) the reason for the apparentviolation, or, if contested, the basis for disputing the apparent violation, (2) the corrective stepsthat have been taken and the results achieved, (3) the corrective steps that will be taken toavoid further violations, and (4) the date when full compliance will be achieved. Your responsemay reference or include previously docketed correspondence, if the correspondence adequately addresses the required response. If an adequate response is not received within the time specified or an extension of time has not been granted by the NRC, the NRC willproceed with its enforcement decision.In addition, please be advised that the characterization of the apparent violation described inthe enclosed inspection report may change as a result of further NRC review. You will beadvised by separate correspondence of the results of our deliberations on this matter. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if you choose to provide one) will be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's M. Nazar-3-document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy,proprietary, or safeguards information so that it can be made available to the Public without redaction.
Sincerely,
/RA/Cynthia D. Pederson, DirectorDivision of Reactor SafetyDocket Nos. 50-315; 50-316License Nos. DPR-58; DPR-74Enclosure:Inspection Report 05000315/2006501; 05000316/2006501 w/Attachments: Supplemental Informationcc w/encl:J. Jensen, Site Vice PresidentL. Weber, Plant Manager G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists S. Stewart, Training Manager
SUMMARY OF FINDINGS
IR 05000315/2006-501, IR 05000316/2006-501; 05/01/2006-07/20/2006; D. C. Cook NuclearPower Plant, Units 1 and 2, Emergency Preparedness Inspection.This report covers on-site and in-office followup for an Unresolved Item (05000316/2004006-04,"Potential Decrease in Effectiveness of the Steam Generator Secondary Side Release EAL"). The inspection was conducted by a regional inspector. One apparent violation was identified during the inspection. The significance of most findings is indicated by their color (Green,
White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process" (SDP). Findings for which the SDP does not apply may be "Green" or be assigned a severity level after NRC management review. The NRC's program for overseeing the safeoperation of commercial nuclear power reactors is described in NUREG-1649, "ReactorOversight Process," Revision 3, dated July 2000.A.Inspector-Identified and Self-Revealed Findings
Cornerstone: Emergency Preparedness
- The inspectors identified an apparent violation of 10 CFR 50.54(q) involving 10 CFR50.47(b)(4). Title 10, Part 50, Section 54(q) of the Code of Federal Regulations states in-part, "the nuclear power reactor licensee may make changes to these plans without Commission approval only if the changes do not decrease the effectiveness of the plans and the plans, as changed, continue to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to this part." Title10, Part 50, Section 47(b)(4) of the Code of Federal Regulations states in part, "a standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters,is in use by the nuclear facility licensee." The licensee made and implemented achange to its emergency plan emergency action level (EAL) scheme on April 16, 2003, which appeared to decreased the effectiveness of the emergency plan without prior
NRC approval. Specifically, the licensee changed the EAL to remove the condition, "release ofsecondary coolant from the associated steam generator to the environment is occurring," from the Fission Product Barrier Matrix EAL for a loss of containment barrier due to a steam generator secondary side release. The revised emergency action level,
"secondary line break outside containment results in release (greater than 30 minutes)to the environment," added a non-conservative 30 minutes before meeting this emergency action level. There is a potential that a release condition could have existed which would not have been declared, resulting in either no action or delayed action by off-site authorities when measures to protect the health and safety of the public were warranted. In a previous 1995 correspondence between the NRC and the licenseeconcerning a proposal to revise the licensee's EALs, the licensee proposed to implement a similar change to its EALs; however, the NRC specifically provi ded awritten response to the licensee which indicated that a revision to the EAL which included a 30 minute criteria was unacceptable.
2The apparent violation was considered to be more than minor because the licenseemade changes to the emergency plan and procedures that decreased the effectiveness of the plan without prior approval of the NRC. Because this apparent violation affectedthe NRC's ability to perform its regulatory function, it was evaluated using the traditionalenforcement process. There were no actual emergency events associated with this EAL during the time the change was in effect; however, the failure of the licensee to meet an emergency planning standard involving assessment does have regulatory significance.
(Section 1EP4)
B.Licensee Identified Violations
None.
3
REPORT DETAILS
1.REACTOR SAFETYCornerstone: Emergency Preparedness1EP4Emergency Action Level and Emergency Plan Changes (71114.04)1.1(Closed) Unresolved Item (URI) 50-316/2004006-04
a. Inspection Scope
The inspectors reviewed Revisions 17, 18, 19, and 20 of the D. C. Cook Nuclear PowerPlant Emergency Plan (Plan) to determine if changes identified in these revisions reduced the Plan's effectiveness. The inspectors reviewed a sample of licensee evaluations of the changes in the Plan revisions, to determine if the reviews were performed in accordance with 10 CFR 50.54(q) and if the reviews were adequate. The screening review of Revisions 17, 18, 19, and 20 does not constitute approval of the changes and, as such, the changes are subject to future NRC inspection to ensure thatthe emergency plan continues to meet NRC regulations.During this inspection, the inspectors also reviewed licensee actions to addressURI 50-316/2004006-04 that was identified for a potential decrease in effectiveness fora change made to the Loss of Containment Fission Product Barrier emergency action level (EAL) regarding the Steam Generator Secondary Side Release.These activities completed one inspection sample.
b. Findings
Introduction:
The inspectors identified an apparent violation of 10 CFR 50.54(q)involving 10 CFR 50.47(b)(4) for failure to maintain a standard scheme of EALs.Description: The NRC's requirements related to changes made to the emergency plansand EAL schemes are contained in 10 CFR 50.54(q) and 10 CFR 50.47(b)(4).
Specifically, 10 CFR 50.54(q) states, in part, "A licensee authorized to possess and operate a nuclear power reactor shall follow and maintain in effect emergency plans which meet the standards in 10 CFR 50.47(b) and the requirements in Appendix E of this part. The nuclear power reactor licensee may make changes to these plans without Commission approval only if the changes do not decrease the effectiveness of the plans and the plans, as changed, continue to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to this part." Title 10 CFR Part 50, Section 47(b)(4) of the Code of Federal Regulations states, in part, "A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters,is in use by the nuclear facility licensee..." The licensee must determine if the change isa decrease in effectiveness and if it is, the licensee must obtain prior approval from the NRC before implementing the c hange.
4During a routine baseline EAL and emergency plan change inspection conductedMay 12 through 16, 2004, an Unresolved Item (05000316/2004006-04), was identified when the regional inspectors determined that on April 16, 2003, D. C. Cook changed the previously NRC approved EAL scheme. The change involved the Fission ProductBarrier Matrix EAL for a loss of containment barrier due to a steam generator secondary side release. This revision changed the EAL from:
3.4L Steam Generator Secondary Side Release"Primary to secondary leak rate greater than Tech. Spec. limit -AND-release of secondary coolant from the associated steam generator to the environment is occurring..."
to: 3.3L Steam Generator Secondary Side Release"1a. Primary to secondary leak rate greater than Tech. Spec. limit-AND- 1b. secondary line break outside containment results in release (greater than 30 minutes) to the environment -OR- Release of secondary coolant from the affected steam generator to the environment with an alert alarm on any pressure operated relief valve (PORV) radiation monitor..."The licensee made changes to this EAL in Revision 18 of the Emergency Plan, datedApril 16, 2003. Revision 3 of the emergency plan implementing procedure PMP-2080-EPP-101, "Emergency Classification," dated May 26, 2000, also included the changes made to this EAL. In this procedure, the licensee had modified the procedure to add a statement indicating the basis pages in Attachment 3 of the procedure must be reviewed to insure the full description of the EAL was considered when making a classification.The inspectors also reviewed a previous October 6, 1995 correspondence between the NRC and the licensee associated with proposed changes to the licensee's emergencyplan EALs. In this correspondence, the inspectors noted that the licensee proposed a revision with a similar wording in its EAL; however, the NRC specifically provi ded awritten response to the licensee which indicated that a revision to the EAL which included a 30 minute criteria was unacceptable.During the NRC's after-the-fact review of this change, the licensee was unable to locatethe 10 CFR 50.54(q) review that it performed which demonstrated the licensee's basesfor concluding that the EAL change did not decrease the effectiveness of the emergencyplan and that the plan, as changed, continued to meet the standards of 10 CFR 50.47(b)and the requirements of 10 CFR Appendix E. The licensee did locate a 10 CFR 50.59 safety evaluation of the changes made to PMP-2080-EPP-101, dated May 3, 2000. This 10 CFR 50.59 safety review concluded that adding criteria for secondary side release based on steam generator pressure operated relief valve radiation monitor reading deviated from Nuclear Management and Resource Council (NUMARC) guidance, but was added to simplify and streamline the procedure to allow for faster classification.
5The 10 CFR 50.59 review did not include any discussion of the added 30 minute releasecriteria. When the licensee could not locate its previous 10 CFR 50.54(q) review of theemergency plan change, the licensee performed a re-evaluation of the change made, under 10 CFR 50.54(q), dated September 10, 2004, which concluded that the changedid not decrease the effectiveness of the emergency plan without further justification.Analysis: The inspectors determined that D. C. Cook failed to maintain the emergencyplan's scheme of EALs such that all initiating conditions, which had been assumed in the licensee's approved EALs would result in emergency classifications at appropriate levels. Specifically, the Fission Product Barrier Matrix EAL for a loss of containment barrier due to a steam generator secondary side release, for declaring General Emergencies, Site Area Emergencies, and Unusual Events, was changed, resulting in a decrease in effectiveness of the emergency plan without prior NRC approval. As aresult, the licensee may not have classified events (General Emergency, Site Area Emergency, or Unusual Event) or delayed classification for events with release durations to the environment of 30 minutes or less. A decrease in the General Emergency level of classification would result in decreased protective action recommendations for the off-site authorities, and potentially a reduction in the level of protective action decisions forwarded to the public by off-site authorities. A decrease in the Site Area Emergency and Unusual Event levels of classification could also have resulted in a reduced level of response by off-site authorities if their level of response was based to some extent on which of the three emergency classes was associated with the licensee's emergency declaration.
Enforcement:
Title 10 Part 50, Section 54(q) of the Code of Federal Regulationsprovides, in part, that "a licensee shall follow and maintain in effect emergency plans which meet the standards in 10 CFR 50.47(b) and the requirements of Appendix E of 10 CFR Part 50. The licensee may make changes to the emergency plans without
NRC approval only if the changes do not decrease the effectiveness of the plans andthe plans, as changed, continue to meet the standards of 10 CFR 50.47(b)." Proposed changes that decrease the effectiveness of the approved emergency plans may not be implemented without application to and approval by the NRC. Title 10, Part 50, Section 47(b) of the Code of Federal Regulations requires that theon-site emergency response plans for nuclear power reactors meet each of 16 planning standards, of which, Planning Standard 4 states, in part, "that a standard emergency classification and action level scheme is in use."Title 10, Part 50, Appendix E,Section IV.B of the Code of Federal Regulations states, inpart, "The means to be used for determining the magnitude of and for continually assessing the impact of the release of radioactive materials shall be described, including emergency action levels that are to be used as criteria for determining the need for notification and participation of local and State agencies..." Findings related to the classification of emergencies are findings involving assessment.On April 16, 2003, the licensee made changes without NRC approval to the EALs in itsEmergency Plan that decreased the effectiveness of the plan and resulted in use of a 6non-standard scheme of EALs. Specifically, the licensee changed the EAL to removethe condition, "release of secondary coolant from the associated steam generator to the environment is occurring," from the Fission Product Barrier Matrix EAL for a loss of containment barrier due to a steam generator secondary side release. The revised emergency action level, "secondary line break outside containment results in release (greater than 30 minutes) to the environment," added a non-conservative 30 minutes before meeting this emergency action level. The failure to receive NRC approval priorto changing the EAL scheme is an Apparent Violation of 10 CFR 50.54(q), associated with emergency planning standard 10 CFR 50.47(b)(4) (AV 50-315/06-501-01; 50-316/06-501-01). The licensee's initial corrective actions were completed on May 18, 2006, when the licensee restored the Emergency Plan EAL back to the original NRC approved wording. Training on the restored EAL was completed on May 30,
OTHER ACTIVITIES
4OA6Meetings.1Exit MeetingThe inspectors presented the inspection results to Mr. J. Jensen on August 1, 2006, andother members of licensee management by telephone. The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified. The purpose of the exit was to convey to the licensee the inspection findings and the NRC's initial enforcementassessment of the finding.ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- P. Carteaux, Emergency Preparedness Manager
- H. Etheridge, Compliance Specialist
- C. Graffenius, Emergency Preparedness Coordinator
- J. Newmiller, Compliance Specialist
- M. Peifer, Vice President of Services
- A. Rodriquez, Security
- M. Scarpello, Regulatory Affairs Supervisor
- D. Schroeder, Emergency Preparedness Coordinator
- S. Simpson, Safety Assurance Director
- L. Weber, Plant Manager
- V. Woods, Performance Assurance ManagerNuclear Regulatory Commission
- B. Kemker, Senior Resident Inspector
- J. Lennartz, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
05000315/2006501-01;05000316/2006501-01AVFailure to Provide Complete and Accurate Information tothe NRC Which Impacted A Licensing Decision.
(Section 1R11)
Closed
05000316/2004006-04URIPotential Decrease in Effectiveness of the SteamGenerator Secondary Side Release EAL
2
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection.
- Inclusion on this list doesnot imply that the NRC inspectors reviewed the documents in their entirety but rather selected